"View Order Details” Popup
On selecting the “View Order Details” link in the left pane, the system displays the task details of the selected work order in the multiline in the right pane. The parent task, intermediate tasks and the operation tasks in the work order are displayed in a hierarchical chain in the multiline.
The system displays the following details in the multiline:
Child Work Order # |
The code identifying the child work order. |
Seq # |
The sequence number of the task. |
O. Seq # |
The sequence number of the task, defined in the repair scheme. |
Task # |
The code identifying the task within the shop work order. |
Task Description |
The textual description of the task. |
Revision # |
The latest revision number of the task. |
WBS Code |
The Work Breakdown Structure (WBS) code indicating the attributes that identify whether the task is executed for planning purpose or execution purpose. |
Exec. Status |
The execution status of the task, which could be “Draft”, “Fresh”, “Planned”, “In-Progress”, “Completed”, “Cancelled”, “Pre-closed”, “Closed” “Ext. Routed” or “Duplicate”. |
Est. Status |
The estimation status of the task, which could be “Not Required”, “Pending Estimates”, “Pending Confirmation”, “Confirmed Estimates”, “Released Estimates” or “Re-estimates Required”. |
User Status |
The user status with respect to the work order. |
Hold Status |
The hold status of the task. The system displays the value “On Hold” if the task is on hold. |
Exec. Action |
The execution-related action to be performed on the task, which could be “Execute”, “Re-Execute “, “Cancel”, “Pre-Close”, “Already Complied”, “Not Applicable”, “Previously Complied” or “Duplicate Compliance”. |
Work Scope Notes |
Additional details related to workscoping of the tasks. |
Eng. Instructions |
Any comments provided to instruct the mechanic. |
Separated? |
Indicates whether the tasks can be moved from the parent work order to the child work order or not. The system displays “Yes” or “No”. |
Part # |
The code identifying the part against which the task is executed. |
Serial # |
The serial number of the part. |
Disposition |
Indicates the type of work performed on the part. |
Routing Reqd.? |
Indicates whether routing is required for a part after completing the required task. The system displays “Yes” or “No”. |
Work Center # |
The code identifying the work center that is responsible for SWO execution. |
Exec. Priority |
The priority of execution of the task. |
Plan Start Date / Time |
The planned start date and time of the task. |
Plan End Date / Time |
The planned end date and time of the task. |
Actual Start Date / Time |
The actual start date and time of the task. |
Actual End Date / Time |
The actual end date and time of the task. |
Est. Elapsed Time |
The estimated elapsed time for execution of the task. |
Time UOM |
The time unit in which the ‘Est. Elapsed Time’ is displayed. The system displays the value “Hours” or “Days”. |
Actual Duration |
The actual duration of completion of the task. |
Repair Classification |
The repair classification defined to differentiate the tasks which are over and above the contract (COA - Contract Over and Above) between the operator and the MRO. |
Exec. Category |
The execution category of the task. |
Expense Type |
The expense type of the work order, which could be “Revenue” or “Capital”. |
CAPEX # |
The capital expense proposal number applicable to the work order, if the Expense Type is “Capital”. |
Exec. Phase |
The execution phase of the task. |
Under Warranty? |
Indicates whether the main core is under warranty. The system displays “Yes” or “No”. |
Repair Basis |
The basis on which the repair scheme is acquired or modified for the execution of the task. The system displays one of the following values:
|
Repair Process Code |
The repair process code that defines various repair processes that are performed on a component. |
Eng. Doc # |
The code identifying the Engineering Document, if the task is created in the Engineering Document. |
Eng. Doc Rev. # |
The revision number of the Engineering Document. |
Order Description |
The textual description of the work order. |
Event # |
The event number identified for grouping the shop work order. The event number is a linkage between the parent work order and the child work order. |
Parent Task # |
The code identifying the parent task. |
Root Task # |
The code identifying the root task. |
Part Desc |
The textual description of the part against which the task is executed. |
Comp # |
The code identifying the component to which the part belongs. |
Exec. Facility |
The facility where the task is executed. The system displays the values ‘I’ which refers to “Internal” or ‘E’ which refers to “External”. |
Repair Agency # |
The preferred repair agency for repairing the part. |
Compliance Date |
The compliance date of the task. |
ATA # |
The ATA chapter to which the task belongs. |
Forecast # |
The forecast number available for the task, if the source document available for the task is “Component Maintenance Forecast”. |
Est. Man Hours |
The man hours estimated to complete the task. |
Select the required task/discrepancy in the multiline and then click the “Print Task/Discrepancy Card” link to view the Task or Discrepancy card.