Record Aircraft Maintenance Execution Details – A summary of the activity

This activity enables you to create and update the aircraft maintenance execution (AME) details for an aircraft. The aircraft maintenance execution reference document is essentially a line work order, designed to manage all aspects including hangar work execution. For every journey, an aircraft maintenance execution reference is created.  The user can create multiple Aircraft Maintenance Execution references for the same aircraft.

The Aircraft Maintenance Execution Reference serves the following purposes:

 

 

 

 

 

 

 

 

 

Getting familiar with the pages & controls

Go to

To carry out the task

Left pane navigation page

The tree interface will be loaded dynamically with the corresponding details of the Discrepancies, Component Replacements, Open Log List, Work Information and “Material Request” to facilitate the user to perform the activities faster.

“Discrepancies” pushbutton

Updating discrepancies about the aircraft, into the aircraft maintenance execution reference.

“Component Replacements” pushbutton

Updating component replacement information, into the aircraft maintenance execution reference

“Work Information” pushbutton

Updating the work information for the aircraft maintenance execution reference.

“Open Items” pushbutton

Updating aircraft maintenance execution reference information for the aircraft.

“Material Request” pushbutton

Updating the material request details for the aircraft maintenance execution reference.

Record Aircraft Maintenance Execution Details

Recording Aircraft Maintenance Execution Reference Details

Edit Discrepancy Additional Information

Editing discrepancy additional information

Edit Task Additional Information

Editing task additional information

Edit Package Additional Information

Editing package additional information

 

 

 

 

 

 

 

 

 

 

 

 

 

What you can do in this activity

Create aircraft maintenance execution reference for the aircraft

Process discrepancy

Defer Discrepancy

Record work information

Record or modify the component replacement information

Record material request details.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Create aircraft maintenance log for the aircraft

You can create or modify a aircraft maintenance execution reference for an aircraft. Aircraft maintenance execution reference details comprise the discrepancies reported and the action taken for resolving the discrepancy in the aircraft before the commencement of the journey.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Process discrepancy

Discrepancies are typically the deviations from the intended standard of the aircraft, which are observed by the person in charge, such as the pilot, mechanic or the cabin crew. The pilot, the mechanic or the cabin crew reports the discrepancies in the journey log or aircraft maintenance log. The discrepancies can be resolved in the” Hangar Work Order”, “Component Work Order” or "Aircraft Maintenance Log” components.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 Defer Discrepancy

Discrepancies can also be deferred or carried forward, in instances of non-availability of spares or resources, non-equipped maintenance station, or to avoid delay. A maintenance report can be generated to defer discrepancies of a similar nature.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Record work information

Execution details of the work units carried out can be specified here. Work information maintains the details about the type of work to be carried out for the aircraft maintenance execution reference. Signing-off of work unit at task level can also be done.  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Record or modify the component replacement information

Recording of component replacement details provide information as to which part number and serial number must be removed from which position code and which component must be installed. Discrepancy(s) reported on the component might also mandate the component to be removed from the aircraft. These replacements are reflected in the physical configuration of the aircraft. A component replacement number is generated for every replacement of the component during confirmation.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Record material request details.

Material Request is a document through which a user department communicates the need for material (required for execution of a job) on a specific date to the respective stocking points i.e. warehouses. Also the consumption details against the issued material can be maintained. The issued part(s) details for the aircraft maintenance execution reference are displayed in the “Component Replacement” tree under “Issued Parts List”.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Prerequisites