Select “Define Planning Calendar” from the left pane
The “Define Planning Calendar” page appears.
The system displays the following
Date Format |
The date format that is applicable to the login user. |
Enter the following
Planning Unit |
From the drop-down list box, select the planning unit. |
Planning Calendar Code |
The unique code for planning calendar code. Help Available |
Planning Calendar Description |
The description of the planning calendar. The system displays the description if you selected the planning calendar code using the Help option. |
Status |
From the drop-down list box, select the status of planning calendar as “Open” or “Closed”. |
Calendar Period From |
The start date of the calendar period for the planning in the format “YYYY/MM/DD”. |
Calendar Period To |
The end date of the calendar period for the planning in the format “YYYY/MM/DD”. |
Period Frequency |
From the drop-down list box, select he frequency for generating the period in the multiline. It can be any one of the following
The period frequency decides the generation and distribution of the period in the multiline. |
Select the “Generate Periods” pushbutton to generate the periods in the multiline.
The system displays the following
Period No |
The serial number for the period details. |
Start Date |
The start date of the period. This depends on the period frequency selected. |
End date |
The end date of the period. This depends on the period frequency selected. |
You can edit the following field
Description |
The description of the period. |
Enter the following
Position |
Select the checkbox to define the planning calendar for the position. |
Job |
Select the checkbox to define the planning calendar for the job. |
Grade Set |
Select the checkbox to define the planning calendar for the grade set. Note that if the grade is selected, it is mandatory to select the gradeset as planning dimension. |
Grade |
Select the checkbox to define the planning calendar for the grade. |
Select the “Save” pushbutton to save the planning calendar details.
Select the “Planning Unit” from the drop-down list box.
Enter the “Planning Calendar Code”.
Select the “Get Details” pushbutton. The system retrieves the details of the planning calendar.
You can edit the required details.
Select the “Save” pushbutton.
To delete the planning calendar
Select the “Planning Unit” from the drop-down list box.
Enter the “Planning Calendar Code”.
Select the “Get Details” pushbutton. The system retrieves the details of the planning calendar.
Select the “Delete” pushbutton.
6 Hyperlinked topics below
Use this page to define planning calendar.
To delete the planning calendar