Component Overview
Float Requirement is the quantity of spares to be maintained to meet the desired service levels. The “Manage Float Forecast Plan” screen enables the user to generate Forecast Plan that can be invoked in predefined frequency for float computation. The various criteria for Float Forecast Plan generation will be referencing to Part Attributes, Pool, Customer attributes, Aircraft attributes, etc..
Float Computation will be done based on various participating parameters that can be derived from multiple transactions or manual entry or from the master definition. The parameters based on which the float computation is performed are Utilization History, Utilization Projection, Unscheduled Demand Removals, Scheduled Demand Removals, Scheduled Demand Projections, MTBUR, Purchase Turn Around Time, Repair Turn Around Time, Scrap Rate, Purchase Costs, Repair Costs and Service Levels.
The forecasted values are optimized and the float quantity is computed. The float optimization is performed using statistical methods.
Getting familiar with the pages inside
Go to page… |
For… |
Maintain Time Types for Lead Time |
|
Manage Costs |
|
Manage Demand |
|
Manage Float Forecast Plan |
|
Manage Float Plan and Run |
|
Manage Lead Time |
|
Manage MTBUR |
|
Manage Scrap Rate |
|
Manage Utilization |
|
Manage Lead Time Definition |
|
Set Float Management Parameters |
|
Manage Default Lead Time Definition |
|
Manage Float Run |
|
Review Float Results |