<<

Name
   Unified Glossary
   Managing engineering drawings
    Original Equipment Manufacturer
NATO
NATO Supply Code
    Manufacturer
NAVAIDS
Navigational Aids
    Tactical Air Navigation Channel
Near
Negative Tolerance
Net
Net Quantity
Nettable
New
New Config
New Revision
New Revision Type
Newly Overhauled
Next Empty Storage
Next Higher Assembly
    changing
Next Higher Assembly Part Number
Next Higher Assembly Serial Number
NHA
    number
NHA Component
NHA Part
NHA Serial
Night Vision Goggles Events
No Impact
Non
Non Issuable Input
Non-components can be
Non-Routine Task
None
None – Indicates
Normal
Normal Storage Type
Normal View
Normal Zone Type
Normal – Material
Normal – Purchase
Normal – The
Normal – When
Not Allowed
   Managing product structure
   Unified Glossary
Not Applicable
NSCM
NT
NT Close
Number
   Unified Glossary
   Defining product structure details
    APUs
    NHA
    Packs
    Type
    Units
Numeric ISO Currency Code
NVG Events



Object
    Planning
Object Type
    Planning
Observed
Observed Faults
Occ
    Default Time Zone
Occupation
Occurrence Occurred During
Occurrence Report
Occurrence Type
OEM
OEM Faults
OEM Name
Off
Off-Wing
Old Config
On Loan
   Copying product structure
   Viewing bill of materials
   Defining product structure details
On-Wing
One Time
One Way
Online Help
Only "Confirmed
Only At
Open Access Panel Task
Open Periods
Opening
    Balance
Operating
    Frequency
Operational
Operational Date
Operational Implications
Operational Location
Operations Related Savings
Operations Type
Operator
Opportunity Maintenance
Optional
Order
    Engineering
    Location
    Preference
Order Number
    Engineering
Order Quantity
Order/task using the
Org
    Invoicing
    Requesting
Organizational Unit
Original Equipment Manufacturers
    name
Others
Others – Indicates
OU
   Managing product structure
   Unified Glossary
OU Description
Out Source
Outgoing
    Condition
    Part
    Serial
Oven
Overall Rating
Overhaul
Overhaul – Indicates
Overtime Processing
Overtime Rates
Owned
Owned – Indicates
Ownership Document



P.R.
P.R.Date
P/N
P/N Change Allowed
P1
   Managing product structure
   Unified Glossary
P2
   Managing product structure
   Unified Glossary
P3
P4
P5
Packaging
    Code
    Condition
    Method
    Terms
Packs
    Number
    Slip
page
    ILBO
Page appears
   Managing product structure
   Managing engineering drawings
page-two pages open simultaneously
Parameter
    Triggering
Parameter Based Charges
Parameter Interval
Parameter Source
Parameter Type
Parent CWO
Parent Delivery Area Code
Parent Work Center
Parent Work Center Description
Paris
Part
   Managing product structure
   Unified Glossary
   Mapping parts to process
   Managing engineering drawings
   Defining product structure details
    Job Information
    Mapping
    Outgoing
    Reliability Fleet
Part Account Group
Part Administration
   Managing product structure
   Unified Glossary
Part Category
Part Classification
Part Condition
Part Control Type
Part Cost
Part Description
   Managing product structure
   Unified Glossary
   Copying product structure
   Viewing bill of materials
   Mapping parts to process
   Defining product structure details
Part Failed Date
Part Identifier
Part Manufacturing
Part Number
Part Ownership
Part Quantity
Part Rating
Part Serial
Part Source
   Copying product structure
   Viewing bill of materials
   Defining product structure details
Part Type
   Managing product structure
   Unified Glossary
   Copying product structure
   Viewing bill of materials
   Defining product structure details
Partially Accepted
Partially Amended
Particular product
   Managing product structure
   Managing product structure
    approve
Partner
    Trading
Parts Expense Basis
Pass
Pax
Pay Term
Pay Term Type
Payment Currency
Payment Priority
PBH
PBH Agreement
PBH Exchange
PBH On
PC
PC Maximum Value
PC Minimum Value
PC Type
PC1
Pending
    Issue Qty
    Return Qty
Per Asset Value
Per Cost
Percentage
Percentage Completed
Percentage – The TCD
Performing
    EO
Period
    Holding
Personnel Related
Phantom
Phantom Part
   Viewing bill of materials
   Defining product structure details
Phased Out
Physical Inventory
Physical Inventory Plan Number
PI
PI Plan
Picking
    Priority
    Strategy
Piece Part
Pilot
Pilot Activity
PIREP
Placement Priority
Placement Strategy
Placing
    Purchase Orders
Plan Demand Qty
Plan Demands
Plan Level
Plan Receipt Qty
Plan Type
Planned – Indicates
Planner Group
Planning
    Action
    Base
    Object
    Object Type
    Status
    Type
Planning Object Numbers
Planning Object Types
Plumbing Services
PO
    create
PO Additional Charges
PO Basic Value
PO Covered Qty
PO Currency
PO Line
PO Total Value
PO Type
Point
    Shipping
Poolable
Position Code
Position Control ID
Position Formula
Position Type
Positive Tolerance
Post Order Lead Time
Postings
Power By Hour Agreement
PP Description
PR
PR Type
PR Value
Pre
Pre Order Lead Time
Pre-closed – The status
    the ESR
Precedence CWO
Preference
    Order
Preferred Model
Preferred Supplier
Premature Removal Rate
Pressure Altitude
Previous Part
previous record
Price Held Firm Time
Price List
    sends
Price Rating
Primary Output
Primary Skill
Primary Work Center
Prime Part Number
Principal Part
Priority
    Picking
Problem Demand
Problem Quantity
Proceed
Process Action
Process Order Lead Time
Process Plan
Processing
   Managing product structure
   Unified Glossary
   Mapping parts to process
    Map Parts
    Remarks
    Save Parameters
Procure
   Viewing bill of materials
   Defining product structure details
Procurement
   Copying product structure
   Viewing bill of materials
   Defining product structure details
Product structure
   Managing product structure
   Copying product structure
   Updating revision for product structure
   Managing engineering drawings
   Defining product structure details
    Copying
    Managing
Product Structure Details
   Managing product structure
   Defining product structure details
    Defining
Product Structure List
Productivity Factor
Program Category
Program Revision
Project – Indicates
Provisions
    MEL
Proximity Indicator
PRR
PS Category
   Copying product structure
   Viewing bill of materials
PS Class
   Managing product structure
   Copying product structure
   Viewing bill of materials
   Managing engineering drawings
   Defining product structure details
PS Exists
PS Part
   Managing product structure
   Viewing bill of materials
   Defining product structure details
    defined
    details
PS Revision
   Managing product structure
   Viewing bill of materials
   Managing engineering drawings
PS Status
   Managing product structure
   Updating revision for product structure
Published Date
Purchase
Purchase Committee
Purchase Lead Time
Purchase Order
    placing
Purchase Request
Purchase UOM
pushbutton
   Basics of using a typical web page
   Managing product structure
   Updating revision for product structure
Pushbutton to
   Managing product structure
   Copying product structure
   Updating revision for product structure
   Managing engineering drawings
Pushbutton to inactivate the
Pushbutton to resequence
Pushbuttons


>>