Modifying deferment request details of a work unit

Unified Glossary

Basics of using a typical web page

Using Online Help

This page allows you to modify the deferment details of a work unit.  Tell me more

The “Edit Deferment Request Details” page appears.

The system displays the following in the “Deferment Request Details” group box:

Deferment Request #

The number identifying the deferment request for which the details are to be modified.

Aircraft Reg #

The registration number of the aircraft.

Part #

The part number of the component on which the maintenance activity is performed.

Serial #

The serial number of the component on which the maintenance activity is performed.

Visit Package #

The number identifying the visit package for which the deferment request must be modified.

Revision #

The latest revision number of the visit package. The system leaves the field blank if the visit package has not been revised.

Work Center #

The work center where the visit package is to be executed.

Job Type

The type of the maintenance activity such as "Aircraft", "Component Removal", "On Wing" etc.

The system displays the following in the “Work Unit Details” multiline:

Line #

The unique number generated by the system, to identify the row in the multiline.

Work Unit #

The work unit for which deferment is requested.

Work Unit Type

The type of the work unit, which could be “Task”, “Std. Procedure” or “Work Package”.

Maintenance Type

The type of the maintenance work, such as overhaul, repair and inspection, to be performed on an aircraft.

Schedule Date

The deferral date of the task

Reason Category

Use the drop-down list box to modify the reason category for deferment of the work unit. The system lists all valid reason categories in the “Active” status as defined in the “Create Deferral Reason Category” activity of the “Central Planning” business component.

Limit Type

Use the drop-down list box to modify the type of deferment of the work unit. The system provides the options, “Time Based”, “Usage Based”, “Time & Usage Based” and “Indefinite Deferral”. The system displays “Time Based” by default.

Note: The option “Indefinite Deferral” is displayed, only if the system parameter “Indefinite Deferral” is set to “Allowed” in the “Set Options” activity of the current business component.

Requestor Comments

Any additional remarks pertaining to deferment by the user who creates the deferment request (Alphanumeric, 255).

Regulatory Authority

Use the drop-down list box to modify the regulatory authority that defines the scheduled dates, compliance dates and compliance values for maintenance activities. The system lists all the valid regulatory authorities that are defined in the “Create Regulatory Authority Codes” activity of the “Common Master” business component.

Approval #

The number that identifies the user who approves the deferment of the work unit (Alphanumeric, 15).

Approval Date

The date on which the deferment request is approved (Date Format).

Note: The approval date is displayed, either in GMT or local time, based on the options set in the “Time Zone” systems parameter.

The system displays the following field:

Work Unit Desc

The description of the work unit.

The system displays the following in the “Employee Details” group box:

Employee #

The employee code of the login user.

Requestor Name

The name of the login user.

Email

The email ID of the requestor.

Work Phone #

The telephone number of the requestor’s work place.

Note: The system will not retrieve work units of Job Type ‘Component Removal’

Modifying the deferment request

The system carries out the following:

Note: If the system parameters “Deferment Request Authorization For Aircraft Work units” is set as “Not Required”, the system updates the transient status of the parent work unit as well as its constituent work unit to “Deferred” and the job status as “Cancelled”. The system also updates the maintenance program of the parent work unit with the execution status as “Deferred” and also the corresponding deferment request details.

The system does not allow creation of deferment request for work units of Job Type ‘Component Removal’.

Confirming request for deferment

The system carries out the following:

a) Changes the transient status of the work units to “Deferred” and the deferment request status to “Approved”.

b) Updates the aircraft/component work units to the “Allocate Work Units” and “Perform Opportunity Maintenance” activities of the “Central Planning” business component.

c) For the aircraft/component work units, the system updates the following in the corresponding aircraft .

Cancel the deferment request

The system changes the status of the deferment request to “Cancelled”. The system stores the name of the login user and the current server date as the last modified date.

To edit deferral limits

Top

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

What you can do in this page

Modify the deferral type of the deferment request

Modify the reason category for the deferment request

 

Top

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Modify the deferral type of the deferment request

You can change the deferral type of the deferment request. Based on the option specified here, you can define the deferral limits for the work unit.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Modify the reason category for the deferment request

You can change the reason category of the deferment request using the reason categories defined in the “Create Deferral Reason Category “ activity of the “Central Planning” business component.

Top

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Prerequisites

Top

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Modifying deferment request details of a work unit – An overview

This page allows you to modify the deferment details of a work unit. You can modify the approval details such as the regulatory authority for approving the deferment, the approval number and date. You can also modify the deferral type, reason category for deferment and the requestor comments for deferring the work unit.

Using this page, you can also cancel or confirm the deferment request. You can confirm, modify or cancel deferment requests, which are in “Fresh” status.

Top