Authorizing manpower plan

Authorize Manpower Planning for Departments - A summary of the activity

Page objective

Glossary

How to use the web page

Using online help

The “Authorize Manpower Plan” page appears.

The system displays the following

Planning Unit

 The description of the Organization Unit in which manpower planning component is deployed.

Date Format

The date format that is applicable to the login user.

Planning Calendar

The description of the planning calendar.

Planning Period

 The planning period for which you must record the manpower planning details.

Plan Code

The unique code for the manpower plan.

Plan Description

The description of the manpower plan.

Plan Period

The start date and the end date of the planning calendar

The system displays the following in the multiline

Employment Unit

The employment unit for which the manpower planning was structured.

Work Location

The work location for which the manpower planning was structured.

Department

The department for which the manpower planning was structured.

Position Title

The title of the position for which the manpower planning was structured.

Job Title

The title of the job for which the manpower planning was structured.

Grade Set                        

The grade set for which the manpower planning was structured.

Grade

The grade for which the manpower planning was structured.

Budgeted Headcount

The total headcount of the previous approved planning calendar.

Existing Headcount

The existing number of employees mapped to the primary assignment.

Variance Headcount

The difference between the budgeted headcount and the existing headcount.

Budgeted FTE

The total FTE of the previous approved planning calendar.

Existing FTE

FTE= Standard Hours per week/FTE standard hours per week.

The existing FTE depends on the employee’s cost center mapping and the department cost center distribution.

Variance FTE

The difference between the budgeted FTE and Existing FTE

Addl Headcount Reqd (Excl. Vacancy)

 The additional number of employees required excluding the number of vacant positions.

Additional FTE Reqd.(Excl. Vacancy)

The additional number of employees required for FTE(Full Time Equivalent) excluding the number of vacant positions for FTE.

When Required (Q1, Q2, Q3, Q4)

The quarter of the year for which the additional headcount is required.

Total Headcount

The formula for computing the total head count is as given below.

Total Headcount = Existing Headcount + Additional Headcount Required (excl. vacancy)

Total FTE

The formula for computing the total FTE is as given below.

Total FTE = Existing FTE + Additional FTE Required  (excl. vacancy)

Remarks

If the Additional Headcount Reqd and Additional FTE Reqd columns do not match, enter the number of hours or number. of sessions per week for the part timer in this  field

The system also displays the following details

Total Overall Headcount

The sum of the total headcount specified in each row of the multiline.

Existing Headcount updated on

The date on which the existing headcount was updated for the manpower plan.

Note: HR should enter new Departments and Positions in system before authorizing the manpower plan of department.

If HR clicks the Authorize button for Manpower plan for any Department then new position (if entered by department head) must be created in position master

To reject a manpower plan

 The “Authorize Manpower Planning” page appears.

The system displays the details in the “Authorize Manpower Planning” page.

Rejection Remarks

The reason for rejection of the manpower plan.

Go to top

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6      Hyperlinked topics below 

Page Objective

Use this page to authorize or reject the manpower plan for departments

Go to top