Managing quote workings  

Unified Glossary

Basics of using a Ramco iEnterprise Series 4.0 Web Page

Using Online Help

This activity enables you to record estimates, compute prices and arrive at a Fixed Price based on the specific role of the login user. Option Setting “Allow Estimations & Quote Working by the same User” for a Bid Contract in the Set Sales Process Parameters under Customer business component can be used to control the usage of this activity. Tell me more.

Based on the role of the login user, whether Planner, that is the personnel who estimates and the Commercial Representative that is the personnel who performs the price and quote workings can manage this screen.

After confirmation of the estimations by the Planner, the system queues the Quote Workings document for the commercial representative for further processing.

Note: They system considers the login user as the commercial Rep if the parameter “Allow Estimations & Quote Working by the same User” in the Set Sales Process Parameters under Customer business component is set as ‘No’.

The system displays the following field:

Quote Working Document #

Indicates the associated quote working document number.

Revision #

Use the drop-down list box to select the latest revision of the Quote Working Document #. The system lists all the revisions of the Quote Working Document.

By default the system displays the latest revision of corresponding quote working document.

The system displays the following field:

Date

Indicates the current system date in which the Quote Working document is created.

Status

Indicates the status of the Quote Working Document, which could be Draft, Fresh, Confirmed, Cancelled, or Revised'.

Click the hyperlinked   edit icon to make any modifications to the quote workings. The Edit Quote Working Document popup appears.

Customer #

Indicates the customer as in the reference document.

Object/WS

Indicates the 'Object' and 'Workscope' combination in Bid contract for which quote working document is created. If there are more than one combination, field displays the value with first Object-Workscope combination + ‘n’ more.

Currency

Indicates the currency of the reference document.

The system displays the following fields in the ‘Additional Details’ group box:

Ref. Doc. Type

Indicates the type of the reference document which is ‘Bid Contract’.

Ref. Doc. #

The number identifying the respective bid contract.

Working for

Indicates the 'Object' and 'Workscope' combination in Bid contract for which quote working document is created. If there are more than one combination, field displays the value with first Object-Workscope combination + ‘n’ more.

Estimation Status

The estimation status at document level which could be any of the following:

  • Not Initiated: Indicates that, against ‘Object-Workscope-Pricing Model’ combination in Quote Working document, estimation action is not initiated for atleast one combination. Pending: Indicates that, against ‘Object-Workscope-Pricing Model’ combination in Quote Working document, estimation action is initiated for all combination but estimation is not yet completed.

  • Pending Confirmation: Indicates that against ‘Object-Workscope-Pricing Model’ combination in Quote Working document, estimation is completed for all combinations but not yet confirmed.

  • Confirmed: Indicates that against ‘Object-Workscope-Pricing Model’ combination in Quote Working document, estimation is confirmed for all combinations.

  •  Partially Confirmed: Indicates that against ‘Object-Workscope-Pricing Model’ combination in Quote Working document, estimation is confirmed only for some combinations but not yet confirmed for other combination.

  • Pending Re-Estimate: Indicates that against ‘Object-Workscope-Pricing Model’ combination in Quote Working document, estimation is initiated for re-estimated for any one of combination and re-estimate is not yet completed.

  • Revised: Indicates that particular revision of quote working document got revised. .

Cust. Req. #

The corresponding 'Bid Request #' for which the Bid Contract is created.

Purpose/User Status

Indicates the Purpose / User Status as in the Quote Working Document.

Category

Indicates the category to which the Quote Working document belongs.

Doc. Desc.

Indicates the textual description of the document as given in the ‘Create Quote Working Document’ screen.

Est. Notes

The estimation notes for the Quote Working Document.

Qt. Working Notes

The quote working notes for the Quote Working Document.

Rev. Remarks

The latest revision comments for Quote Working document. Mandatory if document gets revised.

The system leaves this field blank if the Quote Working Document does not have any revisions.

Canc. Remarks

The cancellation comments for Quote Working Document which is in cancelled status. The system leaves this field blank if the Quote Working Document is not in cancelled status.

Toggle and Tile section

The system displays the Toggle and Tile section only if the Assessment tab is completed for the given quote working document. The data count on the tiles represents the line count which are queued up for estimation.

Navigation to the Working multiline can be done by selecting a specific Tile and then select the required tasks that is listed in the Tree after which on clicking the “Move to Working” pushbutton the system moves the selected tasks to the ‘Workscope’ multiline.

Note that the system does not display the Toggle and Tile sections if the Quote Working Document is in ‘Draft’ status. The system displays all the three tabs Assessment/Working/Summary' if the status of the 'Quote Working Document' is other than Draft Status

Note that if the user is of both Planner and Commercial Role, the system retrieves all the Tiles.

Note that on click of a Tile, the system retrieves the details of all the detailed tasks uploaded against the particular document in the Tree Section.

Alert toggle button

#

Icon

Status

System Retrieves

1

Est. Qty < Actual Qty

Retrieves all the detailed operational tasks for which Est. Qty is lesser than Actual Qty in either “Materials/Resources” multiline.

2

Est. Qty < Req. Qty

 Retrieves all the detailed operational tasks for which Est. Qty is lesser than Reqd. Qty in either “Materials/Resources” multiline.

3

NRs-Not Estimated

Retrieves all the detailed operational tasks for which Non-routines are not estimated either at task level or at “Materials/Resources” level.

4

Tasks - Not Estimated

Retrieves all the detailed operational tasks for which either Materials (or) Resources estimation is required but not yet defined/estimated.

5

Cost not defined

 Retrieves all the detailed operational tasks for which cost is not updated at “Materials/Resources/Task” level.

6

Task Price < Cost

Retrieves all the detailed operational tasks for which 'Adj. Computed Price - Inclusions' is less than 'Adj. Total Cost - Inclusions' (or) ‘Computed Price - Inclusions' is less than 'Total Cost' against a task line in Workscope Section.

7

Part Price < Cost

Retrieves all the detailed operational tasks for which 'Adj. Computed Price - Inclusions' is less than 'Adj. Total Cost - Inclusions' (or) ‘Computed Price - Inclusions' is less than 'Total Cost' against a task line in Materials Section.

8

Resource Price < Cost

Retrieves all the detailed operational tasks for which 'Adj. Computed Price - Inclusions' is less than 'Adj. Total Cost - Inclusions' (or) ‘Computed Price - Inclusions' is less than 'Total Cost' against a task line in Resources Section.

Exception/Status toggle button

   The system displays the “Status” toggle button by default. The system displays the tiles as follows:

#

Icon

Status

System Retrieves

1

Pending Workscope

Retrieves all the Workscope tasks for which 'Detailed operational level tasks are not yet uploaded for the Object-Workscope (or) Object-Workscope-Pricing Model combination'.

2

Pending Conf.

Retrieves all the Workscope tasks for which 'Detailed operational level tasks have been either estimated or updated as not required for Object-Workscope (or) Object-Workscope-Pricing Model combination'.

3

Pending Re-estimate

Retrieves all the Workscope tasks for which 'Re-estimate’ action is initiated' for Object-Workscope (or) Object-Workscope-Pricing Model combination'.

4

All Tasks

 Retrieves all the detailed operational tasks that are uploaded against the quote working document.

5

All Pending Estimates

Retrieves all the detailed operational tasks for which either Materials or Resources estimation is required but not yet defined or estimated.

6

Pending Est. - Mat

 Retrieves all the detailed operational tasks for which Materials estimation is required but not yet defined / estimated.

7

Pending Est. - Res

Retrieves all the detailed operational tasks for which Resource estimation is required but not yet defined / estimated.

8

Pending Est. – NRs

Retrieves all the detailed operational tasks for which Non-routines are not estimated either at task level or at Materials / Resources level.

9

Tasks not Priced

Retrieves all the detailed operational tasks for which tasks are not yet priced but cost is defined.

10

Parts not Priced

Retrieves all the detailed operational tasks for which parts are not yet priced but part cost is defined.

11

 Resources not Priced

Retrieves all the detailed operational tasks for which Resources are not yet priced but resource cost is defined.

Note: The system displays only the “Working” tab for Planner role login logging from the "Record Work Estimates" activity under the "Work Monitoring & Control" business component.

The system displays the following fields in the ‘Record Statistics’ group box:

Created by

The login ID of the user who created the quote working document.

Created Date

The date on which the quote working document is created.

Last Modified by

The login ID of the user who has last modified the quote working document.

Last Modified Date

The date on which the quote working document was last modified.

Confirmed by

The login user who confirmed the quote working document.

Confirmed Date

The date on which the quote working document was confirmed.

 

Top

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Assessment tab

This tab enables the commercial representative to assess the Quote Working document. Many pricing models as per the requirement can be added for the given Object-Workscope combination.

Note: This tab is displayed only if the login user is a commercial representative that is personnel who works on the price and quotes.

The commercial role initiates an estimation action against the Object-Workscope which are defaulted from the Sale Contract. The system allows the user to add multiple pricing model against an ‘Object-Workscope’ combination to differentiate the estimates / pricing level and give an option to customer to choose the pricing.

Header Section

Object

Use the drop-down list box to specify the object against which estimation action is to be initiated. The system lists all the object references given in reference document (Bid Contract) against which the Quote working document is created, along with the value 'All'.

By default the system displays 'All' in this field.

Workscope

Use the drop-down list box to specify the workscope against which estimation action is to be initiated. The system lists all the workscope given for the value selected in 'Object' combo in the reference document against which the Quote working document is created, along with value 'All'.

By default the system displays 'All' in this field.

Pricing Model

Use the drop-down list box to specify the pricing model to be added against the Object-Workscope. The system lists all the pricing models for the “Object - Workscope' combination as selected in the Object and Workscope combo, along with the value 'All'.

Tree Grid Multiline section

The system displays the following fields:

Est.

Indicates color coded values representing the status of the estimates.

The system leaves this field blank if the estimates are not initiated.

  • - Indicates the estimation is initiated for the combination but not yet complete

  • - Indicates the estimation for the combination is completed and confirmed.

Qt.

Indicates color coded values representing the status of the quote.

The system leaves this field blank if the estimations are not yet confirmed.

  • - Indicates the estimation is confirmed for the combination but price is not yet defined

  • - Indicates the price working is completed and confirmed against the combination.

Object-WS-Pricing Model

Tree Grid displaying the corresponding Object-Workscope-Pricing Model Combination.

Est. Action

Use the drop-down list box to select the estimation action, which could be any of the following: Mandatory

  •  Estimate

  •  Re-estimate

Est. For

Use the drop-down list box to specify the object for which estimation to be done. Mandatory. The system lists the following options:

  • Both

  • Materials

  • Resources

Est. Remarks

Any comments pertaining to the estimation.

Est. By

Use the drop-down list box to specify the personnel who has to perform the estimation. (Mandatory) You can select from the below options:

  • Others

  • Self

Emp. Code

The code identifyig the employee.

Search facility available.

Est. Level

Use the drop-down list box to select the level at which estimation is done. (Mandatory).

  •  Pricing Model

  •  Work scope

The system displays the following fields:

Obj. Eff. Code

Indicates the respective Part/Aircraft Effectivity code from bid contract at the parent node for the given record.

WS Code

Indicates the respective Work Scope code from bid contract at the child nodes for the given record.

Approval Status

Indicates the Customer Approval status of the object-work scope combination against the Bid Proposal for the Fixed price quoted.

Button Section

Note that you can add pricing model details only for those records which are not yet estimated.

The system displays the color code for the estimation as follows:

Estimate Completed

Estimate Pending

Quotation Completed

Quotation Pending

Rev. Remarks

Any note pertaining to the revision of the estimation.

Note: Ensure that at least one multiline from the Tree Grid is selected.

Note that the system allows saving of details only for those quote working documents that are in other than “Revised or Cancelled” status.

The system performs the following:

  Generates a new Quote Working Document in “Fresh” status when all the Object-Workscope (or) Object-Workscope-Pricing Model combination are dispositioned for estimation.Ø  

The system performs the following:

   Launches a popup to cancel the record with Cancellation Remarks.

Note: Does not allow the user to cancel the previous revision of the Quote Working Document or Quote Working Document that is in “Confirmed” status.

Top

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Working tab page 

In this tab you can add operational task details for a given Workscope task and independently work on cost and price for those tasks.

Tree Section – In this section you can view details of the status of each of the tasks.  

Record Workings Section – In this section you can add details of operational tasks against ‘Object-Workscope-Pricing Model’ combination and enter values of cost and price against the task added.

Note that the system displays details in this tab based on the login user role as given below:

·         Planner: The system retrieves all the Object-Workscope combinations for which assessments are completed against Quote Working document.

·         Commercials: The system retrieves the Object-Workscope combinations for which the estimates are confirmed.

Tree Section

This section enables you to select a specific task from the tree and move that particular task details to the ‘Working’ multiline for further proceedings.

Note: The status of the Tree Grid is based on the Planner/ Commercials Role. For Planner Role, the Tree Grid task status shows estimations and for Commercial Role, it shows status of Quotations.

Tree Grid

Objects - Workscope Section

The system displays the Tree Grid as follows:

Tree Structure:

> Object 1

      > Work scope (or) Work scope-Pricing Model Combination

                 > Operational Task 1

                 > Operational Task 2

                 > Status: The grid displays status of the Task of an object in Quote Working document, which could be any of the following:.

 

Note: Ensure that at least one record is selected in the Tree Grid

Note: Ensure that not more than one Object-Workscope-Pricing Model Combination is selected.

Note: Operational tasks are not selected across Object-Workscope-Pricing Model Combination is selected.

Tree Grid Color Codes

Planner Role

 

Commercial Role

Commercial & Planner Role

 

Status

Color Code

Status

Color Code

Work scope not done

Black

Quote not started

Blue

Estimation not started

Blue

Quote In Progress

Orange

Estimation In Progress

Orange

Quote Completed

Green

Estimation Completed

Green

 

 

Record Workings Section

Header Section

Object

Use the drop-down list box to the object for which record working is to be done. The system lists all the objects from Quote working Document.

Work Scope

Use the drop-down list box to Workscope for which record working is to be done. The system lists all the all the work scopes for object selected from Quote working document.

Pricing Model

Use the drop-down list box to specify the pricing model for which record workings is to be done. The system lists  the corresponding pricing model for values selected in 'Object' and 'Work scope' combo

Note that the system does not display this field if the role of the login user is Planner.

Status

The status of quote working document, which could be any of the following:

  •  Estimate Pending: Indicates that estimations are still pending against the object-work scope-pricing model combination selected.

  •  Estimate Completed: Indicates that estimations are confirmed against the object-work scope-pricing model combination selected (Estimation’s role).

  •  Quotation Pending: Indicates that estimations are completed, and Quotation is still pending for the object-work scope-pricing model combination selected. (Commercial’s Role)

  •  Quotation Completed: Indicates that Quote Workings is confirmed for the object-work scope-pricing model combination.

The system displays the following fields:

Est. Notes

Indicates the corresponding estimation remarks given against the Object-Workscope combination in multiline of Assessment tab.

Est. For

Indicates the corresponding Est. for given against the Object-Worksscope combination in Assessment tab

Quote Remarks

Any remarks against Object-WS-Pricing model combination specified by the  planner/commercial role.

Button Bar Section

Work scope Section

Search By

Use the drop-down list box to specify the basis on which you wish to search and retrieve details in the multiline. The system lists the following options:

·         Task #

·         Total Cost greater Than

·         Total Cost lesser than

By default the system leaves this field blank.

 

In the editable field alongside, specify the value corresponding to the “Search by” selected.

Addl. Search

Use the drop-down list box to select the additional search criteria based on which you wish to retrieve details in the multiline. The system lists the following options for Planner role::

·         Est. Status

·         Est. History

·         NRs Not Estimated

·         Req. Not Avbl.

Note that the system displays the option NRs Not Estimated alone in this field if the login user role is Commercials.

By default the system leaves this field blank.

 

In the adjacent combo control use the drop-down list box to select a value corresponding to the item selected in the ‘Addl. Search’ field. The system lists options as follows for Planner Role:

 If 'Est. Status' is selected in 'Addl. Search':

  • Completed

  • Pending

 If 'Est. History' is selected in 'Addl. Search':

  • Estimation ID which are auto-generated'.

 If 'NRs not estimated' and 'Req. Not Avbl.' is selected in 'Addl. Search

  • Blank.

Note that the system leaves this field blank if the role of the login user is commercials.

Exceptions

Use the drop-down list box to specify the exceptions in cost/price computation against the task details. The system lists the following options:

·         Price < Cost

·         Not Priced Tasks

Note that the system displays this field only if the login user is of Commercial role.

By default the system leaves this field blank.

Note: The system displays the Pricelist Info section only for the Commercial role login user.

Part Pricelist

The number identifying the part pricelist. Data entry in this field is Mandatory if the ‘Part Pricelist’ 'Standard Cost' / 'Standard Purchase Pricelist specified as the Cost From.

Ensure that the value entered in this field is a valid 'Part Pricelist' of type 'Ref. Catalogue' or 'OEM Pricelist' and is not a regular pricelist.

Help facility available.

Service Pricelist

The number identifying the service pricelist.

Help facility available.

The system displays the following fields in the “Task Details” multiline:

ES

Color coded icon based on the status of the estimation of the task.

QS

Color coded icon based on the status of the quote of the task.

In the Price Excp. group, the system displays the following:

M

The estimation status for materials. The system displays the following icon:

  •        - Indicates that estimates are completed for materials and price working is not completed for the task line in Materials section

  •   -  Indicates that both price and estimates are done against the task line in Materials section

By default the system leaves this field blank.

R

The estimation status for materials. The system displays the following:

  •   - Indicates that the estimates are completed for Resources and price working is not completed for the task line in Resources section

  •  - Indicates that both price and estimates are done against the task line in Resources section.

By default the system leaves this field blank.

C

The estimation status for charges. The system displays the following:

  •     - Indicates that the estimates are completed for Charges and price working is not completed for the task line in Charges section.

  •   - Indicates that both price and estimates are done against the task line in Charges section.

By default the system leaves this field blank.

Task #

The number identifying the task.. Mandatory.

Help facility available.

Task Seq. #

The sequence number of the added tasks.

The system displays the following fields:

Task Desc.

A brief textual description of the task.

The system displays the following fields in the “Req. Avbl?” group:

M

Indicates whether the materials is set as required/not required in the task master. The system displays as follows:

  •   -  Indicates that the materials is set as “Required” in the Task master for the task defined in the multiline.

  •  – Indicates that the materials is set as “Not required” in the Task master for the task defined in the multiline.

R

Indicates whether the resources is set as Required/Not required in the task master. The system displays as follows:

  •  - Indicates that the resources is set as “Required” in the Task master for the task defined in the multiline.

  • - Indicates that the resources is set as “Not required” in the Task master for the task defined in the multiline.

The system displays the following fields in the “Defined?” group:

M

Indicates whether the materials is set as required in the task master and defined in material multiline. The system displays as follows:

  • - Indicates that materials is set as required / not required in task master against the task line and defined in Materials multiline.

  •   - Indicates that materials is set as required in task master against the task line and not defined in Materials multiline.

  •  - Indicates that materials is set as not required in task master against the task line and not defined in Materials multiline.

R

Indicates whether the resources is set as required in the task master and defined in resource multiline. The system displays as follows:

  • - Indicates that resources is set as required / not required in task master against the task line and defined in resources multiline.

  • - Indicates that resources is set as required in task master against the task line and not defined in Resources multiline.

  • - Indicates that resources is set as not required in task master against the task line and not defined in Resources multiline.

C

Indicates whether the charges are defined in the Charges multiline. The system displays as follows:

  •   - Indicates that charges is defined in charges multiline.

The system leaves this field blank if Charges are not defined against a task and defined in the Charges tab.

The system displays the following fields in the “Non-Rtn Defined?” group:

M

  • -  Indicates that non-routines are defined against the task line in Materials tab. The system leaves this field blank if non-routines are not defined for a task in the Materials tab.

R

  •   - Indicates that non-routines are defined against the task line in Resources tab

The system leaves this field blank if non-routines are not defined for a task in the Resources.

The system displays the following fields in the “Total Cost” group:

Mat.

Displays the value with entire material cost against the task line by adding column 'Total - Total Cost' in Materials Multiline

Res.

Displays the value with entire resource cost against the task line by adding column 'Total - Total Cost' in Resources multiline

Charges

Displays the value with entire charges cost against the task line by adding column 'Amount' in Charges multiline

Task Lvl. NRs

Any Non-routine tasks against the tasks can be defined against this field.

Ensure that the value entered in this field is a positive integer greater than zero.

The system displays the following fields:

Total

Indicates the sum of 'Materials, Resources, Charges and Task lvl. Non Rtns' column in this column grouping in Work scope multiline.

Est. Remarks

Any notes pertaining to the estimation.

Exclude?

Use the drop-down list box to specify any exclusions against the task line. The system lists the following options:

·         Regular

·         Non-Routines

·         Both

Mark-up %

Any markup that needs to be added against cost of Task Level NR can be specified as percentage.

Ensure that the value entered in this field ranges from 0 to 100.

Value

Mark up Value that should be added against Task Level NR cost can be specified.

The system displays the following fields in the “Computed Price Inclusion” group:

The system displays the following fields with below logic if the parameter 'Adjust the Cost & Price Info based on the Probability Rate?' is set either as “No" (or) "Adjust Task Probability Rates'

Mat.

Sum of the 'Total – Extd. Price Inclusions' column in Materials Multiline.

Res.

Sum of the 'Total - Extd. Price Inclusions' column in Resources Multiline.

Charges

Sum of the 'Total Value' column in Charges Multiline.

Task Lvl. NRs

Addition of 'Mark-up Value' in the 'Mark-up Task Lvl NRs' column group with 'Task Lvl. Non-Rtn.' in 'Total Cost' column group in ‘Work Scope’ Multiline.

Total

Sum of 'Materials, Resources, Charges and Task lvl. NRs' column in this column group.

The system displays the following fields with below logic if the parameter 'Adjust the Cost & Price Info based on the Probability Rate?' is set either as “Adjust for Part probability rate" (or) " Adjust both Task & Part Probability Rates”

Mat.

Sum of the 'Total – Adj. Price Inclusions' column in Materials Multiline.

Res.

Sum of the 'Total - Extd. Price Inclusions' column in Resources Multiline.

Charges

Sum of the 'Total Value' column in Charges Multiline.

Task Lvl. NRs

Addition of 'Mark-up Value' in the 'Mark-up Task Lvl NRs' column group with 'Task Lvl. Non-Rtn.' in 'Total Cost' column group in ‘Work Scope’ Multiline.

Total

Sum of 'Materials, Resources, Charges and Task Lvl. NRs' column in this column group.

The system displays the following fields in the “Total Cost - Inclusion group” group:

The system displays the following with below logic, if the parameter 'Adjust the Cost & Price Info based on the Probability Rate?' is set either as 'Adjust for Part Probability Rate" (or) "Adjust both Task & Part Probability Rates'

Mat.

Sum of the 'Total - Adj. Total Cost Inclusions' column in Materials Multiline

Res.

Sum of 'Total - Total Cost Inclusions' column in Resources Multiline.

Charges

Sum of 'Amount ' column in Charges Multiline.

Task Lvl. NRs

The value from 'Task Lvl. NR column' in the 'Total Cost' column group in Work scope Multiline

Total

Sum of 'Materials, Resources, Charges and Task Lvl. NRs' columns in this column grouping.

The system displays the following with below logic, if the parameter 'Adjust the Cost & Price Info based on the Probability Rate?' is set either as 'No" (or) "Adjust for Task Probability Rates'

Mat.

Sum of the 'Total - Total Cost Inclusions' column in Materials Multiline

Res.

Sum of 'Total - Total Cost Inclusions' column in Resources Multiline.

Charges

Sum of 'Amount ' column in Charges Multiline.

Task Lvl. NRs

The value from 'Task Lvl. NR column' in the 'Total Cost' column group in Work scope Multiline

Total

Sum of 'Materials, Resources, Charges and Task Lvl. NRs' columns in this column grouping.

The system displays the following fields in the “Profit / (Loss) – Inclusion” group:

Mat.

(Materials - Computed Price Inclusions) - (Materials - Total Cost - Inclusions)

Res.

'(Resources - Computed Price Inclusions) - (Resources - Total Cost - Inclusions)

Charges

'(Charges - Computed Price Inclusions) - (Charges - Total Cost - Inclusions)

Task Lvl. NRs

'(Task Lvl. NRs - Computed Price Inclusions) - (Task Lvl. NRs - Total Cost - Inclusions)

Total

Sum of Materials, Resources, Charges and Task Lvl. NRs’ columns in this column grouping

Task Prob. Rate

Probability or happening Rate of the task in multiline can be specified.

Data entry in this field is mandatory if the parameter 'Consider Task. Prob Rate for Price Computation for Quote Working?' is set as 'Yes' in 'Set Sales Process Parameter' screen.

Ensure that the value entered in this field is between the range of 0 to 100 only.

The system displays the following fields in the “Adj. Computed Price Inclusions” only if the parameter 'Adjust the Cost & Price Info based on the Probability Rate?' is set either as 'Adjust Both Tasks & Part Probability Rate' (or) 'Adjust Task Probability Rate':

Mat.

Task Prob. Rate * Materials - Computed Price Inclusions.

Res.

Task Prob. Rate * Resources - Computed Price Inclusions.

Charges

Task Prob. Rate * Charges - Computed Price Inclusions.

Task Lvl. NRs

Task Prob. Rate * Task Lvl. NRs - Computed Price Inclusions.

Total

Sum of 'Materials, Resources, Charges and Task Lvl. NRs' columns in this column grouping.

The system displays the following fields in the “Adj. Cost – Inclusion” group only if the parameter 'Adjust the Cost & Price Info based on the Probability Rate?' is set either as 'Adjust Both Tasks & Part Probability Rate' (or) 'Adjust Task Probability Rate':

Mat.

Task Prob. Rate * Materials - Total Cost Inclusions.

Res.

Task Prob. Rate * Resources - Total Cost Inclusions.

Charges

Task Prob. Rate * Charges - Total Cost Inclusions.

Task Lvl. NRs

Task Prob. Rate * Task Lvl. NRs - Total Cost Inclusions.

Total

Sum of 'Materials, Resources, Charges and Task Lvl. NRs’ columns in this column grouping.

The system displays the following fields in the “Adjusted Profit / (Loss) – Inclusion” group only if the parameter 'Adjust the Cost & Price Info based on the Probability Rate?' is set either as 'Adjust Both Tasks & Part Probability Rate' (or) 'Adjust Task Probability Rate'

Mat.

Task Prob. Rate *  Materials - Profit/ (Loss) Inclusions

Res.

Task Prob. Rate *  Resources - Profit/ (Loss) Inclusions

Charges

Task Prob. Rate *  Charges - Profit/ (Loss) Inclusions

Task Lvl. NRs

Task Prob. Rate *  Task Lvl. NRs - Profit/ (Loss) Inclusions

Total

Sum of 'Materials, Resources, Charges and Task Lvl. NRs' column in this column grouping

The system displays the following fields in the “Exclusions” group:

Total Cost

Sum of Price - Exclusion' in Materials Multiline and 'Price-Exclusion' in Resource Multiline against the task

Total Price

Sum of 'Cost - Exclusion' in Materials Multiline and 'Cost-Exclusion' in Resource Multiline against the task

Profit / (Loss)

Difference between 'Total Price' and 'Total Cost' in this column grouping

Est. Elapsed Time

The estimated elapsed time required for the resource to complete the task

UOM

Use the drop-down list box the unit of measurement. Data selection in this field is mandatory. The system lists the following option:

·         Hours

Est. Mod Notes

Any textual comments on the modifications made to the estimations.

Doc. Mod Notes

Any textual comments on the modifications made to the Quote Working document.

Data entry in this field is mandatory for any task details queued up for re-estimate is modified.

Qt. Working Notes

A brief textual description of the Quote Workings.

Remarks

Any comments pertaining to the Quote Workings.

The system displays the following fields in the “Summary” section:

Note: The system displays this section only if the login user is in Planner role.

Note: The system displays the total number of skill hours estimated against the Object-Work Scope – Pricing Model combination in the top right corner in the Summary section.

Materials

Cost: Indicates the sum of values in column 'Materials - Total Cost' in Work scope tab against all the tasks for selected Object - WS Combination.

Resources

Cost: Indicates the sum of values in column 'Resources - Total Cost' in Work scope tab against all the tasks for selected Object - WS Combination.

Charges

Cost: Indicates the sum of values in column 'Charges - Total Cost' in Work scope tab against all the tasks for selected Object - WS Combination.

Task Lvl. NRs

Cost: Indicates the sum of values in column 'Task Lvl. NRs. - Total Cost' in Work scope tab against all the tasks for selected Object - WS Combination.

Total

Cost: Indicates the sum of values of 'Materials', 'Resources', 'Charges' and 'Non-Routines' which are derived in Cost summary.

The system displays the following fields in the “Summary” section

Note: The system displays this section only if the login user is in Commercial role.

If the 'Adjust the Cost & Price Info based on the Probability Rate?' is set as 'Adjust Task Probability Rate' or 'Adjust both Task & Part Probability Rates'

Materials

Cost: Displays the added values in column 'Materials - Adj. Cost Inclusions' in Workscope multiline against all the tasks for selected Object – Workscope combination.

Price: Displays the added values in column 'Materials - Adj. Computed Price Inclusions' in Workscope multiline against all the tasks for selected Object – Workscope combination.

Resources

Cost: Displays the added values in column 'Resources - Adj. Cost Inclusions' in Workscope multiline against all the tasks for selected Object – Workscope combination.

Price: Displays the added values in column 'Resources - Adj. Computed Price Inclusions' in Workscope multiline against all the tasks for selected Object – Workscope combination

Charges

Cost: Displays added values in column 'Charges - Adj. Cost Inclusions' in Workscope multiline against all the tasks for selected Object – Workscope combination

Price: Displays added values in column 'Charges - Adj. Computed Price Inclusions' in Workscope multiline against all the tasks for selected Object – Workscope combination

Non-Routines

Cost: Displays added adding the values in column 'Task Lvl. NRs. - Adj. Cost Inclusions' in Workscope multiline against all the tasks for selected Object – Workscope combination.

Price: Displays the added the values in column 'Task Lvl. NRs - Adj. Computed Price Inclusions' in Workscope multiline against all the tasks for selected Object – Workscope combination

Total

Cost: Displays the added values of 'Materials', 'Resources', 'Charges' and 'Non-Routines' which are derived against the control of Cost in summary.

Price: Displays the added values of 'Materials', 'Resources', 'Charges' and 'Non-Routines' which are derived against the control of Price in summary.

The system displays the following fields in the “Summary” section if parameter 'Adjust the Cost & Price Info based on the Probability Rate?' is set as 'No' or 'Adjust Part Probability Rates')

Materials

Cost: Displays the added values in column 'Materials - Total Cost Inclusions' in Workscope multiline against all the tasks for selected Object – Workscope combination

Price: Displays the added values in column 'Materials - Computed Price Inclusions' in Workscope multiline against all the tasks for selected Object – Workscope combination.

Resources

Cost: Displays the added values in column 'Resources - Total Cost Inclusions' in Workscope multiline against all the tasks for selected Object – Workscope combination

Price: Displays the added values in column 'Resources - Computed Price Inclusions' in Workscope multiline against all the tasks for selected Object – Workscope combination

Charges

Cost: Displays the added values in column 'Charges - Total Cost Inclusions' in Workscope multiline against all the tasks for selected Object – Workscope combination.

Price: Displays the added values in column 'Charges - Computed Price Inclusions' in Workscope multiline against all the tasks for selected Object – Workscope combination

Non-Routines

Cost: Displays the added values in column 'Task Lvl. NRs. - Total Cost Inclusions' in Workscope multiline against all the tasks for selected Object – Workscope combination.

Price: Displays the added values in column 'Task Lvl. NRs - Computed Price Inclusions' in Workscope multiline against all the tasks for selected Object – Workscope combination

Total

Cost: Displays the added values of 'Materials', 'Resources', 'Charges' and 'Non-Routines' which are derived against the control of Cost in summary.

  >> Price: Displays the added values of ('Materials', 'Resources', 'Charges' and 'Non-Routines' which are derived against the control of Price in summary.

Key Links

Use the drop-down list box to select the key links to navigate to various screen from Quote Working document.

  • Upload Tasks

  •  View Non-Routine History

Save Action

Use the drop-down list box to select the action to be saved. The system lists the following options for login user with both Planner and Commercial roles:

·         Est. Not Reqd.

·         Clear Price Exceptions

The system lists the option ‘Clear Price Exceptions’ only if the login user has a Commercial role.

Note: Ensure that at least one record is selected in the multiline if pricing exception is specified against the task.

Top

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Materials section

Search By

Use the drop-down list box to specify the basis on which you wish to retrieve details in the multiline. The system lists the following options:

·         Task #

·         Cost per unit greater Than

·         Total Cost greater than

·         Price per unit greater than

·         Mark up per unit greater than

·         Extd. price greater than

·         Part #

By default the system leaves this field blank.

 

In the editable field alongside, specify the value corresponding to the “Search by” selected.

Addl. Search

Use the drop-down list box to select additional search criteria based on which you wish to retrieve details in the multiline. The system lists the following options:

·         NRs Not Estimated

·         Est. Status

·         Est. History

·         Stock Status

By default the system leaves this field blank.

 

In the additional combo control, use the drop-down list box to select the additional search criteria based on which you wish to retrieve details in the multiline. The system lists options as follows :

  • If 'Stock Status” is specified in the 'Addl. Search', system lists all the active user defined stock status available in the system

Exceptions

Use the drop-down list box to specify the exceptions in Materials multiline. The system lists the following options:

·         Price < Cost

·         Est. Qty < Req. Qty

·         NR Est. < Act Qty

Cost From                 

Use the drop-down list box to specify the source from where the cost of the part is to be taken. You can select from the following options:

  • Part Pricelist

  • Standard Cost

  • Standard Purchase Price

By default the system leaves this field blank.

 

In the editable field alongside, enter the value corresponding to the ‘Part Pricelist #” specified.

Help facility available

The system displays the following field:

ES

Indicates the status of the estimation for materials which could be any of the following:

  • - Pending

  • -  Completed

QS

Indicates the status of the quote for the materials, which could be either of the following:

  •  - Pending

  • - Completed

Task #

The number identifying the task for which material estimation is done. Mandatory.

Help facility available

Task Seq. #

The number identifying the sequence of the task for which material estimation is to be done.

Part #

The number identifying the part for which estimation is done. Mandatory.

Help facility available

UOM

Use the drop-down list box to specify the unit of measurement. Mandatory.

The system displays the following field:

Req. Qty

The quantity of material required for the task based on the task master.

NR Qty. – Act.

The quantity of the actual non-routine parts for the given task based on previous history.

Reg.

Quantity of part which is required for estimation on a regular basis.  

Ensure that the value entered in this field is a positive integer greater than 0.

Non-Rtn.

Quantity of part that is not planned for regular basis but as non-routines based on consumption history, which is required for estimation.

Ensure that the value entered in this field is a positive integer greater than 0.

The system displays the following field:

Total

Regular - Est. Qty + Non Routine - Est. Qty'

Stock Status

Use the drop-down list box to specify the stock status. The system lists all the active stock statuses as defined in the “View User Defined Stock Status” activity of the “User Defined Stock Status” business component.

Part Condition

Use the drop-down list box to select the condition of the part which is to be estimated. The system lists the following options:

  •  New

  •  Overhauled

  •  Serviceable

  •  Unserviceable

By default the system leaves this field blank.

Cost / Unit

The cost per unit of part.

The system displays the following fields in the “Total Cost” group:

Reg.

Regular - Est. Qty * Cost per Unit

Non Rtn.

Non Routine - Est. Qty * Cost per unit

Total

Regular - Total Cost + Non Routine - Total Cost

Exclude?

Use the drop-down list box to select exclusions in the material multiline. The system lists the following values:

  • Regular

  • Non-Routines

  • Both

By default the system leaves this field blank.

Base Rate / Unit

The base rate per unit for the part.

Percentage

Any markup that needs to be added against Base Rate/Unit can be specified as percentage.

Ensure that the value entered in this field ranges from 0 to 100.

Value

Base Rate/Unit * (Mark up % / 100)'

The system displays the following field:

Price / Unit

Base Rate/Unit + Mark-up Value

The system displays the following fields in the “Extd. Base Price - Inclusions” group:

Reg.

Regular - Est. Qty * Base Rate/Unit'

Non Rtn.

Non Routine - Est. Qty * Base Rate/Unit

Total

Regular - Extd. Base Price + Non Routine - Extd. Base Price

The system displays the following fields in the “Extd. Mark Up - Inclusions” group:

Reg.

Regular - Est. Qty * Mark-up Value

Non Rtn.

Non Routine - Est. Qty * Mark-up Value

Total

Regular - Extd. Mark-up + Non Routine - Extd. Mark-up

The system displays the following fields in the “Extd. Price - Inclusions” group:

Reg.

Regular - Est. Qty * Price per unit' (or) 'Regular - Extd. base Price + Regular - Extd. Mark-up

Non Rtn.

Non Routine - Est. Qty * Price per unit' (or) 'Non Routine - Extd. base Price + Non Routine - Extd. Mark-up

Total

Regular - Extd. Price + Non Routine - Extd. Price

The system displays the following fields in the “Total Cost - Inclusions” group:

Reg.

Regular - Total Cost' from Materials multiline, if Exclude is not set as 'Regular' or 'Both'

Non Rtn.

Non Routine - Total Cost' from Materials multiline, if Exclude is not set as 'Non-routine' or 'Both'

Total

Regular - Total Cost Inclusions + Non-Routines - Total Cost Inclusions

The system displays the following fields in the “Profit / (Loss) - Inclusions” group:

Reg.

(Regular - Extd. Price Inclusions) - (Regular - Total Cost Inclusions)'

Non Rtn.

(Non Routine - Extd. Price Inclusions) - (Non Routine -   Total Cost Inclusions)

Total

(Total - Extd. Price Inclusions) - (Total - Total Cost Inclusions)

The system displays the following fields in the “Adj. Price - Inclusions grouping” only if the parameter 'Adjust the Cost & Price Info based on the Probability Rate?' is set either as 'Adjust Both Tasks & Part Probability Rate' (or) 'Adjust Part Probability Rate':

Reg.

(Reqd. Probability /100)* Regular – Extd. Price Inclusions

 

Non Rtn.

(Reqd. Probability /100) * Non Routine – Extd. Price Inclusions'

 

Total

(Reqd. Probability /100)* Total – Extd. Price Inclusions

 

The system displays the following fields in the “Adj. Total Cost - Inclusions grouping” only if the parameter 'Adjust the Cost & Price Info based on the Probability Rate?' is set either as 'Adjust Both Tasks & Part Probability Rate' (or) 'Adjust Part Probability Rate':

Reg.

(Reqd. Probability /100)* Regular - Total Cost Inclusions

Non Rtn.

(Reqd. Probability /100) * Non Routine - Total Cost Inclusions'

Total

(Reqd. Probability /100)* Total - Total Cost Inclusions

The system displays the following fields in the “Adj. Profit/(Loss) - Inclusions grouping” only if the parameter 'Adjust the Cost & Price Info based on the Probability Rate?' is set either as 'Adjust Both Tasks & Part Probability Rate' (or) 'Adjust Part Probability Rate':

Reg.

(Reqd. Probability /100)* Regular – Profit/(Loss) Inclusions

Non Rtn.

(Reqd. Probability /100) * Non Routine - Profit/(Loss) Inclusions

Total

(Reqd. Probability /100)* Total - Profit/(Loss) Inclusions

Est. Remarks

Any comment pertaining to the material estimations.

The system displays the following fields in the “Exclusions” group:

Price

Sum of all Extd. Price in both Regular as well as Non Routines whichever are excluded.

Cost

Sum of all Total Cost in both Regular as well as Non Routines whichever are excluded.

Profit

(Price-Exclusions) - (Cost-Exclusions).

Est. Notes

A brief textual note on the estimation of materials

Qt. Working Notes

A brief textual note on the Quote Working document.

The system displays the following fields:

PMA?

Indicates whether the part is a PMA part, which could be ‘Yes’ or ‘No’.

Part Type

The type of part as in the Part master.

Part Class

The classification to which the part belongs as in the Part master.

Task Desc.

A brief textual note on the task that is added.

Part Desc.

A brief description of the part specified as defined in the Part master.

Est. Mod. Notes

A textual note on the modifications made in estimation of materials in the Quote Working document.

Doc. Mod. Notes

A textual note on the modifications in price of materials made in the Quote Working document.

The system displays the following fields:

Base Rate PPL Curr.

If any part pricelist is used to define the base rate/unit for materials, then display the corresponding currency of part from that pricelist.

The system displays the following fields in the “Cost Summary” section:

Note: The system displays this section only if the login user is in Planner role.

Regular

Cost: Displays the added value of the Regular' column under the 'Total Cost' column grouping for all the tasks lines, for the given 'Object-Workscope-Pricing Model' combination

Non-Routines

Cost: Displays the added value of the “Non Routine' column under the 'Total Cost' column grouping for all the tasks lines, for the given 'Object- Workscope -Pricing Model' combination

Total

Cost: Displays the added value of 'Total' column under the 'Total Cost' column grouping for all the tasks lines, for the given 'Object- Workscope -Pricing Model' combination

The system displays the following fields in the “Summary” section if parameter 'Adjust the Cost & Price Info based on the Probability Rate?' is set as 'Adjust Part Probability Rate' or 'Adjust both Task & Part Probability Rates':

Note: The system displays this section only if the login user is in Commercial role.

Regular

Price: Displays the value by adding 'Regular' column under the 'Adj. Price Inclusions' column grouping for all the tasks line items for the given 'Object- Workscope -Pricing Model' combination

Cost: Displays the value by adding 'Regular' column under the 'Total Cost' column grouping for all the tasks line items, for the given 'Object- Workscope -Pricing Model' combination

Non-Routine

Price: Displays the value by adding 'Non-Routine' column under the 'Adj. Price Inclusions' column grouping for all the tasks line items, for the given 'Object-Work scope-Pricing Model' combination

Cost: Displays the value by adding 'Non Routine' column under the 'Total Cost' column grouping for all the tasks line items, for the given 'Object- Workscope -Pricing Model' combination

Total

Cost: Displays the value by adding 'Total' column under the 'Total Cost' column grouping for all the tasks line items, for the given 'Object- Workscope -Pricing Model' combination

Price: Display the value by adding 'Total' column under the 'Adj. Price Inclusions' column grouping for all the tasks line items, for the given 'Object- Workscope -Pricing Model' combination

The system displays the following fields in the “Summary” section if parameter 'Adjust the Cost & Price Info based on the Probability Rate?' is set as 'No' or 'Adjust Task Probability Rates

Note: The system displays this section only if the login user is in Commercial role.

Regular

Price: Displays the value by adding 'Regular' column under the 'Extd. Price Inclusions' column grouping for all the tasks line items, for the given 'Object- Workscope -Pricing Model' combination

Cost: Display the value by adding 'Regular' column under the 'Total Cost Inclusions' column grouping for all the tasks line items, for the given 'Object- Workscope -Pricing Model' combination

Non-Routine

Price: Display the value by adding 'Non-Routine' column under the 'Extd. Price Inclusions' column grouping for all the tasks line items, for the given 'Object- Workscope -Pricing Model' combination

Cost: Display the value by adding 'Non Routine' column under the 'Total Cost Inclusions' column grouping for all the tasks line items, for the given 'Object- Workscope -Pricing Model' combination

Total

Price: Display the value by adding 'Total' column under the 'Extd. Price Inclusions' column grouping for all the tasks line items, for the given 'Object- Workscope -Pricing Model' combination

Cost: Display the value by adding 'Total' column under the 'Total Cost Inclusions' column grouping for all the tasks line items, for the given 'Object- Workscope Work scope-Pricing Model' combination

Note: Ensure that at least one record in the multiline is selected.

Note: Ensure that the Quote Working document is in status other than ‘Confirmed’, ‘Cancelled’ or ‘Revised’.

Top

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Resources Section

Search By

Use the drop-down list box to specify the basis on which you wish to retrieve details in the multiline. The system lists the following options:

·    Task #

·         Res. #

·         Cost per unit greater Than

·         Total Cost greater than

·         Price per unit greater than

·         Mark up per unit greater than

·         Extd. price greater than

By default the system leaves this field blank.

 

In the editable field alongside, enter a value corresponding to the ‘Search by’ specified.

Addl. Search

Use the drop-down list box to select the basis on which you wish to search and retrieve details in the multiline. The system lists the following options:

·         NRs Not Estimated

·         Attendance Type

·         Res. Type

·         Est. Status

·         Est. History

By default the system leaves this field blank.

 

In the adjacent combo control use the drop-down list box to select a value corresponding to the item selected in the ‘Addl. Search’ field. The system lists options as follows

·         If 'Est. Status' is selected in 'Addl. Search':

·         Completed

·         Pending

·         If 'Est. History' is selected in 'Addl. Search':

·         Estimation ID which are auto-generated during re-estimate.

·         If ‘Res. Type’ is selected in the ‘Addl. Search’:

  • All resource types

·         If 'Attendance Type is selected in the 'Addl. Search”

  • All Attendance types.

If “NRs Not Estimated’ is selected in ‘Addl. Search’, then load the value as ‘Blank’

Exceptions

Use the drop-down list box to filter the exceptions in the Resources Multiline. The system lists the following options:

·         Price < Cost

·         Est. Qty < Req. Qty

·         NR Est. < Act Qty

Cost From                 

Use the drop-down list box to specify the source from where the cost of the resource is to be taken. You can select from the following options:

§  Service Pricelist

By default the system leaves this field blank.

 

In the editable field alongside, enter the value corresponding to the ‘Service Pricelist’ is specified.

Help facility available

The system displays the following field:

ES

Indicates the status of the estimation of resources for the tasks which could be any of the following:

  •  – Pending

  •  - Completed

The system displays the following field:

QS

Indicates the status of the quote of resources  for the task, which could be either of the following:

  • – Pending

  • - Completed

Task #

The number identifying the task for which resource estimation is done. Mandatory.

Help facility available

Task Seq. #

The number identifying the sequence of the task for which resource estimation is to be done.

Res. Type

Use the drop-down list box to specify the type of resource for which estimation is to be done. The system lists the following options:

  • Skills

  •  Tools

  •  Equipment

  • Others

Res. Nos.

The required number of resources as per the Task master. Mandatory.

Search facility available.

Time UOM

Use the drop-down list box to specify the unit of measurement for the resource to be estimated. Mandatory. The system lists the following option:

  • Hours

By default the system leaves this field blank.

The system displays the following field:

Reqd. Qty

Indicates the required quantity of resources as in the Task master.

NR Qty – Act.

Indicates the non-routine number of resources for given combination of 'Object-Work scope' and 'Task - Part' combination.

Reg.

Quantity of resource hours which is required  for estimation on a regular basis

Ensure that the value entered in this field is a positive integer greater than 0.

Non-Rtn

Quantity of resource hours that is not planned for regular basis but as non-routines based on consumption history, which is required for estimation.

Ensure that the value entered in this field is a positive integer greater than 0.

The system displays the following field in the “Est. Qty” group:

Total

The total estimated quantity.

Regular - Est. Qty + Non Routine - Est. Qty

The system displays the following field:

Reqd. Nos

Indicates the count of resources required to perform the task from task master.

Est. Nos

Indicates the estimated count of resources to perform the tasks,

Attendance Type

Use the drop-down list box the type of attendance for the resource for which estimation is to be done. Mandatory.

  • Normal Time

  • Overtime

  • Regular Time

By default the system leaves this field blank.

Cost / Unit

The cost per unit of resources for the given 'Object-Workscope' combination.

The system displays the following fields in the “Total Cost” group:

Reg.

Regular - Est. Qty * Cost per Unit * Est. Nos

Non Rtn.

Non Routine - Est. Qty * Cost per unit *Est. Nos'

Total

Regular - Total Cost + Non Routine - Total Cost

Exclude?

Use the drop-down list box to

  • Regular

  • Non-Routines

  • Both

Base Rate / Unit

Indicates Base Rate per unit of resources for the given 'Object-Workscope' combination

Percentage

Any markup that needs to be added against Base Rate/Unit can be specified as percentage.

Ensure that the value entered in this field ranges from 0 to 100.

Value

Base Rate/Unit * (Mark up % / 100)'

The system displays the following field:

Price / Unit

Base Rate/Unit + Mark-up Value'

The system displays the following fields in the “Extd. Base Price - Inclusions” group:

Reg.

Regular - Est. Qty * Base Rate/Unit * Est. Nos.

Non Rtn.

Non Routine - Est. Qty * Base Rate/Unit * Est. Nos

Total

Regular - Extd. Base Price + Non Routine - Extd. Base Price

The system displays the following fields in the “Extd. Mark Up - Inclusions” group:

Reg.

Regular - Est. Qty * Mark-up Value * Est. Nos

Non Rtn.

Non Routine - Est. Qty * Mark-up Value * Est. Nos.

Total

Regular - Extd. Mark-up + Non Routine - Extd. Mark-up

The system displays the following fields in the “Extd. Price - Inclusions” group:

Reg.

Regular - Est. Qty * Price per unit * Est. Nos. (or) 'Regular - Extd. base Price + Regular - Extd. Mark-up

Non Rtn.

Non Routine - Est. Qty * Price per unit * Est. Nos' (or) 'Non Routine - Extd. base Price + Non Routine - Extd. Mark-up

Total

Regular - Extd. Price Inclusions + Non Routine - Extd. Price Inclusions

The system displays the following fields in the “Total Cost - Inclusions” group:

Reg.

Regular - Total Cost' from Resources multiline, if Exclude is not set as 'Regular' or 'Both'

Non Rtn.

Non Routine - Total Cost' from Resources multiline, if Exclude is not set as 'Non-routine' or 'Both'

Total

Regular - Total Cost Inclusions + Non-Routines - Total Cost Inclusions

The system displays the following fields in the “Profit / (Loss) - Inclusions” group:

Reg.

(Regular - Extd. Price Inclusions) - (Regular - Total Cost Inclusions)'

Non Rtn.

(Non Routine - Extd. Price Inclusions) - (Non Routine - Total Cost Inclusions)

Total

(Total - Extd. Price Inclusions) - (Total - Total Cost Inclusions)

Est. Remarks

Any comment pertaining to the resources estimations.

Qt. Working Remarks

Any comment pertaining to the price workings of resources.

The system displays the following fields in the “Exclusions” group:

Price

Sum of all Extd. Price in both Regular as well as Non Routines whichever are excluded'

Cost

'Sum of all Total Cost in both Regular as well as Non Routines whichever are excluded'

Profit

'(Price-Exclusions) - (Cost-Exclusions)

Est. Notes

A textual comment on the resource estimations.

Qr. Working Notes

A brief textual note on the Quote Working document.

The system displays the following fields:

Task Desc.

A brief textual note on the task that is added.

Res. Desc.

A brief description of the resources specified as defined in the Task master.

Est. Mod Notes

Any textual comments on the modifications made to the estimations.

Doc. Mod Notes

A textual note on the modifications made in the Quote Working document.

The system displays the following fields:

Base Rate SPL Curr.

If any service pricelist is used to define the base rate/unit for resources, then display the corresponding currency of part from that pricelist.

The system displays the following fields in the “Cost Summary” section:

Note: The system displays this section only if the login user is in Planner role.

Regular

Cost: Displays the added value of 'Regular' column under the 'Total Cost' column grouping for all the tasks lines, for the given 'Object-Workscope-Pricing Model' combination

Non-Routines

Cost: Displays the added value of 'Non Routine' column under the 'Total Cost' column grouping for all the tasks lines, for the given 'Object- Workscope -Pricing Model' combination

Total

Cost: Displays the added value of 'Total' column under the 'Total Cost' column grouping for all the tasks lines, for the given 'Object- Workscope -Pricing Model' combination

The system displays the following fields in the “Summary” sectio:

Note: The system displays this section only if the login user is in Commercial role.

Regular

Cost: Displays the added values of adding 'Regular' column under the 'Total Cost Inclusions' column grouping for all the tasks line items, for the given 'Object- Workscope -Pricing Model' combination

Price: Displays the added values of 'Regular' column under the 'Extd. Price Inclusions' column grouping for all the task line items, for the given 'Object- Workscope -Pricing Model' combination

Non-Routine

Cost: Displays the added values of “Non-Routine' column under the 'Total Cost Inclusions' column grouping for all the task line items, for the given 'Object- Workscope -Pricing Model' combination

Price: Displays the added values of “Non-Routine' column under the 'Extd. Price Inclusions' column grouping for all the task line items, for the given 'Object- Workscope -Pricing Model' combination

Total

Cost: Display the added values of 'Total' column under the 'Total Cost Inclusions' column grouping for all the task line items, for the given 'Object- Workscope -Pricing Model' combination

Price: Displays the added values of 'Total' column under the 'Extd. Price Inclusions' column grouping for all the task line items, for the given 'Object- Workscope -Pricing Model' combination.

Note: Ensure that at least one record in the multiline is selected.

Note: Ensure that at least one record is selected on the multiline.

Note that for both Planner and Commercial Roles ensure that estimates is Completed and Confirmed against a task.

Top

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Charges Section

This section enables you to record estimates and price workings for charges against a Quote Working Document, which will then be considered for computing the final fixed price.

Task #

The number identifying the task for which charges estimation is done. Mandatory.

Help facility available

Task Seq. #

The number identifying the sequence of the task for which charges estimation is to be done.

Charge Code

The code identifying the charges applied against a Task #.

 

Help facility available

The system displays the following fields in the “Charge Details” multiline:

Charge Desc.

A textual note on the corresponding charge code.

 

Variant Code

The code identifying the variance of the corresponding charge code that is applied against a Task #.

Help facility available

The system displays the following fields in the “Charge Details” multiline:

Variant Desc.

A textual note on the corresponding variant code.

Amount

The amount charged against the task for the corresponding Charge Code

Percentage

The Markup % to be added on the Charge amount.

Value

 The Mark-up value added to the Charge amount calculated based on applying the Markup % on the amount.

The system displays the following fields in the “Charge Details” multiline:

Total Value

 It displays the total value of the Charge applied against the task calculated as Amount + Mark-Up value.

 Note: Only the Charge Codes with Flat Basis Charge Type can be applied against a Task # in this tab.

The system displays the following fields in the “Summary” section:

 Note: The system displays only ‘Cost’ in this section only if the login user is in Planner role

 It displays Cost, Markup and Value if the login user is mapped to a commercial role..

Cost

The sum of all the amount charged for the task for the given object-work scope combination.

Markup

The sum of all the markup values added to the Charge amount for the object-work scope combination.

Value

The sum of all the charges applied against the task for the object-work scope combination.

Top

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Summary tab page 

This tab enables you to have the visibility of Cost and Price Summary separately at Task / Material / Resources / Charges level for an ‘Object-Workscope-Pricing Model' combination. In this tab, you can to review the cost/Prices in the screen

!    Note: The system does not display this tab for login user who is a Planner.

The system displays the following in the “Overall Price Summary” section:

Computed Price

Indicates the total computed price workings for a given Object-Workscope-Pricing Model combination. The system displays the following:

  • Regular - (Sum of values in 'Materials' Column + Sum of values in 'Resources' Column + Sum of all values in 'Charges' Column under 'Computed Price - Inclusions' column grouping in Object wise summary multiline

  • Non-Routine - Sum of values in 'Task Level. NRs' Column + Sum of values in 'Obj. Level NRs' Column under 'Computed Price - Inclusions' column grouping in Object wise summary multiline

  • Inclusions - Sum of values in 'Total' Column under 'Computed Price - Inclusions' column grouping in Object wise summary multiline.

  • Exclusions - Sum of values in 'Price' Column under 'Exclusions' column grouping in Object wise summary multiline

Total Cost

 Indicates the total cost for a given Object-Workscope-Pricing Model combination. The system displays the following:

  • Routines: Sum of values in 'Materials' Column + Sum of values in 'Resources' Column + Sum of all values in 'Charges' Column under 'Total Cost - Inclusions' column grouping in Object wise summary multiline.

  • Non-Routine - Sum of values in 'Task Level. NRs' Column + Sum of values in 'Obj. Level NRs' Column under 'Total Cost - Inclusions' column grouping in Object wise summary multiline

  • Inclusions - Sum of values in 'Total' Column under 'Total Cost - Inclusions' column grouping in Object wise summary multiline.

  • Exclusions - Sum of values in 'Cost' Column under 'Exclusions' column grouping in Object wise summary multiline.

Profit

Indicates the total profit for all the Object-Workscope-Pricing Model combination. The system displays the following:

  • Regular - Value against 'Regular' in Computed Price card - Value against 'Regular' in Total Cost card.

  • Non-Routine - Value against 'Non-Routine' in Computed Price card - Value against 'Non-Routine' in Total Cost card

  • Inclusions - Value against 'Inclusions' in Computed Price card - Value against 'Inclusions' in Total Cost card

  • Exclusions - Value against 'Exclusions' in Computed Price card - Value against 'Exclusions' in Total Cost card

Object – Workscope Pricing Model            

The Tree grid displayed as follows:

Parent node – The Object

Child node – Workscope – Pricing Model combination under the Object

 

The system displays the following in the “Computed Price – Inclusions” group if the parameter 'Consider Task. Prob Rate for Price Computation for Quote Working?' is set at any option other than ‘No’:

Materials

Sum of values in Column 'Materials' under 'Adj. Computed Price Inclusions in Workscope multiline

Resources

Sum of values in Column 'Resources' under 'Adj. Computed Price Inclusions' in Workscope multiline

Charges

Sum of values in Column 'Charges' under 'Adj. Computed Price Inclusions’ in Workscope multiline

Task Lvl. NRs

Sum of values in Column 'Task Level. NRs' under 'Adj. Computed Price Inclusions’ in Workscope multiline

Object Lvl. NRs

Object Level Non- Routine Price defined for that Object-Workscope-Pricing Model combination

Total

Sum of Materials, Resources, Charges, Task Lvl. NRs and Object Lvl. NRs under this column grouping

The system displays the following in the “Computed Price – Inclusions” group if the parameter 'Consider Task. Prob Rate for Price Computation for Quote Working?' is set as 'No':

Materials

Sum of values in Column 'Materials' under 'Computed Price Inclusions’ in Workscope Multiline

Resources

Sum of values in Column 'Resources' under 'Computed Price Inclusions’ in Workscope Multiline

Charges

Sum of values in Column 'Charges' under 'Computed Price Inclusions’ in Workscope Multiline

Task Lvl. NRs

Sum of values in Column 'Task Level. NRs' under 'Computed Price Inclusions’ in Workscope Multiline

Object Lvl. NRs

Object Level Non- Routine Price defined for that Object-Workscope-Pricing Model combination

Total

Sum of Materials, Resources, Charges, Task Lvl. NRs and Object Lvl. NRs under this column grouping

The system displays the following in the “Total Cost – Inclusions” group if the parameter 'Consider Task. Prob Rate for Price Computation for Quote Working?' is set at any other option other than ‘No’:

Materials

Sum of values in Column 'Materials' under 'Adj. Cost Inclusions’ in Workscope Multiline

Resources

Sum of values in Column 'Resources' under 'Adj. Cost Inclusions’ in Workscope Multiline

Charges

Sum of values in Column 'Charges' under 'Adj. Cost Inclusions’ in Workscope Multiline

Task Lvl. NRs

Sum of values in Column 'Task Level. NRs' under 'Adj. Cost Inclusions’ in Workscope Multiline

Object Lvl. NRs

Object Level Non- Routine Cost defined for that Object-Workscope-Pricing Model combination

Total

Sum of Materials, Resources, Charges, Task Lvl. NRs and Object Lvl. NRs under this column grouping

The system displays the following in the “Total Cost – Inclusions” group if the parameter 'Consider Task. Prob Rate for Price Computation for Quote Working?' is set as 'No':

Materials

Sum of values in Column 'Materials' under 'Total Cost Inclusions’ in Workscope Multiline

Resources

'Sum of values in Column 'Resources' under 'Total Cost Inclusions’ in Workscope Multiline

Charges

Sum of values in Column 'Charges’ under ‘Total Cost Inclusions’ in Workscope Multiline

Task Lvl. NRs

Sum of values in Column 'Task Level. NRs’ under ‘Total Cost Inclusions’ in Workscope Multiline

Object Lvl. NRs

Object Level Non- Routine Cost defined for that Object-Workscope-Pricing Model combination

Total

Sum of Materials, Resources, Charges, Task Lvl. NRs and Object Lvl. NRs under this column grouping

The system displays the following in the “Profit / Loss” - Inclusions” group if the parameter 'Consider Task. Prob Rate for Price Computation for Quote Working?' is set any other option other than ‘No’:

Materials

Sum of values in Column 'Materials' under 'Adj. Profit / (Loss) Inclusions’ in Workscope Multiline

Resources

'Sum of values in Column 'Resources' under 'Adj. Profit / (Loss) Inclusions’ in Workscope Multiline

Charges

Sum of values in Column ‘Charges’ under 'Adj. Profit / (Loss) Inclusions’ in Workscope Multiline

Task Lvl. NRs

Sum of values in Column “Task Lvl. NRs’ under 'Adj. Profit / (Loss) Inclusions’ in Workscope Multiline

Object Lvl. NRs

Value in Obj. Level NRs in Computed Price Inclusions - Value in Obj. Level NRs in Total Cost Inclusions

Total

Sum of Materials, Resources, Charges, Task Lvl. NRs and Object Lvl. NRs under this column grouping

The system displays the following in the “Profit / Loss” - Inclusions” group if the parameter 'Consider Task. Prob Rate for Price Computation for Quote Working?' is set as 'No':

Materials

Sum of values in Column 'Materials' under 'Profit / (Loss) Inclusions’ in Workscope Multiline

Resources

Sum of values in Column 'Resources' under 'Profit / (Loss) Inclusions’ in Workscope Multiline

Charges

Sum of values in Column 'Charges' under 'Profit / (Loss) Inclusions’ in Workscope Multiline

Task Lvl. NRs

Sum of values in Column ‘Task Lvl. NRs’ under 'Profit / (Loss) Inclusions’ in Workscope Multiline

Object Lvl. NRs

Value in Obj. Level NRs in Computed Price Inclusions - Value in Obj. Level NRs in Total Cost Inclusions

Total

Sum of Materials, Resources, Charges, Task Lvl. NRs and Object Lvl. NRs under this column grouping

FP Defn. For              

Use the drop-down list box to select the Fixed price definition. The system lists the following options: (Mandatory)

·         Labour

·         Material

·         Other Resources

·         Tasks

By default the system leaves this field blank.

Incl. Pricing Basis

Use the drop-down list box to inclusion pricing basis. Mandatory.

·         Fixed Price by WU'

By default the system leaves this field blank.

Materials

Total Value for Materials to be updated as Final price

Others

Total Value for Others to be updated as Final price

Resources

Total Value for Resources to be updated as Final price

Total

Total Value for ‘Object-Workscope-Pricing Model’ combination to be updated as Final price

The system displays the following in the “Exclusions” group:

Price

Sum of values in Column 'Total Price' under 'Exclusions' in Workscope Multiline

Cost

Sum of values in Column 'Total Cost' under 'Exclusions’ in Workscope Multiline

Profit / Loss

'Sum of values in Column 'Profit / (Loss)' under 'Exclusions’ in Workscope Multiline

The system displays the following in the “Final Profit” group:

Materials

Indicates the profit of materials based on difference between Material columns under Final Price and Computed price Inclusion sections.

Resources

The Final Profit of Resources based on difference between Resource columns under Final Price and Computed price Inclusion sections

Total

The Total Final Profit based on the difference between Total columns under Final Price and Computed Price sections.

Others

Indicates the final profit of others based on difference between other columns under final price and computed price Inclusion sections.

Note that this field includes Sum of charges, Task Level NRs, Obj. Level NRs.

Note: Ensure that at least one record in the multiline is selected.

Note: Ensure that the Quote Working document is in Confirmed status only if you wish to update FP to Ref. Doc.