<<

Main Core
Maint Report
Maintenance
Maintenance Base
Maintenance Change Request Class
Maintenance Change Request Document Type
Maintenance Change Request Number
Maintenance Implications
Maintenance Issue Transaction
Maintenance Planning Document
Maintenance Planning Document Tasks
Maintenance Process
Maintenance Program
Maintenance Type
Make Part
Manufacture
Manufacturer
    NATO Supply Code
Manufacturer ATA
Manufacturer Code
Manufacturer Lot
Manufacturer Part Number
Manufacturer Parts
Manufacturer Serial
Manufacturer Sl No
mapped to another record
Material Controller
Material Cost
Material Request
Material Specification
Material Type
Matl Return Authority
Max Remaining Life
Max.Active Forecasts
Maximum OT Hours/Week
Maximum Reimbursement
Maximum Zone
MCM
MCR Class
MCR Issue Date
MCR Part
MCRs
    existing
    regarding
    Terminating
    type
Mean Time Between Failures
Mean Time Between Unscheduled Removals
Measurement
MEL
MEL Category
MEL item
MEL Quantity
Middle Management
Min-Max
Minimum Equipment List
Minimum Equipment List Quantity
Minimum Lot
Minimum Order Qty
Minimum Remaining Life
Minimum Shelf Life
Minimum Zone
MIREP
Miscellaneous
Mod Status
MOD Tasks
Model Configuration
    Updating
Modification Committee Meeting Number
Modified Part Applicability
Monthly Reliability Alert
    ATA System
    Component
Moved Qty
Moving
    Average
MPD Tasks
MPDs
MR
MR Class
MR Priority
MR Type
MTBF
MTBR
multiline
   Basics of using a typical web page
   Unified Glossary
    Adding
    Deleting
    end
    existing
    number
    set
multiline item
    delete



NATO
NATO Supply Code
NAVAIDS
Navigational Aids
    Tactical Air Navigation Channel
Negative Tolerance
Net Quantity
Nettable
New
New Config
New Revision Type
Newly Overhauled
Next Empty Storage
Next Higher Assembly
    changing
Next Higher Assembly Part Number
Next Higher Assembly Serial Number
next record
NHA
    number
NHA Component
NHA Part
NHA Serial
Night Vision Goggles Events
Non Issuable Input
Non-availability
Non-Routine Task
None
Normal Storage Type
Normal Zone Type
Not Applicable
NSCM
NT
Number
    APUs
    NHA
    Packs
    Type
    Units
Numeric
Numeric ISO Currency Code
NVG Events



Object
    Planning
Object Type
    Planning
Observed Faults
Occupation
Occurrence Occurred During
Occurrence Report
Occurrence Type
OEM
OEM Faults
OEM Name
OEM-provided
Off-Wing
Old Config
On-Wing
One Time
Online
Online Help
   Using Online Help
   Basics of using a typical web page
Open Access Panel Task
Open Periods
Opening
   Basics of using a typical web page
   Unified Glossary
    Balance
    Web
Operating
    Frequency
Operational Date
Operational Implications
Operational Location
Operations Related Savings
Operations Type
Operator-provided
Opportunity Maintenance
Optional
Order Quantity
Org
Organization Structure
Organizational Unit
Original Equipment Manufacturers
OU Description
Out Source
Oven
Overall Rating
Overhaul
Overtime Processing
Overtime Rates
Ownership Document



Packaging
    Code
    Condition
    Method
    Terms
Packs
    Number
    Slip
page
    ILBO
page-two pages open simultaneously
Parameter
    Triggering
Parameter Based Charges
Parameter Interval
Parameter Source
Parameter Type
Parent CWO
Parent Delivery Area Code
Parent Work Center
Parent Work Center Description
Part
    aircraft/component
    Job Information
    Outgoing
    Reliability Fleet
Part Account Group
Part Category
Part Classification
Part Condition
Part Control Type
Part Cost
Part Description
Part Failed Date
Part Identifier
Part Number
Part Ownership
Part Rating
Part Serial
Part Type
Partially Accepted
Partner
    Trading
Parts Expense Basis
Pass
Pax
Pay Term
Pay Term Type
Payment Currency
Payment Priority
PBH
PBH Agreement
PBH Exchange
PBH On
PC
PC Maximum Value
PC Minimum Value
PC Type
Pending
    Issue Qty
    Return Qty
Per Asset Value
Per Cost
Percentage
Percentage Completed
Performing
    EO
Period
    Holding
Personnel Related
Physical Inventory
Physical Inventory Plan Number
PI Plan
Picking
    Priority
    Strategy
Piece Part
Pilot
Pilot Activity
PIREP
Placement Priority
Placement Strategy
Plan Demand Qty
Plan Demands
Plan Level
Plan Receipt Qty
Planner Group
Planning
    Action
    Base
    Object
    Object Type
    Status
    Type
Planning Object Types
Plumbing Services
PO Additional Charges
PO Basic Value
PO Covered Qty
PO Currency
PO Line
PO Total Value
PO Type
Poolable
Position Code
Position Control ID
Position Formula
Position Type
Positive Tolerance
Post Order Lead Time
Power By Hour Agreement
PR
PR Type
PR Value
Pre Order Lead Time
Precedence CWO
Preference
    Order
Preferred Model
Preferred Supplier
Premature Removal Rate
Pressure Altitude
Previous Part
Previous Record
Price Held Firm Time
Price Rating
Primary Output
Primary Skill
Primary Work Center
Prime Part Number
Principal Part
Problem Demand
Problem Quantity
Process Action
Process Order Lead Time
Productivity Factor
Program Category
Program Revision
Proximity Indicator
PRR
Purchase
Purchase Committee
Purchase Lead Time
Purchase Order
Purchase Request
Purchase UOM
Purchase-related
pushbutton


>>