Selecting manpower plan to authorize
Select “Manpower Planning” from the left pane.
The “Select Manpower Plan” page appears.
The system displays the following
Date Format |
The date format that is applicable to the login user. |
Enter the following
Planning Unit |
From the drop-down list box, select the planning unit. |
To select through Search Criteria
In the search criteria group box, specify the search criteria based on which the system will fetch the records.
Enter the following search criteria values, in some or all of the following fields.
Planning Calendar |
From the drop-down list box, select the planning calendar. |
Planning Period |
The values in this field get loaded on selecting the planning calendar. From the drop-down list box, select the planning period. |
Plan Code |
The unique code of the manpower plan. |
Plan Description |
The description of the plan. |
Version No. From |
The lower range of the version number. For example, to view the records from version 1 – 3, enter the value as 1. |
Version No. To |
The upper range of the version number. For example, to view the records from version 1 – 3, enter the value as 3. |
The system displays the following in the “Search Criteria” group box on selecting the “Planning Period”.
Period From |
The start date of the period. |
Period To |
The end date of the period. |
Select the "Search" pushbutton
The system displays the following in the multiline satisfying your search criteria.
Note: The system retrieves only the records of status “Pending for Authorization”.
Planning Calendar |
The planning calendar for the manpower plan. |
Planning Period |
The planning period for the manpower plan. |
Plan Code |
The unique code for the manpower plan. |
Plan Description |
The description of the manpower plan. |
Version No. |
The version number of the manpower plan. |
6 Hyperlinked topics below
Use this page to select manpower plan to authorize.
To select manpower plan to authorize
To select through search criteria