Select “Define Scale Values” link in the multiline of the “Edit Scale” page.
The “Define Scale Values” page appears.
The system displays the following.
Date Format |
The date format applicable to the login user. |
Organization Structure Unit |
The organization structure unit in which the “Organization Structure” component is deployed. |
Scale Code |
The unique code of the scale. |
Scale Short Description |
A short description of the scale. |
Currency |
The type of currency in which the salary is paid. |
Enter the following in the header.
Increment Type |
From the drop-down list box, select the increment type as “Amount” or “Percentage” to indicate the mode of payment of increments to the salary. |
Rated Frequency |
From the drop-down list box, select the rated frequency. Example, “Monthly”, and “Quarter” |
To define scale values
Enter the following in the multiline.
Lower Limit |
The lower limit of the scale. For example, if the scale is 1000-100-2000, 1000 indicates the lower limit, 100 indicate the increment value, and 2000 indicates the upper limit. |
Increment |
The amount or percentage, by which the salary can be incremented. For example, if the scale is 1000-100-2000, 1000 indicates the lower limit, 100 indicate the increment value, and 2000 indicates the upper limit. |
Upper Limit |
The upper limit of the scale. For example, if the scale is 1000-100-2000, 1000 indicates the lower limit, 100 indicate the increment value, and 2000 indicates the upper limit. |
Mid Point |
A number to indicate the average scale of pay in the industry for this scale. |
Comparison Ratio |
A number to indicate the ratio of the average salary of all the employees within the tier, to the mid point |
Enter the comments below the multiline.
The system displays the following below the multiline.
Applicable To |
The system displays any one of the following organization unit for which the scale values are applicable.
|
Select the “Save” pushbutton to save the details.
To indicate whether a history of the modifications must be maintained
Enter the following.
Modification Option |
Select “Correct” or “Update” from the drop-down list box. § If you select “Correct”, the history of modifications is not stored by the system. The record is merely corrected, and the system treats the modification date of the record to be the same as “Effective Date“ you specified when you created the record § “Update”, the system stores the history of modifications, by inserting a new record to track each change to the record. The previous record is internally closed. When you select “Update”, you must also enter the date from which the changes must become effective. |
New Effective From |
If the edit option you chose is “Update”, specify the date from which the current modification will be in effect. The system maintains the “Effective To Date” of the previous record to be one day less than the “New Effective From” date. |
Select the “Previous” pushbutton beside the “Data Access History” field, to view the previous changes, if any, made to the selected scale.
If no previous record exists, the system will display the current record.
Note: When you click “Previous” pushbutton, the system will display the previous record in the database, provided you had chosen “Update” in the “Edit Option” drop-down list box.
Select the “Next” pushbutton in the “Access Data History” field, to view the next change of the scale values.
Select the “Save” pushbutton to save the details.
6 Hyperlinked text below
Use this page to define scale values.