<<
Hangar
Hangers
Hard-Time”
Hard Allocation Required
Hard”
Heating
up.”
help
Hence ATA 21
High”
Him/her
allocated
Hold
Period
Hold Buy”
Hold Pay”
Hold”
Holiday Master
home
Hour’s
Hours
Flying
Hours”
HR Set Up
HR Set Up Unit
Human Resource Management Process
IATA
IATA”
ICAO
ICAO”
icons on tool bar
ID
Identifying
inter-warehouse
Type Certificate
Unit
Improvisation”
In-house
In-House Repairable
In–Situ
Inactive
Inactive”
Incident Type
Including
Dependent Status
INCO
INCO Term
Incoming
Serial
Incomplete – When
Incomplete”
Indefinite
Index
Setting Options
Viewing user-defined parameter rating
Index Basis
Indicates
Induction Date
Industry”
Inflight Delay
Influence
employee’s
Informational
Informative”
Initial Accuracy
Initial Monthly Reliability Alert
Initial Reliability Alert
Inoperative.”
Inprogress”
insert record
Inspected By
Inspected Date
Inspection
Inspection Cost Reimbursement
Inspection Qty
Inspection Type
Inspection/testing
Inspector
Installation Date
Installation Time
Installed By
Installed Comp
Insurance Amount
Insurance By
Insurance Liability
Insurance Terms
Inter-warehouse
identifying
Interchangeability
Interchangeable
Interchangeable Part
Internal
Internal – Indicates
Internal”
International Air Transport Association Number
International Civil Aviation Organization Number
International Commercial Term
International Organization
Standardization
Interval Value
Intra-warehouse
Inventory
Inventory Item
Inventory”
Invoice Matching
Invoicing
Org
IPC
ISO
ISO Currency Code
Issue Date
Issue Part
Issue Qty
Pending
Issue Warehouse
Issued Quantity
Issued Serial
Issuing
CoM
Job Classification
Job Information
part
Job Source
Job Status
Job Type
Journey Log
Junior Management
K
values
Kg / Hour
Kit Part
Kit”
Labor Cost
Landing
Cycles
Date
Landing Gear”
Last Forecast
Last Generated No
Last In First Out
Last Modified By
Last Modified Date
Last Performed Date
last record
Lead Time
Lead Time Units
Lease Type
Leased Out”
Leased”
Lens
Level Code
License Category
Life
Remaining
Life Parameter
LIFO
Limit Control
Limit Type
Line Item Cost
Line Item Value
link
Link Flag
Listing
FAA-approved
Loan
Loan – Indicates
Loan Agreement
Loan Order
Loan Receipt
Loaned”
Loanee
Location
Enterprise One Unified Glossary
Maintain User Defined Parameters - A summary of the activity
Maintaining user defined parameters
Ordering
Requesting
Location”
Locations”
Log Book
login
Basics of using a typical web page
Enterprise One Unified Glossary
belonging
logout
Lot
Lot & Serial Controlled
Lot Controlled
Lot No Controlled
Lot No Type Num
Lot Quantity
Lot Quarantined Qty
Low”
LRU”
Maint Report
Maintain
index
Maintenance
Maintenance Base
Maintenance Change Request
type
Maintenance Change Request Class
Maintenance Change Request Document Type
Maintenance Change Request Number
Maintenance Implications
Maintenance Issue Transaction
Maintenance Planning Document
Maintenance Planning Document Tasks
Maintenance Process
Maintenance Program
Maintenance Type
Manager-HR’
Managerial Job’
Managers
Mandatory
Manual – The
Manual”
Manufacture
Manufacturer
NATO Supply Code
Manufacturer Code
Manufacturer Lot
Manufacturer Part Number
Manufacturer Parts
Manufacturer Serial
Manufacturer Sl No
Manufacturer’s
Manufacturer”
Manufacturers’
mapped to another record
Mapping
Status
Marital Status
Master
Science
Matching
Type
Material
Material Controller
Material Cost
Material Request
Material Specification
Matl Return Authority
Max Remaining Life
Maximum OT Hours/Week
Maximum Reimbursement
Maximum Zone
MCM
MCR Class
MCR Doc Type
MCR Doc Type’
MCR Issue Date
MCR Part
MCR”
MCRs
existing
regarding
Terminating
type
Mean Time Between Failures
Mean Time Between Unscheduled Removals
Measurement
Mechanic
Medium”
MEL
MEL Category
MEL item
MEL Quantity
Method
Packaging
Shipping
Middle Management
Min-Max
Minimum Equipment List
Minimum Equipment List Quantity
Minimum Lot
Minimum Order Qty
Minimum Remaining Life
Minimum Shelf Life
Minimum Zone
Minutes”
MIREP
Miscellaneous
Miscellaneous”
Mod Status
MOD Tasks
Mod”
Model Configuration
Updating
Modification Committee Meeting Number
Modified Part Applicability
Monthly Reliability Alert
ATA System
Component
Months
Moved Qty
Moving
Average
Moving Average”
MPD Tasks
MPDs
MR
MR Class
MR Priority
MR Type
MSG-3
MSN
gives
MTBF
MTBR
MTBUR
terms
multiline
Basics of using a typical web page
Enterprise One Unified Glossary
multiline item
delete
Multiple – Indicates
Multiple”
>>