<<

Hangar
Hangar Work Order
   Set Options
   Unified Glossary
help
home
Human Resource Management Process



icons on tool bar
ID
   Reviewing Fleet Maintenance
   Set Options
   Reviewing Work Center Loading
   Unified Glossary
In-house
Incident Type
Induction Date
Inflight Delay
Informational
Initial Monthly Reliability Alert
insert record
Inspected By
Inspected Date
Inspection
Inspection Cost Reimbursement
Inspection Qty
Inspection Type
Inspector
Installation Date
Installation Time
Installed By
Installed Comp
Insurance Amount
Insurance Liability
Insurance Terms
Inter-warehouse
Interchangeable
Interchangeable Part
International Air Transport Association Number
International Civil Aviation Organization Number
International Commercial Term
Interval Value
Intra-warehouse
Inventory
Inventory Part
ISO Currency Code
Issue Date
Issue Part
Issue Qty
Issue Warehouse
Issued Quantity
Issued Serial



Job Source
Job Status
Job Type
   Reviewing Fleet Maintenance
   Unified Glossary



Labor Cost
Landing
Landing Gear
Last Forecast
Last Generated No
Last In First Out
Last Modified By
   Set Options
   Unified Glossary
Last Modified Date
   Set Options
   Unified Glossary
Last Performed Date
last record
Lead Time
Lead Time Units
Lease Type
Lens
Level Code
License Category
Life Parameter
LIFO
Limit Control
Limit Type
Line Item Cost
Line Item Value
link
Loan Order
Loan Receipt
Log Book
login
logout
Lot
Lot & Serial Controlled
Lot Controlled
Lot No Controlled
Lot No Type Num



Maintenance Base
Maintenance Change Request Class
Maintenance Change Request Document Type
Maintenance Change Request Number
Maintenance Implications
Maintenance Issue Transaction
Maintenance Planning Document
Maintenance Planning Document Tasks
Maintenance Process
Maintenance Type
Manufacturer ATA
Manufacturer Code
Manufacturer Lot
Manufacturer Part Number
Manufacturer Parts
Manufacturer Serial
mapped to another record
Material
Material & Resource Constraint
Material Constraints
Material Controller
Material Cost
Material Request
Material Specification
Material Type
Matl Return Authority
Max Remaining Life
Max.Active Forecasts
Maximum OT Hours/Week
Maximum Reimbursement
Maximum Zone
MCR Issue Date
MCR Part
Mean Time Between Unscheduled Removals
Measurement
MEL
   Reviewing Fleet Maintenance
   Unified Glossary
MEL Category
MEL Count
MEL item
MEL Pending
MEL Quantity
Minimum Equipment List
Minimum Equipment List Quantity
Minimum Lot
Minimum Order Qty
Minimum Remaining Life
Minimum Shelf Life
Minimum Zone
MIREP
Modification Committee Meeting Number
Modified Part Applicability
Monthly Reliability Alert
Months
MR Type
multiline
multiline item
    delete
Multiple Tasks



Negative Tolerance
Net Quantity
Newly Overhauled
Next Empty Storage
Next Higher Assembly Part Number
Next Higher Assembly Serial Number
next record
Non-Routine Task
Numbering Options
Numeric ISO Currency Code



Object Type
Observed Faults
OEM Faults
Off-Wing
On-Wing
   Reviewing Fleet Maintenance
   Unified Glossary
Open Access Panel Task
Open Defects
Operational Date
Operational Implications
Operational Location
Operations Related Savings
Operations Type
Opportunity Maintenance
Optional
Order Quantity
Order/task
Organizational Unit
Overtime Processing



page
    ILBO
page-two pages open simultaneously
Parameter
Parameter Based Charges
Parameter Interval
Parameter Source
Parameter Type
Parent CWO
Parent Delivery Area Code
Parent Work Center
Parent Work Center Description
Part Account Group
Part Category
Part Classification
Part Condition
Part Control Type
Part Cost
Part Failed Date
Part Identifier
Part Number
Part Ownership
Part Rating
Part Serial
Part Type
Partially Accepted
Parts Expense Basis
Pay Term
Pay Term Type
Payment Currency
Payment Priority
PBH Exchange
PBH On
PC Type
Per Asset Value
Per Cost
Physical Inventory
Physical Inventory Plan Number
Placement Priority
Placement Strategy
Plan Aircraft Maintenance
Plan Date
   Reviewing Fleet Maintenance
   Reviewing Work Center Loading
Plan Demand Qty
Plan End Time
Plan Level
Plan Receipt Qty
Plan Start Date
Plan Start Time
Planner Group
   Reviewing Fleet Maintenance
   Unified Glossary
Planner Group Security
   Reviewing Fleet Maintenance
   Set Options
Planning Element
   Reviewing Fleet Maintenance
   Set Options
Planning Horizon
Planning Object Types
Planning Summary Details
PO Additional Charges
PO Basic Value
PO Covered Qty
PO Currency
PO Line
PO Total Value
PO Type
Position Code
Position Control ID
Position Formula
Position Type
Positive Tolerance
Post Order Lead Time
Power By Hour Agreement
Preferred Model
Preferred Supplier
Premature Removal Rate
Present Value
Pressure Altitude
Previous Part
previous record
Primary Skill
Primary Work Center
Prime Part Number
Problem Demand
Problem Quantity
Process Action
Process Order Lead Time
Program Category
Program Revision
Proximity Indicator
Purchase Lead Time
Purchase Order
Purchase Request
Purchase UOM
pushbutton



Qualitative Value
Quality Attribute
Quality Rating
Quantitative Value



Range Parameters
Re-certification
Re-Forecast Impact
Re-Schedule Count
Reason Code
Reason Code Type
Receipt
Receipt Horizon
Receipt Satisfactory
Receipt Tolerance
Receipt Type
Receipt Warehouse
Receipt-Inspection
Received Part
Received Qty
Recommended Use
record
Record Page
Ref Document Currency
Reference
Reference Doc Type
Reference EO
Reference Status
refresh
Regulatory Authority
Reimbursement Limit
Reimbursement Type
Reject Reason
Rejected
Relationship Type
Release Slip
Reliability Alert
Reliability Calendar Code
Reliability Fleet
Remedial Action
Removal Type
Remove Quantity
Rental Receipt
Reorder Level
Reorder Qty
Repair
Repair Agency
Repair At
Repair Order
Repair Process Code
Repair Shop
Repeat Fixed Interval
Repeat Floating Interval
Repeat Interval
Repl Confirmed Date
Replacement
Replacement Type
Representatives
Request Status
Requested Part
Reservation Horizon
Reserve
Reserved Quantity
Resolution Doc
Resolution Procedure
Resolution Type
Resource
Resource Constraints
Resource Cost
Resource Group
Resource Last Updated
Resource Type
Response Declined
Retrieve the record
Return Basis
Return Date
Return Qty
Return Type
Review Work Center Loading
   Aircraft Maintenance Planning - An Overview
   Reviewing Work Center Loading
Revise Estimate
Revised By
Revised Date
Revision Date
Rework
Right
Rogue Unit
Rota Plan
Rota Schedule
Round Down
Round Off
Round Up
Routine Tasks


>>