<<
Job Classification
Job Information
part
Job Source
Job Status
Job Type
Joining
Date
Journey Log
Junior Management
Kg / Hour
Kit
Kit Part
Labor Cost
Landing
Cycles
Date
Landing Gear
Last Forecast
Last Generated No
Last In First Out
Last Modified By
Last Modified Date
Last Performed Date
Lead Time
Lead Time Units
Lease Type
Leased
Leased Out
Level Code
License Category
Life
Remaining
Life Parameter
LIFO
copy of ikon
Unified Glossary
Modifying
Limit Control
Limit Type
Line Item Cost
Line Item Value
Listing
FAA-approved
Loan
Loan – Indicates
Loan Agreement
Loan Order
Loan Receipt
Loaned
Location
Ordering
Requesting
Log Book
Lot
Generate Warranty Uncovered Parts Report - A summary of the activity
Unified Glossary
Lot & Serial Controlled
Lot Controlled
Lot No Controlled
Lot No Type Num
Lot Quantity
Lot Quarantined Qty
LRU
Maint Report
Maintenance
Maintenance Base
Maintenance Change Request
type
Maintenance Change Request Class
Maintenance Change Request Document Type
Maintenance Change Request Number
Maintenance Implications
Maintenance Issue Transaction
Maintenance Planning Document
Maintenance Planning Document Tasks
Maintenance Process
Maintenance Program
Maintenance Type
Managerial Job
Manufacture
Manufacturer
NATO Supply Code
Manufacturer Code
Manufacturer Lot
Manufacturer Part Number
Manufacturer Parts
Manufacturer Serial
Manufacturer Sl No
Mapping
Status
Master
Science
Matching
Type
Material
Material Controller
Material Cost
Material Request
Material Specification
Matl Return Authority
Max Remaining Life
Maximum OT Hours/Week
Maximum Reimbursement
Maximum Zone
MCM
MCR Class
MCR Doc Type
MCR Issue Date
MCR Part
MCRs
existing
regarding
Terminating
type
Mean Time Between Failures
Mean Time Between Unscheduled Removals
Measurement
Mechanic
Medium
MEL
MEL Category
MEL item
MEL Quantity
Method
Packaging
Shipping
Microsoft Excel
Middle Management
Min-Max
Minimum Equipment List
Minimum Equipment List Quantity
Minimum Lot
Minimum Order Qty
Minimum Remaining Life
Minimum Shelf Life
Minimum Zone
MIREP
Miscellaneous
Mod Status
MOD Tasks
Model Configuration
Updating
Modification Committee Meeting Number
Modified Part Applicability
Modifying
LIFO
Monthly Reliability Alert
ATA System
Component
Months
Moved Qty
Moving
Average
MPD Tasks
MPDs
MR
MR Class
MR Priority
MR Type
MSG-3
MSN
gives
MTBF
MTBR
MTBUR
terms
Name
Original Equipment Manufacturer
NATO
NATO Supply Code
Manufacturer
NAVAIDS
Navigational Aids
Tactical Air Navigation Channel
Negative Tolerance
Net Quantity
Nettable
New Config
New Revision Type
Newly Overhauled
Next Empty Storage
Next Higher Assembly
changing
NHA
NHA Component
NHA Part
Non-availability
Non-Routine Task
Normal Storage Type
Normal Zone Type
NSCM
NT
NT Close
Number
Basics of using a typical web page
Unified Glossary
APUs
multiline
Packs
Type
Units
Numeric ISO Currency Code
Object
Planning
Object Type
Planning
Observed Faults
Occupation
OEM
OEM-provided
OEM Faults
OEM Name
Off-Wing
Old Config
On-Condition
On-Wing
On Loan
One Time
One Way
Online Help Organization
Only At
Only Confirmed
Open Access Panel Task
Open Periods
Opening Balance
recording
Operating
Frequency
Operational
Operational Date
Operational Implications
Operations Related Savings
Operator
Operator-provided
Opportunity Maintenance
Optional
Order
Engineering
Location
Preference
Order Number
Engineering
Order Quantity
Org
Basics of using a typical web page
Unified Glossary
Invoicing
Requesting
Organization Structure
Organizational Unit
Original Equipment Manufacturers
name
Other Info
OU
OU Description
Ou Instance
Generate Warranty Uncovered Parts Report - A summary of the activity
Generating Warranty Uncovered Parts Report
Out Source
Outgoing
Part
Serial
Overhaul
Overtime Processing
Overtime Rates
Ownership Document
P.R.
P.R.Date
P/N
P/N Change Allowed
Packaging
Code
Condition
Method
Terms
Packs
Number
Parameter Based Charges
Parameter Interval
Parameter Source
Parameter Type
Parent CWO
Parent Work Center
Parent Work Center Description
Part
Generate Warranty Claim Status Report - A summary of the activity
Generate Warranty Uncovered Parts Report - A summary of the activity
Unified Glossary
Job Information
Outgoing
Reliability Fleet
Part Administration
Part Category
Part Classification
Part Condition
Part Control Type
Part Cost
Part Description
Generate Warranty Uncovered Parts Report - A summary of the activity
Generating Warranty Uncovered Parts Report
Unified Glossary
Part Failed Date
Part Identifier
Part Number
Generate Warranty Uncovered Parts Report - A summary of the activity
Generating Warranty Uncovered Parts Report
Unified Glossary
Part Ownership
Part Replacement
Part Serial
Generate Warranty Uncovered Parts Report - A summary of the activity
Unified Glossary
Part Type
Partially Accepted
Partially Amended
Partner
Trading
Pay Term
Pay Term Type
Payment Currency
Payment Priority
PC
PC Maximum Value
PC Minimum Value
PC Type
Pending
Issue Qty
Return Qty
Per Asset Value
Per Cost
Percentage
Period
Holding
Phased Out
Physical Inventory
Physical Inventory Plan Number
PI
PI Plan
Picking
Priority
Strategy
Pilot
PIREP
Placement Priority
Placement Strategy
Plan Demand Qty
Plan Demands
Plan Level
Plan Receipt Qty
Planner Group
Planning
Action
Base
Object
Object Type
Status
Type
Planning Object Types
PO
create
PO Additional Charges
PO Basic Value
PO Covered Qty
PO Currency
PO Line
PO Total Value
PO Type
Poolable
Pooled
Position Code
Position Control ID
Position Type
Positive Tolerance
Post Order Lead Time
PR
PR Type
PR Value
Pre-Closed
Pre Order Lead Time
Precedence CWO
Preference
Order
Preferred Model
Preferred Supplier
Premature Removal Rate
Pressure Altitude
Previous Part
Price Held Firm Time
Price List
Primary Skill
Primary Work Center
Priority
Picking
Problem Demand
Problem Quantity
Process Action
Process Order Lead Time
Productivity Factor
Program Revision
Proximity Indicator
PRR
Purchase
Purchase-related
Purchase Committee
Purchase Lead Time
Purchase Order
Purchase Request
Purchase UOM
>>