Maintain Estimation

Unified Glossary

Basics of using Ramco Enterprise series webpage

Using online help

The “Maintain Estimation” page appears.

Organization Unit

From the drop-down list box, select the required option. The combo is defaulted with the login OU.

Estimation Stage

From the drop-down list box, select the required option. The combo is loaded with the values “Proposal” and “Project” for you to choose. The system displays “Select” by default on launch of the page.

Numbering Type

From the drop-down list box, select the required numbering type. Based on the selected numbering type, the estimation number gets generated, on clicking “Save” pushbutton.

Note: If the Numbering Type is manual then in such case the user has to enter the Estimation Number.   

Status

The status of the estimation. The status could be of the following types:

·         Fresh – On clicking “Save” pushbutton in the tabs

·         Draft – On clicking “Save” pushbutton

·         (Pending for Authorization – Create)  – On clicking “Submit” pushbutton

·         (Pending for Authorization – Amend) – On clicking “Amend” pushbutton

·         Authorized – On clicking “Authorize” pushbutton

·         Deleted – On clicking “Delete” pushbutton

·         Rejected – On clicking “Reject” pushbutton

Proposal ID

Enter a valid proposal id. This field is defaulted with the proposal id if traversed from the Proposal main screen.

Note:

·         If the Estimation Stage of the latest version number linked to the proposal is “Proposal” then the Estimation Details section is loaded where the “Cost Rate Card ID” and “Revenue Rate Card ID” are displayed from the Proposal screen.

·         If the Estimation Stage of the latest version number linked to the proposal is “Project” then the Estimation Details section is loaded where the “Cost Rate Card ID” and “Revenue Rate Card ID” are editable.

Help facility available

Project ID

Enter a valid project id.

Help facility available

Estimation Number

Enter a unique estimation number. Mandatory.

Help facility available

Estimation Version No.

On entering the estimation number, the estimation version number is defaulted with the value “1”. Mandatory.

Note: The version number is updated on clicking “Amend” pushbutton.

Help facility available

Version Effective From Date

Enter the version effective from date. It is a mandatory field when either clicking on “Save” or “Amend” pushbutton. Mandatory.

Note: The Version Effective From Date should not be prior to the Proposal Date or Project Effective From Date.

The following field details are displayed under “Estimation Details” section:

Proposal Description

On entering the Proposal ID, the description for proposal is defaulted in this field.

Project Name

On entering the Project ID, the name of the project is defaulted in this field.

Billing Rule

The Billing Rule is fetched and displayed from the billing rule of the project concerned.

Note: Based on the Billing Rule, the relevant grids will load in the “Employee Cost” and “Revenue Estimate” tab.

Proposal Currency

The proposal currency is fetched from the ‘Maintain Proposal’ screen based on the Proposal ID entered from the currency details saved under the ‘Rate Card Details’ section of the “Maintain Proposal” screen.

Project Currency

The project currency is fetched from the PO mapped to the project and displayed.

Contingency % on total cost

Enter the contingency percentage on total cost.

Note: This field is editable irrespective of the estimation stage.

Cost Rate Card ID

The cost rate card id is fetched from the ‘Maintain Proposal’ screen (if it is defined in the Proposal screen). The cost rate card can be mapped here if it is a Project Based estimation.

Help facility available

Revenue Rate Card ID

The Revenue rate card id is fetched from the ‘Maintain Proposal’ screen (if it is defined in the Proposal screen). The revenue rate card can be mapped here if it is a Project Based Estimation.

Help facility available

The “Maintain Estimation” page consists of the following tabs:

Tab – Employee Cost

Estimation Basis

From the drop-down list box, select the required option. The combo is loaded with the values “Employee” and “Grade”. The system displays “Select” by default on launch of the page.

·         Employee – This allows estimating the Milestone based manpower cost – employee wise

·         Grade – This allows estimating the Milestone based manpower cost – Grade wise

Milestone ID

Enter a relevant milestone id. Mandatory.

Milestone Description

Enter a description for the entered milestone id. Mandatory.

Estimated End Date

Enter the estimated end date for all the milestones. Mandatory.

Manpower Cost

The manpower cost for each milestone defined is calculated based on the effort entered grade wise or employee wise. The manpower cost is either the total of grade wise cost or employee wise cost as defined in the multiline. The value is displayed after the estimated effort for the milestones are entered in the relevant popups.

Estimated Effort

Enter the estimated effort for the milestone.

Total Manpower Cost

The summation of manpower cost of all the milestone ID’s in the grid is calculated and displayed.

Role

From the drop-down list box, select the required role. The combo is loaded with various values (defined in quick codes) for you to choose. The system displays “Select” by default on launch of the page.

Site

From the drop-down list box, select the required site. The combo is loaded with the values “Offshore”, “Onsite” and “Onshore” for you to choose. The system displays “Select” by default on launch of the page.

Efforts

Enter the estimated effort for combination of role and site. Mandatory.

Rate

The rate value is displayed based on the cost rate card.

UOM

The UOM is displayed based on the cost rate card.

Total Value

The total value is calculated based on the following:

Total Value = Rate * Effort

Total Efforts

The summation of efforts of all the roles.

Employee Code

Enter a relevant employee code.

Help facility available

Site

From the drop-down list box, select the required site. The combo is loaded with the values “Offshore”, “Onsite” and “Onshore” for you to choose. The system displays “Select” by default on launch of the page.

Efforts

Enter the estimated effort for combination of resource and site. Mandatory.

Rate

The rate value is displayed based on the cost rate card.

UOM

The UOM is displayed based on the cost rate card.

Total Value

The total value is calculated based on the following:

Total Value = Rate * Effort

Total Efforts

The summation of efforts of all the resources.

Estimation Basis

This field is defaulted with the option “Grade”. That is, estimation of the manpower cost can be done grade-wise.

Transaction/Process Unit

From the drop-down list box, select the required option. The combo is loaded with the various options for you to choose. These are user defined values defined in quick codes.

Site

From the drop-down list box, select the required site. The combo is loaded with the values “Offshore”, “Onsite” and “Onshore” for you to choose. The system displays “Select” by default on launch of the page.

Count

Enter a relevant count in this field. Mandatory.

Rate/Count

The rate value is displayed based on Cost rate card.

Production Cost

The production cost is calculated and displayed in this field.

Production Cost = Rate * Count

Manpower Cost

The manpower cost for each transaction is calculated based on the effort entered grade wise or employee wise. The man power is either the total of grade wise or employee wise cost.

Total Value

The summation of production and manpower cost.

Estimated Effort

Enter the estimated effort for the combination of grade and site.

Total Production Cost

The summation of production cost of all the transaction/process.

Total Count

The summation of counts of all the transaction/process.

Total Manpower Cost

The summation of manpower cost of all the transaction/process.

Total Value

The summation of total values of all the transactions.

Tab – Travel Expenses

Grade

Enter the relevant grade.

Grade Set

The grade set is displayed on entering the grade.

To Location

From the drop-down list box, select the required location. The combo is loaded with various locations for you to choose. The values in the combo are defined in quick codes. The system displays “Select” by default on launch of the page.

Travel Remarks

Enter the relevant travel remarks.

Travel Type

Enter the relevant travel type.

Estimated No of Days

Enter the estimated number of days.

Perdiem

Enter the total perdiem expenses in this field.

Conveyance

Enter the conveyance expenses in this field.

Airfare

Enter the airfare expenses in this field.

Visa

Enter the visa expenses in this field.

Total Cost

The total cost is the summation of Perdiem, Conveyance, Airfare and Visa.

Travel Total Cost

The travel total cost is the summation of total cost in the ‘Travel Expenses’ multiline.

Tab – Other Expenses

Cost Head

From the drop-down list box, select the required option. The combo is loaded with various options (defined in quick codes) for you to choose. 

Cost

Enter the cost for every cost head, if any.

Upcharge Cost

Enter the upcharge cost, if any.

Ammortisation Cost

Enter the ammortisation cost, if any.

Total Cost

The total cost is the summation of Cost, Upcharge Cost and Ammortisation Cost in the ‘Other Expenses’ multiline.

Other Cost – Total

The summation of Total Cost in the ‘Other Expenses’ multiline.

Tab - Assumptions

The “Assumptions” tab captures the assumptions based on which the estimation is made.

Assumption ID

Enter a unique assumption id.

Assumption Category

From the drop-down list box, select the required assumption category based on the entered assumption id.

Assumption Description

Enter the description for the entered assumption id.

Tab – Revenue Estimate

Milestone ID

Enter a relevant milestone id. Mandatory.

Milestone Description

Enter a description for the entered milestone id. Mandatory.

Estimated End Date

Enter the estimated end date for all the milestones. Mandatory.

Revenue Amount

Enter the revenue amount for all the milestones.

Total Revenue Amount

The summation of revenue amount of all the milestones defined.

Role

From the drop-down list box, select the required role. The combo is loaded with various values (defined in quick codes) for you to choose. The system displays “Select” by default on launch of the page.

Site

From the drop-down list box, select the required site. The combo is loaded with the values “Offshore”, “Onsite” and “Onshore” for you to choose. The system displays “Select” by default on launch of the page.

Efforts

Enter the estimated effort for combination of role and site. Mandatory.

Rate

The rate value is displayed based on the cost rate card.

UOM

The UOM is displayed based on the revenue rate card.

Total Value

The total value is calculated based on the following:

Total Value = Rate per Hour * Effort

Total Efforts

The summation of efforts of all the roles.

Employee Code

Enter a relevant employee code.

Help facility available

Site

From the drop-down list box, select the required site. The combo is loaded with the values “Offshore”, “Onsite” and “Onshore” for you to choose. The system displays “Select” by default on launch of the page.

Efforts

Enter the estimated effort for combination of resource and site. Mandatory.

Rate

The rate value is displayed based on the revenue rate card.

UOM

The UOM is displayed based on the revenue rate card.

Total Value

The total value is calculated based on the following:

Total Value = Rate per Hour * Effort

Total Efforts

The summation of efforts of all the resources.

Transaction/Process Unit

From the drop-down list box, select the required option. The combo is loaded with various options for you to choose. These are user defined values defined in quick codes.

Site

From the drop-down list box, select the required site. The combo is loaded with the values “Offshore”, “Onsite” and “Onshore” for you to choose. The system displays “Select” by default on launch of the page.

Count

Enter a relevant count in this field. Mandatory.

Rate/Count

The rate value is displayed based on the cost rate card.

Production Cost

The production cost is calculated and displayed in this field.

Production Cost = Rate * Count

Manpower Cost

The manpower cost for each transaction is calculated based on the effort entered grade wise or employee wise. The man power is either the total of grade wise or employee wise cost.

Value

The summation of production and manpower cost.

Total Value

The summation of total values of all the transactions.

Revenue Estimate

The revenue estimate is calculated and displayed in this field.

Man Power Cost

The man power cost is calculated based on the cost rate card value entered in the screen.

Travel Expenses

The travel expenses are calculated and displayed in this field.

Other Expenses

The other expenses are calculated and displayed in this field.

Contingency Cost

The contingency cost (the total of all the cost) is calculated and displayed in this field. Based on this the “Gross Margin” and “Gross Margin” (%) will be computed and displayed. The contingency cost is calculated using the formula (Actual Cost * Contingency %).

Gross Margin (Amount)

The Gross Margin is arrived by subtracting the total cost from total revenue.

Gross Margin = Revenue – Cost.

Note: The Gross Margin amount can also be a negative value.

Gross Margin (%)

The Gross Margin percentage is calculated using the formula (Revenue – Cost/Cost).

Note: The Gross Margin percentage can also be a negative value.

Note: On clicking “Submit” the status will be changed to “Submitted”.

Note: On clicking “Authorize” the status will be changed to “Authorized”.

Note:

On clicking “Amend” the status will be changed to “In Amendment” and on submit, the status will be changed to “Pending for Authorization – Amend”.

Estimation is amended only when it is in the authorized status. The changes will be stored and accommodated.