Maintain Estimation
The “Maintain Estimation” page appears.
Organization Unit |
From the drop-down list box, select the required option. The combo is defaulted with the login OU. |
Estimation Stage |
From the drop-down list box, select the required option. The combo is loaded with the values “Proposal” and “Project” for you to choose. The system displays “Select” by default on launch of the page. |
Numbering Type |
From the drop-down list box, select the required numbering type. Based on the selected numbering type, the estimation number gets generated, on clicking “Save” pushbutton. Note: If the Numbering Type is manual then in such case the user has to enter the Estimation Number. |
Status |
The status of the estimation. The status could be of the following types: · Fresh – On clicking “Save” pushbutton in the tabs · Draft – On clicking “Save” pushbutton · (Pending for Authorization – Create) – On clicking “Submit” pushbutton · (Pending for Authorization – Amend) – On clicking “Amend” pushbutton · Authorized – On clicking “Authorize” pushbutton · Deleted – On clicking “Delete” pushbutton · Rejected – On clicking “Reject” pushbutton |
Proposal ID |
Enter a valid proposal id. This field is defaulted with the proposal id if traversed from the Proposal main screen. Note: · If the Estimation Stage of the latest version number linked to the proposal is “Proposal” then the Estimation Details section is loaded where the “Cost Rate Card ID” and “Revenue Rate Card ID” are displayed from the Proposal screen. · If the Estimation Stage of the latest version number linked to the proposal is “Project” then the Estimation Details section is loaded where the “Cost Rate Card ID” and “Revenue Rate Card ID” are editable. Help facility available |
Project ID |
Enter a valid project id. Help facility available |
Estimation Number |
Enter a unique estimation number. Mandatory. Help facility available |
Estimation Version No. |
On entering the estimation number, the estimation version number is defaulted with the value “1”. Mandatory. Note: The version number is updated on clicking “Amend” pushbutton. Help facility available |
Version Effective From Date |
Enter the version effective from date. It is a mandatory field when either clicking on “Save” or “Amend” pushbutton. Mandatory. Note: The Version Effective From Date should not be prior to the Proposal Date or Project Effective From Date. |
The following field details are displayed under “Estimation Details” section:
Proposal Description |
On entering the Proposal ID, the description for proposal is defaulted in this field. |
Project Name |
On entering the Project ID, the name of the project is defaulted in this field. |
Billing Rule |
The Billing Rule is fetched and displayed from the billing rule of the project concerned. Note: Based on the Billing Rule, the relevant grids will load in the “Employee Cost” and “Revenue Estimate” tab. |
Proposal Currency |
The proposal currency is fetched from the ‘Maintain Proposal’ screen based on the Proposal ID entered from the currency details saved under the ‘Rate Card Details’ section of the “Maintain Proposal” screen. |
Project Currency |
The project currency is fetched from the PO mapped to the project and displayed. |
Contingency % on total cost |
Enter the contingency percentage on total cost. Note: This field is editable irrespective of the estimation stage. |
Cost Rate Card ID |
The cost rate card id is fetched from the ‘Maintain Proposal’ screen (if it is defined in the Proposal screen). The cost rate card can be mapped here if it is a Project Based estimation. Help facility available |
Revenue Rate Card ID |
The Revenue rate card id is fetched from the ‘Maintain Proposal’ screen (if it is defined in the Proposal screen). The revenue rate card can be mapped here if it is a Project Based Estimation. Help facility available |
The “Maintain Estimation” page consists of the following tabs:
Estimation Basis |
From the drop-down list box, select the required option. The combo is loaded with the values “Employee” and “Grade”. The system displays “Select” by default on launch of the page. · Employee – This allows estimating the Milestone based manpower cost – employee wise · Grade – This allows estimating the Milestone based manpower cost – Grade wise |
Milestone ID |
Enter a relevant milestone id. Mandatory. |
Milestone Description |
Enter a description for the entered milestone id. Mandatory. |
Estimated End Date |
Enter the estimated end date for all the milestones. Mandatory. |
Manpower Cost |
The manpower cost for each milestone defined is calculated based on the effort entered grade wise or employee wise. The manpower cost is either the total of grade wise cost or employee wise cost as defined in the multiline. The value is displayed after the estimated effort for the milestones are entered in the relevant popups. |
Estimated Effort |
Enter the estimated effort for the milestone. |
Total Manpower Cost |
The summation of manpower cost of all the milestone ID’s in the grid is calculated and displayed. |
Role |
From the drop-down list box, select the required role. The combo is loaded with various values (defined in quick codes) for you to choose. The system displays “Select” by default on launch of the page. |
Site |
From the drop-down list box, select the required site. The combo is loaded with the values “Offshore”, “Onsite” and “Onshore” for you to choose. The system displays “Select” by default on launch of the page. |
Efforts |
Enter the estimated effort for combination of role and site. Mandatory. |
Rate |
The rate value is displayed based on the cost rate card. |
UOM |
The UOM is displayed based on the cost rate card. |
Total Value |
The total value is calculated based on the following: Total Value = Rate * Effort |
Total Efforts |
The summation of efforts of all the roles. |
Employee Code |
Enter a relevant employee code. Help facility available |
Site |
From the drop-down list box, select the required site. The combo is loaded with the values “Offshore”, “Onsite” and “Onshore” for you to choose. The system displays “Select” by default on launch of the page. |
Efforts |
Enter the estimated effort for combination of resource and site. Mandatory. |
Rate |
The rate value is displayed based on the cost rate card. |
UOM |
The UOM is displayed based on the cost rate card. |
Total Value |
The total value is calculated based on the following: Total Value = Rate * Effort |
Total Efforts |
The summation of efforts of all the resources. |
Estimation Basis |
This field is defaulted with the option “Grade”. That is, estimation of the manpower cost can be done grade-wise. |
Transaction/Process Unit |
From the drop-down list box, select the required option. The combo is loaded with the various options for you to choose. These are user defined values defined in quick codes. |
Site |
From the drop-down list box, select the required site. The combo is loaded with the values “Offshore”, “Onsite” and “Onshore” for you to choose. The system displays “Select” by default on launch of the page. |
Count |
Enter a relevant count in this field. Mandatory. |
Rate/Count |
The rate value is displayed based on Cost rate card. |
Production Cost |
The production cost is calculated and displayed in this field. Production Cost = Rate * Count |
Manpower Cost |
The manpower cost for each transaction is calculated based on the effort entered grade wise or employee wise. The man power is either the total of grade wise or employee wise cost. |
Total Value |
The summation of production and manpower cost. |
Estimated Effort |
Enter the estimated effort for the combination of grade and site. |
Total Production Cost |
The summation of production cost of all the transaction/process. |
Total Count |
The summation of counts of all the transaction/process. |
Total Manpower Cost |
The summation of manpower cost of all the transaction/process. |
Total Value |
The summation of total values of all the transactions. |
Grade |
Enter the relevant grade. |
Grade Set |
The grade set is displayed on entering the grade. |
To Location |
From the drop-down list box, select the required location. The combo is loaded with various locations for you to choose. The values in the combo are defined in quick codes. The system displays “Select” by default on launch of the page. |
Travel Remarks |
Enter the relevant travel remarks. |
Travel Type |
Enter the relevant travel type. |
Estimated No of Days |
Enter the estimated number of days. |
Perdiem |
Enter the total perdiem expenses in this field. |
Conveyance |
Enter the conveyance expenses in this field. |
Airfare |
Enter the airfare expenses in this field. |
Visa |
Enter the visa expenses in this field. |
Total Cost |
The total cost is the summation of Perdiem, Conveyance, Airfare and Visa. |
Travel Total Cost |
The travel total cost is the summation of total cost in the ‘Travel Expenses’ multiline. |
Cost Head |
From the drop-down list box, select the required option. The combo is loaded with various options (defined in quick codes) for you to choose. |
Cost |
Enter the cost for every cost head, if any. |
Upcharge Cost |
Enter the upcharge cost, if any. |
Ammortisation Cost |
Enter the ammortisation cost, if any. |
Total Cost |
The total cost is the summation of Cost, Upcharge Cost and Ammortisation Cost in the ‘Other Expenses’ multiline. |
Other Cost – Total |
The summation of Total Cost in the ‘Other Expenses’ multiline. |
The “Assumptions” tab captures the assumptions based on which the estimation is made.
Assumption ID |
Enter a unique assumption id. |
Assumption Category |
From the drop-down list box, select the required assumption category based on the entered assumption id. |
Assumption Description |
Enter the description for the entered assumption id. |
Milestone ID |
Enter a relevant milestone id. Mandatory. |
Milestone Description |
Enter a description for the entered milestone id. Mandatory. |
Estimated End Date |
Enter the estimated end date for all the milestones. Mandatory. |
Revenue Amount |
Enter the revenue amount for all the milestones. |
Total Revenue Amount |
The summation of revenue amount of all the milestones defined. |
Role |
From the drop-down list box, select the required role. The combo is loaded with various values (defined in quick codes) for you to choose. The system displays “Select” by default on launch of the page. |
Site |
From the drop-down list box, select the required site. The combo is loaded with the values “Offshore”, “Onsite” and “Onshore” for you to choose. The system displays “Select” by default on launch of the page. |
Efforts |
Enter the estimated effort for combination of role and site. Mandatory. |
Rate |
The rate value is displayed based on the cost rate card. |
UOM |
The UOM is displayed based on the revenue rate card. |
Total Value |
The total value is calculated based on the following: Total Value = Rate per Hour * Effort |
Total Efforts |
The summation of efforts of all the roles. |
Employee Code |
Enter a relevant employee code. Help facility available |
Site |
From the drop-down list box, select the required site. The combo is loaded with the values “Offshore”, “Onsite” and “Onshore” for you to choose. The system displays “Select” by default on launch of the page. |
Efforts |
Enter the estimated effort for combination of resource and site. Mandatory. |
Rate |
The rate value is displayed based on the revenue rate card. |
UOM |
The UOM is displayed based on the revenue rate card. |
Total Value |
The total value is calculated based on the following: Total Value = Rate per Hour * Effort |
Total Efforts |
The summation of efforts of all the resources. |
Transaction/Process Unit |
From the drop-down list box, select the required option. The combo is loaded with various options for you to choose. These are user defined values defined in quick codes. |
Site |
From the drop-down list box, select the required site. The combo is loaded with the values “Offshore”, “Onsite” and “Onshore” for you to choose. The system displays “Select” by default on launch of the page. |
Count |
Enter a relevant count in this field. Mandatory. |
Rate/Count |
The rate value is displayed based on the cost rate card. |
Production Cost |
The production cost is calculated and displayed in this field. Production Cost = Rate * Count |
Manpower Cost |
The manpower cost for each transaction is calculated based on the effort entered grade wise or employee wise. The man power is either the total of grade wise or employee wise cost. |
Value |
The summation of production and manpower cost. |
Total Value |
The summation of total values of all the transactions. |
Revenue Estimate |
The revenue estimate is calculated and displayed in this field. |
Man Power Cost |
The man power cost is calculated based on the cost rate card value entered in the screen. |
Travel Expenses |
The travel expenses are calculated and displayed in this field. |
Other Expenses |
The other expenses are calculated and displayed in this field. |
Contingency Cost |
The contingency cost (the total of all the cost) is calculated and displayed in this field. Based on this the “Gross Margin” and “Gross Margin” (%) will be computed and displayed. The contingency cost is calculated using the formula (Actual Cost * Contingency %). |
Gross Margin (Amount) |
The Gross Margin is arrived by subtracting the total cost from total revenue. Gross Margin = Revenue – Cost. Note: The Gross Margin amount can also be a negative value. |
Gross Margin (%) |
The Gross Margin percentage is calculated using the formula (Revenue – Cost/Cost). Note: The Gross Margin percentage can also be a negative value. |
Note: On clicking “Submit” the status will be changed to “Submitted”.
Note: On clicking “Authorize” the status will be changed to “Authorized”.
Note:
On clicking “Amend” the status will be changed to “In Amendment” and on submit, the status will be changed to “Pending for Authorization – Amend”.
Estimation is amended only when it is in the authorized status. The changes will be stored and accommodated.