<<

QC
QC Clearance Required
Qty Reserved
Qty Reserved By Plan Demands
Qualitative Value
Quality Attribute
Quality Rating
Quantitative Value
Quantity
Quantity / Assembly
Quantity & Value
Quantity Price Break
Quarantined Qty
Quick Codes
Quotation Type



Ramco Enterprise Series
Ramco Enterprise Series web page
Range Parameters
Re-certification
Re-Forecast Impact
Re-Schedule Count
Reason Code
Reason Code Type
Receipt
Receipt Horizon
Receipt Satisfactory
Receipt Tolerance
Receipt Type
Receipt Warehouse
Receipt-Inspection
Received Part
Received Qty
Recertification
Recommended Use
record
Record Page
Recount Mandatory
Recount Qty
Recount Tolerance In
Recount Tolerance In Units
Recurring
Reduced Vertical Space Minima
Ref
Ref Document
Ref Document Currency
Reference Doc Type
Reference EO
Reference Status
refresh
Refurbishment
Reg
Regularize Leave
Regulatory Authority
Reimbursement Limit
Reimbursement Type
Reject Reason
Rejected
Relationship Type
Release Slip
Releasing
    EAN
    EO
Reliability
Reliability Alert
Reliability Calendar Code
Reliability Fleet
    part
Rem Confirmed By
Rem Confirmed Date
Remaining
    EC
    EH
    FC
    FH
    Life
Remedial Action
Removal Type
Remove Quantity
Rental Receipt
Rented Out
Reorder Activity
Reorder Level
Reorder Qty
Repair
Repair Agency
Repair At
Repair Order
Repair Process Code
Repair Shop
Repair/Make Qty
Repeat Fixed Interval
Repeat Floating Interval
Repeat Interval
Repl Confirmed By
Repl Confirmed Date
Replacement
Replacement Type
Replies
    RFQ
Report Action
Report Options”
Reported
    ATA
    Date
    Station
    Time
    Time Zone
Representatives
Request Matrix
Request Status
Requested Part
Requesting
    Location
    Org
Reservation Horizon
Reserve
Reserved Quantity
Resolution Doc
Resolution Procedure
Resolution Type
Resource
Resource Cost
Resource Group
Resource Last Updated
Resource Type
Response Declined
Responsibilities
Retire
Retrieve the record
Retro fitment
Retrofit
Retrofitment
Return Basis
Return Date
Return Qty
    Pending
Return Type
Returnable
Returnable Input
Returnable’
Returned From
Revise Estimate
Revised By
Revised Date
Revising
    EAN
Revision
    Drawing
Revision Date
Rework
RFQ
    replies
RO
Rogue Unit
Rota Plan
Rota Schedule
Rotable
Round Down
Round Off
Round Up
RS
RS Type
RVSM



S
S Class
    Average Stay
S/N Change Allowed
Safety Stock
Sales
Sales UOM
SAT
Save Parameters
    Processing
Saving
    Time Difference
SB
SBs
Sch Interruptions
Schedule Remarks
Schedule Shift on Holidays
Schedule Type
Scheduled Maintenance
SCO
SCO Type
Scrap
Search criteria
search record
Secondary Output
Select
    Edit
    encounter
    hyperlinked
Select box
Select Department
    Edit
Senior Management
Serial Controlled
Serial-controlled
Service Bulletin
Service Desc
Service Quality Rating
Service Rating
Service Type
Shelf Life Expiry
Shelf-life-expired
Shift Deviation
Ship Core By
Ship Spares By
Shipment Tolerance
Shipping
    Contact
    Cost
    Method
    Point
Sign Off Comments
Sign Off Date
Sign-off Status
Simple Average
Since Inspection
Since Last Installation
Since Last Shop Visit
Since New
Since Overhaul
Since Repair
Single Lot
SITA
Skill Code
Skill Rate
Sl No Controlled
Sl No Logic
Sl No Type Num
Slip
    Packing
Source
Source Document
Source File Name
Source Path
Source Type
SP Applicability
Span1
Span1 Moving Average
Span2
SPEC 2000
SPEC 2000 Code
Special Frequency Note
Special Tools Details
Specific Alternates
Specified
    TCD Variant
ST Seq
Staff
Standard Cost
Standard Procedure
Standard Purchase Price
Standard Rates
Standard Sales Package
Standard Sales Price
Standard Warehouse
Standardization
    International Organization
Start-Finish
Start-Start
Started
Static Air Temperature
Station
   Generate Non-Conformities Analysis Report
   Unified Glossary
    Recording
    Reporting
Status
    Mapping
    Planning
Status Attribute
Std
Stock Addition
    Existing
Stock Conversion
Stock Correction
Stock Status
Stock Status From
Stock Status To
Stock Transfer
Stock UOM
Stock Update Mode
Stockable
Stockable item
Storage Category
Storage Proximity
Storage Rule
Storage Type
Stores Department
Strategy
    Picking
Sub Contract Order
Sub Fleet
Sub Fleet Security
Sub Part
Sub Task
Sub-Contracted
Subcontract Receipt
Substitute Qty
Substitute Type
Suggested Action
Sum
    Free Firm Quantity
Summer Time
Supplier
Supplier Account Group
Supplier Number
    Goods Return
Supplier Rating Type
Supplier Response
Supplier Status
Supplier Type
    Goods Return
Supplier Warranty Ref
System Component
System Quantity Display
System Stock Quantity
System Tracking Ref
System-generated



TACAN Channel
Tactical Air Navigation
Tactical Air Navigation Channel
Tag Number
Tag Numbering Type
Tag Type
Take Off Date
task
Task Applicability
Task Classifier
Task Completed Date
Task Execution Status
TAT
Tax, Charge
TCD
TCD Basis
TCD Rate
TCD Variant
Tech Delay
Technical Log
Technical Specifications
Terminating
    MCR
    Value
Terms
    MTBUR
    Packaging
    UOM
Third Party
Three Way
Three-way
Threshold Date
Threshold Interval
Threshold Value
Time
Time Based
Time Deviation
Time Difference
Time Since Inspection
Time Since New
Time Since Repair
Time Unit
Time Zone
To Date
To Repair
To Scrap
To Service
To Supplier
Tolerance Type
toolbar
toolbar icon
Torque Wrench
Total Air Temperature
Total Claim
Total Purchase Lead Time
Trading Participant
Trail Bar
transaction
Transfer Category
Transfer Receipt
Transport
TSI
TSM
TSN
TSO
TSR
TSV
Twin Position Code
Type
    Maintenance Change Request
    Matching
    MCR
    Numbering
    Planning


>>