Associating checklists

Quality Audit - An Overview

Prerequisites

Unified Glossary

Basics of using a typical web page

Using online help

The "Associate Checklist" page appears.

The system displays the following fields:

Audit Report #

The identification number of the audit report.

The system displays the following in the “Audit Report Details” group box.

Audit Description

The name / description of the audit.

Audit Schedule

The identification number of the audit schedule.

Report Type

The report type of the quality audit: “Scheduled” or “Adhoc”.

Audit Entity

The entity that is audited, such as Supplier #, Customer # and Employee #.

Audit Status

The status of the audit report

Audit Type

The type of the audit report, such as Supplier, Employee, Station, Work Center, Warehouse and Others.

Entity Name

The name / description of the entity.

Operator Code

The operator code of the maintenance operator.

Checklist Seq #

The sequence in which the checklist must appear in the audit schedule.

Ensure the following:

• The number entered in this field is a positive integer.

• The number entered in this field is a unique checklist sequence number.

Checklist #

A unique code identifying the checklist used for auditing. Mandatory.

Ensure that the number entered in this field is a valid checklist number in “Active” status.

Help facility available

Note: The system displays an error message, if any concurrent user tries to modify the details of the Audit Report to Checklist mapping in the multiline.

The system displays the following fields in the “Maintain Audit Checklist” multiline:

Checklist Description

A textual description of the checklist.

Approval Ref.

The approval reference number.

Approval Rev #

The code identifying the revision.

Approved By

The code identifying the employee by whom the checklist was approved.

Approved Date

The date on which the checklist was approved.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Prerequisite

1. “Audit Report #” must exist against which the checklist  is to be mapped

2. Audit Status must be “Fresh”

3. The value specified in the “Checklist Based?” field must be “Yes”.