<<
Hangar
Hangar Work Order
Hard
Hard Allocation Required
Hard" - Denotes
Has closed
Hence ATA 21
High
Historical Period
Unscheduled Cost Calculation
Hold
Period
Hold Buy
Hold Pay
Holiday Master
Horizon
Forecasting
Hours
Flying
Hours for
Hours using
HR
HR Set Up
HR Set Up Unit
Human Resource Management Process
Hyperlinked
Managing product structure
Defining product structure details
IATA
ICAO
icons on tool bar
ID
Identifying
approver
Type Certificate
Unit
Improvisation
In-House Repairable
Inactive
Managing product structure
Unified Glossary
Managing engineering drawings
Incident Type
Including
Dependent Status
INCO
INCO Term
Incoming
Serial
Incomplete
Incomplete – When
Incremented
Indefinite
Indicates
Indicates that
Indirect
Induction Date
Industry
Inflight Delay
Informational
Informative
Initial Accuracy
Initial Monthly Reliability Alert
Initial Reliability Alert
Inprogress
insert record
Inspected By
Inspected Date
Inspection
Inspection Cost Reimbursement
Inspection Qty
Inspection Type
Inspection – Indicates
Inspector
Installation Date
Installation Time
Installed By
Installed Comp
Insurance Amount
Insurance By
Insurance Liability
Insurance Terms
Interchangeability
Interchangeable
Interchangeable Part
Internal
Internal – Indicates
International Air Transport Association Number
International Civil Aviation Organization Number
International Commercial Term
International Organization
Standardization
Interval Value
Inventory
Unified Glossary
Viewing bill of materials
Defining product structure details
Inventory Part
Invoice Matching
Invoicing
Org
In–Situ
IPC
Is fitted on the
ISO
ISO Currency Code
Issuable Input
Issue Date
Issue Method
Issue Part
Issue Qty
Pending
Issue Warehouse
Issued Quantity
Issued Serial
Issuing
CoM
Job Classification
Job Information
part
Job Source
Job Status
Job Type
Journey Log
Junior Management
Kg / Hour
Kit
Kit Part
Labor Cost
Landing
Cycles
Date
Landing Gear
Last Forecast
Last Generated No
Last In First Out
Last Modified
Managing product structure
Managing engineering drawings
Defining product structure details
Last Modified By
Last Modified Date
Managing product structure
Unified Glossary
Managing engineering drawings
Defining product structure details
Last Performed Date
last record
Later than
Lead Time
Lead Time Units
Lease Type
Leased
Leased Out
Lens
Level Code
Unified Glossary
Viewing bill of materials
Library
Library Operations
License Category
Life
Remaining
Life Parameter
LIFO
Limit Control
Limit Type
Line Item Cost
Line Item Value
link
Link Flag
Listing
FAA
Loan
Loan Agreement
Loan Order
Loan Receipt
Loan – Indicates
Loanee
Location
Unified Glossary
Managing engineering drawings
Drawing
Ordering
Requesting
Log Book
login
logout
Lot
Lot & Serial Controlled
Lot Controlled
Lot No Controlled
Lot No Type Num
Lot Quantity
Lot Quarantined Qty
Low
Lower Level Exists
Copying product structure
Defining product structure details
LRU
Main Core
Maint Report
Maintain Planning Information
Managing product structure
Defining product structure details
Maintain Quick Codes
Maintained In Library
Maintenance
Maintenance Base
Maintenance Change Request
Maintenance Change Request Class
Maintenance Change Request Document Type
Maintenance Change Request Number
Maintenance Implications
Maintenance Issue Transaction
Maintenance Planning Document
Maintenance Planning Document Tasks
Maintenance Process
Maintenance Program
Maintenance Type
Make
Managing product structure
Copying product structure
Viewing bill of materials
Defining product structure details
Make Part
Make – Indicates
Make/Piece Part
Manage Engineering Drawing
Manage Engineering Drawings
Managing product structure
Managing engineering drawings
Defining product structure details
Manage Manufacturing Information
Manage Process Plan
Managing product structure
Managing engineering drawings
Manage Product Structure
Managing product structure
Copying product structure
Viewing bill of materials
Updating revision for product structure
Managing engineering drawings
Manager
Managerial Job
Managing
product structure
Mandatory
Manual
Unified Glossary
Updating revision for product structure
Defining product structure details
Manual – Indicates
Manual – The
Manufacture
Manufacturer
NATO Supply Code
Manufacturer ATA
Manufacturer Code
Manufacturer Lot
Manufacturer Part Number
Manufacturer Parts
Manufacturer Serial
Manufacturer Sl No
Map Parts
Process
mapped to another record
Mapping
Unified Glossary
Mapping parts to process
parts
Status
Marital Status
Master
Science
Matching
Type
Material
Unified Glossary
Viewing bill of materials
Bill
View Bill
Material Controller
Material Cost
Material Request
Material Specification
Material Type
Matl Return Authority
Max
Max Remaining Life
Max.Active Forecasts
Maximum OT Hours
Maximum Reimbursement
Maximum Zone
MCM
MCR Class
MCR Doc Type
MCR Issue Date
MCR Part
MCRs
existing
regarding
Terminating
Mean Time Between Failures
Mean Time Between Unscheduled Removals
Measurement
Mechanic
Medium
MEL
provisions
MEL Category
MEL item
MEL Quantity
Message Center
Method
Packaging
Shipping
Middle Management
Min
Min-Max
Minimum Equipment List
Minimum Equipment List Quantity
Minimum Lot
Minimum Order Qty
Minimum Remaining Life
Minimum Shelf Life
Minimum Zone
Minutes
MIREP
Miscellaneous
Miscellaneous – Indicates
Mod
Mod Status
MOD Tasks
Mode is
Model Configuration
Updating
Modification Committee Meeting Number
Modified Part Applicability
Monthly Reliability Alert
ATA System
Component
Months
Moved Qty
Moving
Average
Moving Average
MPD Tasks
MPDs
MR
MR Class
MR Priority
MR Type
MSG
MSN
gives
MTBF
MTBR
MTBUR
multiline item
delete
Multiple
Multiple – Indicates
>>