This page allow you to view the details of the selected task. Tell me more
Select the “View Task Details” link in the “Select Task” page.
The “View Task Information” page appears.
The system displays the following:
Date Format |
The format in which the date fields appears in this page. This format is displayed from the "User Preferences" business component based on the login user id. In case the format is not defined, the system displays the date format from the “Enterprise Modeling” business component by default. |
The system displays the following in the “Task Details” group box:
Task Applicability |
Indicates whether the task is applicable for “Aircraft”, “Engine” or “Component”. |
Base Aircraft Model # |
The number identifying the base aircraft model on which the task can be performed |
Task # |
The task selected for viewing. |
Revision # |
The latest revision number for the task. |
Task Type |
The type of the task which could be one of the following: “MPD", "CMM", "MOD", "Non-Routine" or "Others". |
Status |
The current status of the task, which could be one of the following: |
|
|
|
|
|
|
|
|
Task Description |
The textual description of the task. |
Long Description |
The long description of the task. Zoom facility available. |
Revision Type |
The type of the revision which could be “Internal” or “External”. |
Revision Date |
The date on which the task was last revised. |
Task Category |
The category to which the task belongs. |
Task Class |
The class to which the task belongs. The system displays “Non-Standard Task” or “Standard Task”. |
Operations Type |
The operation type of the maintenance activity. |
Work Center # |
The number identifying the work center primarily responsible for executing the work unit. |
Model Effectivity |
The system displays either “All” or “Restricted” depending on the association of models to the task. |
|
|
Customer Effectivity |
Indicates the customer effectivity of the task. The system displays one of the following:
|
The system displays the following in the “Task Additional Details” group box:
Non- Standard Task # |
The non-standard task number, if this task has been converted from a non-standard task. |
Task Description |
The textual description of the task |
ATA # |
The ATA chapter number that indicates the system in which the task has to be performed. |
System Description |
The textual description of the ATA chapter. |
DSC # |
The dependent system condition to which the task is associated. |
|
|
DSC Description |
The textual description of the dependent system condition. Zoom facility available |
Est. Man Hrs. |
The total man-hours estimated for the “skill” type resources to complete the task. |
Insp. Man Hrs. |
The total man hours required for inspection. |
Est. Elapsed Time
|
The total time estimated for completing the task. The estimated elapsed time also includes time required for performing pre-execution or post-execution activities. |
|
The unit of measurement for the estimated time, which could be “Minutes”, “Hours” or “Days”, is displayed alongside. |
Wrench Time |
The total time estimated for the actual execution of the task. |
Ideal Time |
The ideal time recommended by the OEMs for the completion of the task. |
Exec. Phase |
The execution phase of the task, such as Preparatory, Regular and Post-Flight. |
The system displays the following in the “Sub-Tasks” multiline:
Seq # |
The sequence in which the sub task has to be performed, while executing the maintenance task. |
Sub Tasks |
The sub task that has to be performed while executing the maintenance task. |
Resource group |
The resource group for performing the sign-off of the sub-task. The system displays one of the following:
|
Document ID |
The name of the reference document which contain the description, drawing or any other detail about the sub task. |
File Name |
The filename of the document. |
|
|
AMM / CMM Item # |
The Aircraft Maintenance Manual or the Component Maintenance Manual item number of the sub-task |
MPD Item # |
The Maintenance Planning Document item number of the sub-task. |
DSC # |
The dependent system condition to which the sub-task is associated. |
|
|
DSC Description |
The textual description of the dependent system condition. |
Parameter Readings? |
Indicates whether the parameter readings are defined for the sub-task. The system displays “Yes” or “No”. |
Select the “View AMM Reference” link, to view the details of the aircraft maintenance manual for the sub-task selected in the multiline.
The system displays the following fields in the “Reference Details” group box:
Related Task # |
The task related to the task being viewed. |
AMM / CMM Item # |
The Aircraft Maintenance Manual or the Component Maintenance Manual item number. |
Source Document # |
The reference document number based on which the task has been generated. |
Source Document Type |
The type of the source document, which could be “Engineering Order”, “A/C Maint. Exe. Ref #”, “Discrepancy Processing”, “Component Work Order, “Hangar Work Order” "Line Operation" or “Others”. |
Manufacturer # |
The code of the manufacturer from which the task originated. |
Manufacturer Name |
The name of the manufacturer. |
Click the hyperlinked manufacturer name, to view the manufacturer details.
MPD Item # |
The Maintenance Planning Document item number of the task. |
Work Location Ref. # |
The work location reference number of the task. |
User Defined 1 |
Any additional information concerning the task. |
User Defined 2 |
Any additional information concerning the task. |
The system displays the following fields in the “Document Attachment Details” group box:
File Name |
The file name of the document that is attached to the task. Zoom facility available. |
Click the hyperlinked file name, to view the file details.
The system displays the following field:
Link Info |
Indicates whether part, resource details or notes are entered for the task. The system displays one of the following: |
|
|
|
|
|
|
|
|
|
|
|
|
The system displays the following in the “Record Statistics” group box:
Created by |
The name of the user who created the task. |
Created Date |
The date on which the task was originally created. |
Last Modified by |
The name of the user who last modified the task. |
Last Modified Date |
The date on which the task was last modified. |
Approved by |
The name of the user who approved or activated the task. |
Approved Date |
The date on which the task was approved |
The system displays the following field:
Comments |
.Any additional comments or remarks pertaining to the task. |
To proceed, carry out the following
Select the “View Part Requirements” link at the bottom of the page to view the parts required for executing the task.
Select the “View Resource/sign-off Requirements” link at the bottom of the page to view the resources/sign-off information required for executing the task.
Select the “View Schedule Details” link at the bottom of the page to view the periodicity details for the task.
Select the “View Model Effectivity” link at the bottom of the page to view the model effectivity details for the task.
Select the “View Component Effectivity” link at the bottom of the page to view the component effectivity details for the task.
Select the “View Access Panel Details” link at the bottom of the page to view the access panel details for the task.
Select the “View Work Area / Zone Details” link at the bottom of the page to view the work area or zone details for the task.
Select the “View Notes” link at the bottom of the page to view the notes entered for the task.
Select the “View Task / Sub-Task References” link at the bottom of the page to view the reference document details for the task.
Select the “View Certificate Coverage” link from the bottom of the page to view the certificate coverage details.
Select the “View Aircraft Effectivity” link at the bottom of the page to view the task applicability of the aircraft.
Select the “View Parameter Reading / Eval. Form” link at the bottom of the page to view the parameter details for the task/sub-task.
Select the “View Customer Effectivity” link at the bottom of the page, to view the customer effectivity details for the task.
Select the “View Task Card” link at the bottom of the page to view the task card created in the third party application.
Refer to the “Task Card Publisher” Online help for more details.
Select the “View AMM Reference” link at the bottom of the page, to view the details of aircraft maintenance manual for the task.
Select the "Launch Technical Document” link at the bottom of the page to view details for the technical documentation.
Refer to the “Technical Document Interface” Online help for more details.
Viewing task information– An overview
You can view the details of the selected task in this page. General details pertaining to the task such as task effectivity, base aircraft model number, task number, description, status, revision number, revision type, revision date, task category and task type are displayed by the system. You can also view the details of related tasks, and sub tasks.
The system denotes whether you have entered notes, parts and resource details for the task.