<<

Object
    Planning
Object Type
   Manage Work Assignments and Reporting.htm
   Unified Glossary
    Planning
Observed Faults
Occ
    Default Time Zone
Occupation
Occurrence Occurred During
Occurrence Report
Occurrence Type
OEM
OEM Faults
OEM Name
OEM-provided
Off-Wing
On-Condition
On-Wing
One Time
One Way
Open Access Panel Task
Open Periods
Opening
   Basics of using a typical web page
   Unified Glossary
    Balance
    Web
Operating
    Frequency
Operational Date
Operational Implications
Operational Location
Operations Related Savings
Operations Type
Operator
Operator-provided
Operator’s
Opportunity Maintenance
Order
    Engineering
    Location
    Preference
Order Number
    Engineering
Order Quantity
Order/task
Org
   Basics of using a typical web page
   Unified Glossary
    Invoicing
    Requesting
Organization Structure
Organizational Unit
Original Equipment Manufacturers
    name
OU
OU Description
Out Source
Outgoing
    Condition
    Part
    Serial
Overall Rating
Overhaul
Overtime
Overtime Processing
Overtime Rates
Ownership Document



P.R.
P.R.Date
P/N
P/N Change Allowed
Package Types
Packaging
    Code
    Condition
    Method
    Terms
Packs
    Number
    Slip
page
    ILBO
page-two pages open simultaneously
Parameter
    Triggering
Parameter Based Charges
Parameter Interval
Parameter Source
Parameter Type
Parent CWO
Parent Delivery Area Code
Parent Work Center
Parent Work Center Description
Part
    aircraft/component
    Job Information
    Outgoing
    Reliability Fleet
Part Account Group
Part Administration
Part Category
Part Classification
Part Condition
Part Control Type
Part Cost
Part Description
Part Failed Date
Part Identifier
Part Number
Part Ownership
Part Rating
Part Serial
Part Type
Partially Accepted
Partially Amended
Partially Issued
Partner
    Trading
Parts Consumptions Details
Parts Expense Basis
Pass
Pax
Pay Term
Pay Term Type
Payment Currency
Payment Priority
PBH
   Manage Work Assignments and Reporting.htm
   Unified Glossary
PBH Agreement
PBH Exchange
PBH On
PC
PC Maximum Value
PC Minimum Value
PC Type
Pending
    Issue Qty
    Return Qty
Pending Authorization
Pending Return Quantity
Per Asset Value
Per Cost
Performed At
Performing
    EO
Period
    Holding
Personnel Related
Phased Out
   Manage Work Assignments and Reporting.htm
   Unified Glossary
Physical Inventory
Physical Inventory Plan Number
PI
PI Plan
Picking
    Priority
    Strategy
Piece Part
Pilot
Pilot Activity
PIREP
Placement Priority
Placement Strategy
Plan Date
Plan Demand Qty
Plan Demands
Plan End
Plan Level
Plan Receipt Qty
Plan Start Date
    change
Planned
   Manage Work Assignments and Reporting.htm
   Unified Glossary
    Action
    Base
    Object
    Object Type
    Status
    Type
Planned End Date
Planned Hours
Planned Start
Planner Group
Planning Object Numbers
Planning Object Types
Planning Type
Plumbing Services
PO
    create
PO Additional Charges
PO Basic Value
PO Covered Qty
PO Currency
PO Line
PO Total Value
PO Type
Point
    Shipping
Poolable
Position Code
Position Control ID
Position Formula
Position Type
Positive Tolerance
Post Flight
Post Order Lead Time
Power By Hour Agreement
PR
PR Type
PR Value
Pre Order Lead Time
Precedence CWO
Preclosed
Preference
    Order
Preferred Model
Preferred Supplier
Premature Removal Rate
Pressure Altitude
previous record
Price Held Firm Time
Price List
    sends
Price Rating
Primary / Execution Work Center Toggle button’
Primary Output
Primary Skill
   Manage Work Assignments and Reporting.htm
   Unified Glossary
    defined
Primary Work Center
   Manage Work Assignments and Reporting.htm
   Unified Glossary
Primary Work Center Level
Prime Part Number
Principal Part
Priority
    Picking
Problem Demand
Problem Quantity
Process Action
Process Order Lead Time
Productivity Factor
Program Category
Program Revision
Proximity Indicator
PRR
Purchase
Purchase Committee
Purchase Lead Time
Purchase Order
Purchase Request
   Manage Work Assignments and Reporting.htm
   Unified Glossary
    generates
Purchase UOM
Purchase-related
pushbutton



QC
QC Clearance Required
Qty Reserved
Qty Reserved By Plan Demands
Qualitative
Qualitative Value
Quality Attribute
Quality Rating
Quantitative
Quantitative Value
Quantity
Quantity / Assembly
Quantity & Value
Quantity Price Break
Quarantine
Quarantine – Used
Quarantined Qty
Quick Code Type
Quick Codes
Quotation Type



Range
Range Parameters
Raw Material
RCA Ref
Re-certification
Re-Forecast Impact
Re-Schedule Count
Reason Code
Reason Code Type
Receipt
Receipt Horizon
Receipt Satisfactory
Receipt Tolerance
Receipt Type
Receipt Warehouse
Receipt-Inspection
Received Part
Received Qty
Recertification
Recommended Use
record
Record Employee Time sheet
Record Work Unit
Recording
   Manage Work Assignments and Reporting.htm
   Basics of using a typical web page
   Unified Glossary
    Station
    timesheet
Recount Mandatory
Recount Qty
Recount Tolerance In
Recount Tolerance In Units
Recurring
Reduced Vertical Space Minima
Ref
   Manage Work Assignments and Reporting.htm
   Unified Glossary
    Expense Type
Ref Document
Ref Document Currency
Ref.Doc
    Corresponding
Ref.Doc.#-Task
Ref.Doc#-Task
Reference
    Drawing
Reference Doc
Reference Doc Type
Reference EO
Reference Status
refresh
Refurbishment
Regularize Leave
Regularize Leave/Attendance Changes
Regulatory Authority
Reimbursement Limit
Reimbursement Type
Reject Reason
Rejected
Rejection
Rejection – Used
Relate
    aircrafts
Relationship Type
Release Slip
Releasing
    EAN
    EO
Reliability
Reliability Alert
Reliability Calendar Code
Reliability Fleet
    part
Rem Confirmed By
Rem Confirmed Date
Remaining
    EC
    EH
    FC
    FH
    Life
Remedial Action
Removal Type
Remove Quantity
Removed Part
Rental Receipt
Rented Out
Reorder Activity
Reorder Level
Reorder Qty
Repair
Repair Agency
Repair At
Repair Order
Repair Process Code
Repair Shop
Repair Station
Repair/Make Qty
Repairable
Repeat Fixed Interval
Repeat Floating Interval
Repeat Interval
Repetitive
Repl Confirmed By
Repl Confirmed Date
Replacement
Replacement Type
Replies
    RFQ
Reported
    ATA
    Date
    Station
    Time
    Time Zone
Reported Date
Request Matrix
Request Status
Requested Part
Requesting
    Location
    Org
Required
Reservation Horizon
Reserve
Reserved Quantity
Resolution Doc
Resolution Procedure
Resolution Type
Resource
Resource Cost
Resource Group
Resource Last Updated
Resource Type
Response Declined
Restricted
Retire
Retrieve the record
Retro fitment
Retrofit
Return Basis
Return Date
Return Qty
    Pending
Return Type
Returnable
Returnable Input
Returnable – Return
Returned From
Revenue
Review Work
   Manage Work Assignments & Reporting - An Overview
   Manage Work Assignments and Reporting.htm
Revise Estimate
Revised
Revised By
Revised Date
Revising
    EAN
Revision
    Drawing
Revision Date
Rework
RFQ
    replies
RII
RO
Rogue Unit
Rota Plan
Rota Schedule
Rotable
Round Down
Round Off
Round Up
RS
RS Type
RVSM


>>