Viewing reference details for task
This page allows you to view the reference information for the task. Tell me more
Select the “View Task / Sub Task References” link at the bottom of the “View Task Information” page.
The “View Task References” page appears.
The system displays the following fields:
Task Applicability |
Indicates whether the task is applicable for “Aircraft”, “Engine” or “Component”. |
Revision # |
The revision number of the task for which the work area or zone details are displayed. |
Task # |
The task selected for viewing. |
Base Aircraft Model # |
The number identifying the base aircraft model on which the task can be performed |
Task Description |
The textual description of the task. Zoom facility available |
Enter the following fiels in the “Sub-Task Details” group box:
Sub Task Line # |
Use the drop-down list to select the sub task line item number for which the reference information needs to be updated. The system lists all the sub tasks associated to the task. |
Click the “Get Details” pushbutton to retrieve the reference details for the task - sub task combination.
The system displays the following fields in the “Reference Document Details” multiline:
Reference Doc Type |
The type to which the reference document belongs. |
Document ID |
The number identifying the referenced document, that contains the details of the task. |
File Name |
The file name of the document. |
Click the hyperlinked file name, to view the file details.
Viewing reference details for task – An overview
This page allows you to view the reference information for the task or sub task. The execution of task or sub task might involve referencing documents, manuals, drawings, etc. These details are recorded as the reference information “Edit References Information” in the page.
Details such as the document type, reference document number and the path where the reference document resides are displayed in the multiline.