Precluding work units
This page allows you to preclude work units. Tell me more
Select the “Preclude Work Units” link in the “Select Work Units” page.
The “Preclude Work Units” page appears.
The system displays the following:
Date Format |
The format in which the date fields are displayed, in this page. This format is displayed from the "User Preferences" business component based on the login user ID. In case the format is not defined, the system displays the date format from the "Enterprise Modeling" business component by default. |
The system displays the following fields in the “Work Unit Details” group box:
Aircraft Reg # |
The registration number of the aircraft |
Work Center # |
The code identifying the work center where the work unit is allocated for execution |
Work Unit # |
The work unit which will be precluded against a suitable higher maintenance job, allocated to a visit package |
Work Unit Type |
The type of the work unit, which could be “Task”, “Standard Procedure” or “Work Package” |
Schedule Date |
The date on which the work unit is expected to get executed |
Latest Compliance Date |
The date beyond which the work unit execution cannot be postponed |
Enter the following fields in the “Search Criteria” group box:
Work Unit # |
The number that identifies the work unit of higher maintenance level that is a part of a visit package (Alphanumeric, 40). You can enter the work unit number in full or specify it partially using the “*” character. The system retrieves all the work units that are similar to the value specified here. Leave this field blank to retrieve all the work units of job type "Aircraft", status as "Allocated" and whose transient status is not "Pending Deferrals" or "Precluded". |
Work Unit Type |
Use the drop-down list box to specify the type of the work unit. The system lists the options, “Task”, “standard Procedure” and “Work Package”. The system retrieves all the work units of the type specified here. Leave this field blank to retrieve the work units, irrespective of the type. |
Work Unit Desc |
The textual description of the work unit (Alphanumeric, 150) You can enter the work unit description in full or specify it partially using the “*” character. The system retrieves all the work units whose descriptions are similar to the value specified here. Leave this field blank to search for the work units, irrespective of the description. Zoom facility available |
Visit Package # |
The number identifying the visit package (Alphanumeric, 40). You can enter the visit package number in full or specify it partially using the “*” character. The system retrieves all the visit packages that are similar to the value specified here. Leave this field blank to search for all the visit packages. |
Primary Work Center # |
Use the drop-down list box to select the work center with which the work unit is associated. The system retrieves all the work units associated with the selected work center selected here. Leave this field blank to retrieve all the work units irrespective of the work center. |
Schedule Date Till |
The scheduled date of the work unit (Date Format). The system retrieves all the aircraft work units whose schedule date is earlier or equal to the specified date. |
Execution Unit |
Use the drop-down list box to select the organization unit to which the visit package (in which the higher level maintenance job is listed) is allocated. |
Click the “Search” pushbutton, to search for the work units.
The system displays the following in the “Search Results” multiline:
Visit Package # |
The number identifying the visit package |
Work Unit # |
The work unit retrieved by the system |
Work Unit Desc |
The textual description of the work unit |
Work Unit Type |
The type of the work unit, which could be “Task”, “Standard Procedure” or “Work Package” |
Earliest Compliance Date |
The earliest incidence of the maintenance activity on the specified aircraft |
Schedule Date |
The date on which the work unit is scheduled to be executed |
Latest Compliance Date |
The latest incidence of the maintenance activity on the specified aircraft |
Work Center # |
The code identifying the work center to which the work unit is allocated |
Est. Man Hrs. |
The estimated time required, in man-hours, for the completion of the visit package |
Alert Date |
The date on which the alert message is raised for the execution of the work unit |
Enter the following field:
Comments |
Any additional remarks pertaining to the precluding of the work units (Alphanumeric, 255) |
Note: Ensure that only one work unit is selected for preclusion. Also ensure that the job type of the selected work unit is “Aircraft” and the job status is “Allocated”.
Check the box in the “Select” column of the multiline, to select the work unit, which will be the superseding work unit to the precluded work unit.
Click the “Preclude Work Unit” pushbutton, to preclude the work unit in the header.
The system sets the “Precluded WU Status” of the work unit selected in the multiline as "Superseding" and the “Precluded WU Status” for the work unit in the header as “Precluded”.
To proceed carry out the following
Select a visit package in the multiline, and select the “View Precluded Work Unit Details” link at the bottom of the page, to view the precluded work units of the visit package.
You can preclude a work unit that is superfluous. A work unit becomes superfluous when a work unit of higher level maintenance is allocated to a visit package. The precluded work unit will not be executed.
Specify the filter criteria to search for the superseding work unit.
Click the “Search” pushbutton.
Select only one superseding work unit in the “Search Results” multiline.
Click the “Preclude Work Unit” pushbutton, to preclude the work unit in the header.
The system sets the “Precluded WU Status” of the work unit selected in the multiline as "Superseding" and the “Precluded WU Status” for the work unit in the header as “Precluded”.
Precluding work units – An overview
This page allows you to preclude work units. The execution of certain work units becomes unnecessary due to the execution of a higher-level maintenance activity. For example, a work unit (W01) for the inspection of a component becomes unnecessary, if there is a work unit (W02) in a visit package for the overhaul of the same component. In such situations, to prevent wastage of time, resource and redundancy in maintenance activity, the work unit (W01) is precluded against the work unit (W02). The precluded work unit (W01) will not be performed.
You can preclude a work unit, whose job status is “Pending” and is of job type “Aircraft”. Ensure that the source of the work unit to be precluded is not component forecast.