Entering resources information for the non-standard task
This page allows you to enter resource requirement details for non-standard task. Tell me more.
Select the “Edit Resource Requirements” link at the bottom of the main page.
The “Edit Resources Requirements” page appears.
The system displays the following fields in the “Task Details” group box:
Task Applicability |
Indicates whether the task is applicable for “Aircraft”, “Engine” or “Component”. |
Aircraft Model # |
The number identifying the aircraft model on which the task can be performed |
Task # |
The task for which the resource details have to be specified. |
Task Class |
The classification identifying whether the task is a standard task or non-standard task |
Task Description |
The textual description of the task. |
Enter the following:
Resource Type |
Use the drop-down list box to select the type of the resource for which the details are to be added or modified. The available options are “Tools”, “Others”, “Skills”, and “Equipment”. The system sets the field to “Skills” by default. |
Click the “Get details” pushbutton to retrieve the resource details that are already defined for the task and resource type combination.
Enter the following fields to modify these details or add new resources for the task in the “Resource Details” multiline:
Resource # |
The resource required for completing the non-standard task (Alphanumeric, 40). The resource of type “Skills” must have been already defined in the "Create Employee File" activity of the "Employee Information" business component and resource of type “Tools”, “Others” and “Equipment” must have been defined in the “Work Center” business component. For each resource type, the resource number must be unique within the multiline. Help facility available. |
Resource Description |
The textual description of the resource (Alphanumeric 150) |
Time Unit |
Use the drop-down list box to specify the unit of measurement for the resource time, which could be “Minutes”, “Hours” or “Days”. The system sets the field to “Hours” by default. |
Est. Time |
The number of hours, minutes or days for which the resource is required to complete the task (Decimal). Mandatory. |
Est. Nos. |
The number of resources required for completing the task (Integer). Ensure that the value entered in this field is positive. |
Check the box in the “Select” column of the multiline to mark the resource for deletion.
Click the Delete icon in the tool bar above the multiline, to delete the resources selected in the multiline.
Click the "Edit Resource Requirements" pushbutton to add or modify the details of the resource.
Entering resources information for the non-standard task – An overview
This option allows you to add or modify the details of resources required for executing the non-standard task. If you wish to define the resources for the task, you can enter details such as resource code, estimated duration, and number of resources needed against each resource type. You can also retrieve resources that have already been defined for the task and modify its details. The system updates the resource details and sets the last modified date to the current server date.