Viewing maintenance object and work scope details

Unified Glossary

Basics of using a typical web page

Using Online Help

The “Maint. Object Details” multiline displays the following.

Line #

The number identifying the line in the repair order.

Part #

The number identifying the part for repair.

Mfr. Part #

The number provided by the manufacturer of the part.

Mfr. #

The code identifying the manufacturer of the part

Part Description

The name / description of the part.

Quantity

The number of parts for repair.

UOM

The unit of measurement applicable for the part.

Serial #

The serial number of the part.

Lot #

The lot number of the part.

Stock Status

Use the drop-down list box to select the user-defined stock status of the part.

Cost

The indicative cost of repairing the part.

Work Requested

The requested work to be executed on the part.  

Part Type

The type of the part, such as “Raw Material”, “Component”, “Expendable”, “Tool”, “Miscellaneous”, “Consumables” and “Kit”.

Facility Object #

The identification number of the facility object related to the part.

Facility Type

The type of the facility object, such as Tool, Equipment or Other relate to the part.

Received Qty

The received part quantity.

Line Status

The status of the line in the repair order, such as “BER Closed”.

Shipped ?

Indicates whether the part (main core) in the repair order is shipped to the repair shop.

Remarks

Your observations or additional information on the repair / service order.

 Select the icon to view the remarks history

The system displays the following in the “Work Scope” multiline:

Repair Process Code

The repair process to be executed on the part.

Maintenance Type

The maintenance job required for the component.

Work Unit #

The number identifying the work unit to be performed on the component.

Work Unit Desc

The textual description of the work unit.

Work Unit Type

The type of work unit to be performed on the component. The work unit could be of type ”Task”, ”Std Procedure” or “Aircraft Work Package”.

Schedule Date

The schedule date on which the work unit must be performed.

Ref. Document Type

The type of reference document of the work unit, such as Component Work Order, Hangar Work Order, Tech Log and, Others.

Ref Document #

The code identifying the reference document.

Comments

Any additional comments pertaining to the creation of repair order.

Part #

The number identifying the part on which the work has to be performed.

Mfr. Part #

The number provided by the manufacturer of the part.

Mfr. #

The code identifying the manufacturer of the part

Serial #

The serial number of the part on which the work has to be performed.

Eng. Doc #

The number identifying the engineering document. Click the Eng. Doc # to view the Engineering document.

Eng. Doc Rev. #

The number identifying the revision # of the Eng. Doc #.

Relationship Type

The Relationship of the work unit with its parent task.

Parent Task #

The parent task of the work unit #.

Note: The system displays or hides the Mfr. Part # and Mfr. # columns based on the options set in “Set Inventory Process Parameter” activity in the “Logistics Common Master” business component.

The system ensures the following:

  1. The Repair Order component interacts with the Technical Document Interface (TDI) business component.

  2. The parameters are defined for the Technical Document System in the interacting Technical Document Interface (TDI) business component.

  3. A value exists in the Repair Order #.

  4. Prints task cards for all the tasks.

 

To proceed carry out the following: