Recording reference details

Managing Engineering Document

Unified Glossary

Basics of using a typical web page

Using Online Help

This tab allows you to define references for the engineering document. You can define an Aircraft applicable Maintenance Change Request (MCR) as reference for a Component / Engine applicable Engineering Documents and vice-versa. You can add / modify References based on the option ‘Mandate Revision on Addition of Reference?’set for Engineering Document Type in the “Common Master” business component.

This tab facilitates to synchronize Process Change Request (PCR) and Engineering document. The PCR of the entered MCR is updated with all the Effectivity List in the “Effectivity” tab, with the working Engineering document reference.

References

The system displays the following fields selectively in the “References” multiline, based on the selection of the above-mentioned radio buttons ‘MCR’, ‘Eng. Doc.’ and ‘Others’.

MCR #

The reference number of the maintenance change request which needs to be referenced against the engineering document. The MCR # entered here must be valid as defined in the “Engineering Document” business component, and must have at least one effective Maintenance Object.

When ‘MCR’ mode is selected, you must enter the MCR #, if Rev # and Processing Comments are entered. You can enter MCR having Applicability different from the Applicability of the Eng. Doc.

Note: The applicability of the referenced MCR must also be Component/Engine that is the same as that of the engineering document, if the process parameter "Restrict addition of Aircraft applicable MCR as reference for Component/Engine applicable Eng. Doc." under the entity type "Eng. Doc. Type" and the entity “All User Defined” in the Define Process Parameters activity of Common Master is 1. Similarly, the applicability of the MCR must be Aircraft, the same as that of the engineering document, if the process parameter “Restrict addition of Component/Engine applicable MCR as reference for Aircraft applicable Eng. Doc” is 1.

Help facility available.

Eng. Doc. #

The engineering document for which the details of the MCR references are being updated. The Eng. Doc. # entered here must be valid as defined in the “Engineering Document” business component, and has Applicability same as the Applicability of the Eng. Doc # in the header.

When ‘Eng. Doc.’ mode is selected, you must enter the Eng. Doc. #, if Rev # and Processing Comments are entered.

Help facility available.

Rev #

The revision number of the engineering document / maintenance change request. You must enter the revision number, if more than one Rev # exist for the MCR # / Eng. Doc. # entered.

Note: Ensure the following:

Ref. Doc. Type

Use the drop-down list box to select the type of the reference document. Mandatory. The system lists all the document types defined in ‘Active’ status in the "Create Reference Document Type" activity of the “Common Master” business component.

By default, the system leaves the field blank.

Ref. Document #

The number identifying the document that must be referred during engineering document execution.

Publications

The number identifying the publication that is affected due to the engineering document execution. (Alphanumeric, 40).

Chapter-Section

The number identifying the chapter-section that is affected due to the engineering document execution (Alphanumeric, 40).

Processing Comments

Textual comments on the association of the maintenance change request to the engineering document. Data entry in this field is mandatory, if MCR # and Rev # are entered.

On updating engineering document effectivity in “Update Eng. Doc. Effectivity” page, the system updates the processing comments. Example.

Note: Document # or Publications or Chapter-Section must be entered, if Ref. Doc Type is selected.

The system displays the following:

Subject

The textual description of the engineering document.

Associated By / Date

The login user id of the employee using the engineering document which is referenced to the MCR / The date on which the engineering document was referenced to the MCR.

 

Addl. Info.

Additional information, if any.

Ref. Type

Indicates whether the engineering document is created with reference to MCR. The system displays one of the following:

  • Primary – This value is displayed if the engineering document is created with reference to MCR.

  • Related – This value is displayed if the engineering document does not have reference to the MCR.

File Name

The name of the file that contains the engineering document details (Alphanumeric, 40).

Help facility available

Revision Comments

Any remarks entered during revision of the engineering document. You must enter the revision comments, on revising the Eng. Doc. #.

Note: Ensure that at least one record is available in the multiline.

To proceed

Note: The system displays an error message, if any concurrent use attempts to modify the details of the Eng. Doc. and MCR details.

You cannot revise an engineering document which is in “Fresh” status.

The system performs the following on updating the reference details:

Process parameter ‘Mandate Revision on addition of reference’

User action

‘MCR’

  • Allowed to add / modify Eng. Doc # / Other details

  • Not allowed to save / modify any MCR details

‘Eng. Doc. #’

  • Allowed to add / modify MCR # / Other details

  • Not Allowed to save / modify any Eng. Doc. details

‘Others’

  • Allowed to add / modify MCR # / Eng. Doc. details

  • Not allowed to save / modify Other details

‘MCR-Eng. Doc’

  • Allowed to add / modify Other details

  • Not Allowed to save / modify any 'MCR / Eng. Doc" details

‘All’

Not Allowed to save / modify any 'MCR / Eng. Doc/ others" details

To proceed further