Modifying cost center structure details

Glossary

Basics of using Ramco Enterprise Series web page

This page allows you to modify the details of a cost center structure. Tell me more.

The “Edit Cost Center Structure” page appears.

The system displays the following:

Cost Center Structure ID

The code identifying the cost center structure.

Status

The status of the cost center structure. It must be “Active”.

Description

A textual description of the cost center structure (Alphanumeric, 40). Mandatory.

Structure Type

Use the drop-down list box to select the type of cost center structure. You can select from “Default” or “Alternate”.

  • Default  -  indicates that it is the only default structure for the date range.

  • Alternate - indicates that multiple structures other than the default structure could be available for a date range.

Effective Date

Use the drop-down list box to select the date from which the cost center structure is to be effective. All the start dates of the MAC periods that have been defined for MAC years that are in the “Open” status will be available for selection in the chronological order.

Note: The date selected in this field must be the same or after the date selected in the “Expiry Date” field.

Expiry Date

Use the drop-down list box to select the date till which the cost center structure is effective. All the end dates of the MAC periods that have been defined for MAC years that are in the “Open” status will be available for selection in the chronological order.

Type

Use the drop-down list box to select whether you want to retrieve a “Group” or a “Detail” cost center. The system displays “Group” by default on launch of the page.

Cost Center From

The starting code in the range of cost center codes that you want to retrieve (Alphanumeric, 10).

Note: The code entered in this field must be before or the same as the code entered in the “To” field.

To

The ending code in the range of cost center codes till which you want to retrieve (Alphanumeric, 10).

The system retrieves and displays the following in the “Cost Center Details” multiline based on the search criteria entered:

Note: Note: The system retrieves all the “active” detail level cost centers / units  as well as analysis codes for which “Reporting Cost Center” is set to “Yes” in the “Create Analysis Code” activity of “Account Based Budget”  business component.

Ensure that the effective and expiry date of the cost center code and the analysis code falls within the effective and expiry date of the cost center structure to which they are attached. Example 1 .

Cost Center / Unit

The code identifying the cost center / unit.

Description

The description of the cost center / unit.

Effective Date

The date from which the cost center / unit is effective.

Expiry Date

The date on which the effectiveness of the cost center / unit expires.

Note: The effective date or the expiry date of the selected cost centers / units must at least partly be within the effective date and the expiry date of the cost center structure. Refer Example 2..

Map To

Use the drop-down list box to select the group cost center to which the cost center must be mapped. All the group cost centers that are available in the structure will be available for selection. The system displays “Blank” by default on launch of the page.

Note: The cost centers available in a cost center structure must be unique.

The system maps the selected cost centers available in the multiline to the selected cost center available in the “Map” field. The system also displays the details of the cost center and the mapping in the “Structure Details” multiline.

The system displays the following in the “Structure Details” multiline:

Level

The number identifying the hierarchy level in which the cost center / unit is available in the structure.

Cost Center / Unit

The code identifying the cost center / unit.

Description

The description of the cost center / unit.

Parent Cost Center / Unit

The code identifying the parent cost center / unit to which cost center has been mapped.

Note: “Blank” would be displayed in this field if the cost center does not have a parent cost center / unit.

Description

The description of the parent cost center / unit.

Note: You cannot mark all the cost centers that are available in the structure for deletion.

All the cost centers that are mapped below the selected cost center would also be deleted.

The system removes the selected cost center and all the cost centers mapped below it from the cost center structure.

The system saves the modifications made to the cost center structure. The system updates the login ID of the user and the system date in the “Last Modified By” and “Last Modified Date” fields.

The system displays the following:

Created By

The login ID of the user who created the cost center structure.

Created Date

The date on which the cost center structure was created.

Last Modified By

The login ID of the user who last modified the cost center structure.

Last Modified Date

The date on which the cost center structure was last modified.

To proceed, carry out the following

 

 

 

 

 

 

 

 

 

 

 

 

Modifying cost center structure details – An overview

Activity overview

You can modify the details of a cost center structure that is in the “Active” status. You can include new cost centers in the structure at various levels. A cost center must be unique for the structure. This page allows you to carry out a search to retrieve cost centers that have to be included to the cost center structure.

This page also allows you to delete any level in the structure. The system deletes all the cost centers that fall below the selected level. However, you cannot delete all the cost centers at the top most level of the hierarchy. If you want to delete all the cost centers in the structure, you must include new cost centers and then subsequently delete the old ones. The system saves the modifications made to the cost center structure. The system also stores the login ID of the user and the system date along with the modified cost center details.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Example 1:

Cost Centers CC1, CC2 and CC3 are to be mapped to a group GCC1. The following could be the dates during which a cost center structure and the various cost centers are effective.

Cost Center

Type

Effective Date

Expiry Date

GCC1

Structure Name

10th April ’2002

1st March 2003

CC1

Child Cost Center

1st April 2002

31st July 2002

CC2

Child Cost Center

01st August 2002

31st December 2002

CC3

Child Cost Center

01st January 2003

31st December 2003