<<

Hangar
Hangar Work Order
Hard
Hard Allocation Required
Hard" - Denotes
Has closed
Hence ATA 21
High
Historical Period
    Unscheduled Cost Calculation
Hold
    Period
Hold Buy
Hold Pay
Holiday Master
Horizon
    Forecasting
Hours
    Flying
Hours for
Hours using
HR
HR Set Up
HR Set Up Unit
Human Resource Management Process
Hyperlinked
   Managing product structure
   Defining product structure details



IATA
ICAO
icons on tool bar
ID
Identifying
    approver
    Type Certificate
    Unit
Improvisation
In-House Repairable
Inactive
   Managing product structure
   Unified Glossary
   Managing engineering drawings
Incident Type
Including
    Dependent Status
INCO
INCO Term
Incoming
    Serial
Incomplete
Incomplete – When
Incremented
Indefinite
Indicates
Indicates that
Indirect
Induction Date
Industry
Inflight Delay
Informational
Informative
Initial Accuracy
Initial Monthly Reliability Alert
Initial Reliability Alert
Inprogress
insert record
Inspected By
Inspected Date
Inspection
Inspection Cost Reimbursement
Inspection Qty
Inspection Type
Inspection – Indicates
Inspector
Installation Date
Installation Time
Installed By
Installed Comp
Insurance Amount
Insurance By
Insurance Liability
Insurance Terms
Interchangeability
Interchangeable
Interchangeable Part
Internal
Internal – Indicates
International Air Transport Association Number
International Civil Aviation Organization Number
International Commercial Term
International Organization
    Standardization
Interval Value
Inventory
   Unified Glossary
   Viewing bill of materials
   Defining product structure details
Inventory Part
Invoice Matching
Invoicing
    Org
In–Situ
IPC
Is fitted on the
ISO
ISO Currency Code
Issuable Input
Issue Date
Issue Method
Issue Part
Issue Qty
    Pending
Issue Warehouse
Issued Quantity
Issued Serial
Issuing
    CoM



Job Classification
Job Information
    part
Job Source
Job Status
Job Type
Journey Log
Junior Management



Kg / Hour
Kit
Kit Part



Labor Cost
Landing
    Cycles
    Date
Landing Gear
Last Forecast
Last Generated No
Last In First Out
Last Modified
   Managing product structure
   Managing engineering drawings
   Defining product structure details
Last Modified By
Last Modified Date
   Managing product structure
   Unified Glossary
   Managing engineering drawings
   Defining product structure details
Last Performed Date
last record
Later than
Lead Time
Lead Time Units
Lease Type
Leased
Leased Out
Lens
Level Code
   Unified Glossary
   Viewing bill of materials
Library
Library Operations
License Category
Life
    Remaining
Life Parameter
LIFO
Limit Control
Limit Type
Line Item Cost
Line Item Value
link
Link Flag
Listing
    FAA
Loan
Loan Agreement
Loan Order
Loan Receipt
Loan – Indicates
Loanee
Location
   Unified Glossary
   Managing engineering drawings
    Drawing
    Ordering
    Requesting
Log Book
login
logout
Lot
Lot & Serial Controlled
Lot Controlled
Lot No Controlled
Lot No Type Num
Lot Quantity
Lot Quarantined Qty
Low
Lower Level Exists
   Copying product structure
   Defining product structure details
LRU



Main Core
Maint Report
Maintain Planning Information
   Managing product structure
   Defining product structure details
Maintain Quick Codes
Maintained In Library
Maintenance
Maintenance Base
Maintenance Change Request
Maintenance Change Request Class
Maintenance Change Request Document Type
Maintenance Change Request Number
Maintenance Implications
Maintenance Issue Transaction
Maintenance Planning Document
Maintenance Planning Document Tasks
Maintenance Process
Maintenance Program
Maintenance Type
Make
   Managing product structure
   Copying product structure
   Viewing bill of materials
   Defining product structure details
Make Part
Make – Indicates
Make/Piece Part
Manage Engineering Drawing
Manage Engineering Drawings
   Managing product structure
   Managing engineering drawings
   Defining product structure details
Manage Manufacturing Information
Manage Process Plan
   Managing product structure
   Managing engineering drawings
Manage Product Structure
   Managing product structure
   Copying product structure
   Viewing bill of materials
   Updating revision for product structure
   Managing engineering drawings
Manager
Managerial Job
Managing
    product structure
Mandatory
Manual
   Unified Glossary
   Updating revision for product structure
   Defining product structure details
Manual – Indicates
Manual – The
Manufacture
Manufacturer
    NATO Supply Code
Manufacturer ATA
Manufacturer Code
Manufacturer Lot
Manufacturer Part Number
Manufacturer Parts
Manufacturer Serial
Manufacturer Sl No
Map Parts
    Process
mapped to another record
Mapping
   Unified Glossary
   Mapping parts to process
    parts
    Status
Marital Status
Master
    Science
Matching
    Type
Material
   Unified Glossary
   Viewing bill of materials
    Bill
    View Bill
Material Controller
Material Cost
Material Request
Material Specification
Material Type
Matl Return Authority
Max
Max Remaining Life
Max.Active Forecasts
Maximum OT Hours
Maximum Reimbursement
Maximum Zone
MCM
MCR Class
MCR Doc Type
MCR Issue Date
MCR Part
MCRs
    existing
    regarding
    Terminating
Mean Time Between Failures
Mean Time Between Unscheduled Removals
Measurement
Mechanic
Medium
MEL
    provisions
MEL Category
MEL item
MEL Quantity
Message Center
Method
    Packaging
    Shipping
Middle Management
Min
Min-Max
Minimum Equipment List
Minimum Equipment List Quantity
Minimum Lot
Minimum Order Qty
Minimum Remaining Life
Minimum Shelf Life
Minimum Zone
Minutes
MIREP
Miscellaneous
Miscellaneous – Indicates
Mod
Mod Status
MOD Tasks
Mode is
Model Configuration
    Updating
Modification Committee Meeting Number
Modified Part Applicability
Monthly Reliability Alert
    ATA System
    Component
Months
Moved Qty
Moving
    Average
Moving Average
MPD Tasks
MPDs
MR
MR Class
MR Priority
MR Type
MSG
MSN
    gives
MTBF
MTBR
MTBUR
multiline item
    delete
Multiple
Multiple – Indicates


>>