In this page, you can retrieve all the tasks within the work order and the estimate the part requirements.
Select the “Est. Part Details" tab in the “Edit Work Estimates” main page.
Enter the following fields in the “Display Filters” group box:
Task # / Description |
The code identifying the task / description of the task. You can enter the number / description in full or specify it partially using the “*” character. The system lists all the task numbers / descriptions that are similar to the values entered here. |
Part # / Mfr. Part # |
The code identifying the part / the number assigned to the part, by the manufacturer of the part. You can enter the number in full or specify it partially using the “*” character. The system lists all the part numbers that are similar to the values entered here. |
Search By |
Use the drop-down list box and select one of the following values based on which part requirement details must be retrieved in the multiline. The system lists the following values:
By default the system leaves this field blank. |
Part Description |
The textual description of the part. (Alphanumeric, 150). You can enter the description in full or specify it partially using the “*” character. The system lists all the part descriptions that are similar to the values entered here. |
Click the “Search” pushbutton to retrieve the details of part requirements estimated for execution of task within the work order.
The system displays the following field above the multiline:
Currency |
The base currency defined for the part. |
Enter the following details in the “Part Requirements” multiline:
# |
The sequence in which the task must be executed. (Integer). |
Task # |
The unique code identifying the task. (Alphanumeric, 30). The task entered here must be a valid task number defined in the “Maintenance Task” business component and must be included within the Work Order. Data entry in this field mandatory, if the task sequence number is not entered. Help facility available. |
The system displays the following field:
Task Description |
The textual description of the task. |
Exec. Status |
The execution status of the task, which could be “Fresh”, “Planned”, “In-Progress”, “Complete”, “Pre-closed”, “Closed” or “Cancelled”. |
Estimation Status |
Indicates the estimation status of the task, which could be “Not Required”, “Pending Estimates”, “Pending Confirmation”, “Confirm Estimates”, “Released Estimates” or “Re-estimates Required |
Est. Baseline # |
The baseline number displayed when the part requirements are estimated and confirmed. If the part requirements were estimated and confirmed multiple times, the baseline number is incremented by 1 every time estimations are updated and moved to baseline history already. |
Enter the following fields:
Estimation Remarks |
Any comments pertaining to the estimation. Note that the system displays “Estimates auto revised to zero due to task cancellation” in this field if the relevant task is cancelled. |
Part # |
The code identifying the part for which the task must be executed. (Alphanumeric, 40). Mandatory. The part entered here must be a valid part number as defined in the “Part Administration” business component. Help facility available. |
Mfr. Part # |
The number assigned to the part, by the manufacturer of the part. (Alphanumeric, 40). Mandatory. The part entered here must be a valid part number as defined in the “Part Administration” business component. Help facility available. |
Mfr. # |
The code identifying the manufacturer of the part. (Alphanumeric, 45). . The manufacturer number entered here must be a valid supplier as defined in the “Supplier” business component. Help facility available. |
UOM |
The unit of measurement for the part. (Alphanumeric, 15). Help facility available. |
Note: The system displays the “Mfr. Part #” and “Mfr. #” fields, and hides the “Part #” field, if the parameter “Enable Manufacturer Part # control in transaction” under the Category ‘Manufacturer Part #’ is set as “Yes” in the “Set Inventory Process Parameters” activity of the “Logistics Common Master” business component. If the parameter is set as “No”, the system displays only the “Part #”.
The system displays the following fields:
Std. Qty. |
The standard quantity of parts for the completion of the task within the work order. |
Enter the following fields:
Est. Qty. |
The estimated quantity of parts required to complete the task within the work order. (Decimal). Ensure that a positive value, is entered in this field. Note that the system displays “0” in this field for cancelled tasks if “Yes” is set as the option for the process parameter “Automatically update estimates as zero for cancelled tasks” in the “Define Process Entities” activity of the “Common Master” business component. |
The system displays the following field:
Reqd. Qty. |
The confirmed quantity of parts required for completion of the task. If the user modifies the ‘Est. Qty’ and checks the “Update Requirements” box, on clicking the “Confirm Estimates” pushbutton, the value in the ‘Est.Qty’ is copied to the ‘Reqd. Qty’. |
Note: The system defaults the ‘Est.Qty’ and ‘Reqd.Qty’ with the ‘Std. Qty.’. If the ‘Need Frequency’ of the part is set as “As Required” and estimation is not done, the system displays ‘Est.Qty’ and ‘Reqd.Qty’ as '0'. If the user enters a value in the ‘Est.Qty’ and clicks the “Estimate Parts” pushbutton, the system defaults the ‘Reqd.Qty’ with the ‘Est.Qty’ specified by the user.
Enter the following fields:
Stock Status |
Use the drop-down list box to specify the stock status of the part. The system lists all the active stock statuses mapped to the “Material Requisition” transaction in the “User Defined Stock Status” business component. You cannot modify the Stock Status, if the value “PBH” is selected. The system leaves the field blank, by default. |
Part Condition |
Use the drop-down list box to specify the condition of the part. The system lists the following values:
The system leaves the field blank, by default. |
The system displays the following:
Need Frequency |
Indicates whether the part is mandatory for the execution of the task. The system displays one of the following values:
|
Enter the following fields:
Probability |
The probability of requirement of the part. (Decimal). The system defaults the value ‘1’, if the “Need Frequency” is set as “Always Required”. You must enter any value ranging between 0 and 1, if the ‘Need Frequency’ is set as “As Required”. |
Repair Classification |
Use the drop-down list box to specify the repair classification in order to differentiate the tasks which are over and above the contract (COA - Contract Over and Above) between the operator and the MRO. The system lists all the ‘Active’ quick codes of type “Repair Classification” defined in the “Maintenance Task” business component. The system leaves the field blank, by default. |
The system displays the following fields:
Part Description |
The textual description of the part. |
Sp. Est. Reqd.? |
Indicates whether part estimation is required for external work orders. The system displays the values “Yes” or “No” based on the value of “COA?” defined in the “Sale Contract – Services” business component. |
Std. Cost |
The standard cost of the part, defined in the “Part Administration” business component. |
PMA? |
Indicates whether the part is a Parts Manufacturer Approval (PMA) part. PMA parts are those parts which are manufactured and supplied by the Original Equipment Manufacturer (OEM). The system displays the following values:
|
Enter the following fields:
Warranty Reco.? |
Use the drop-down list box to specify whether warranty is recommended for the part. The system lists the options “Yes” and “No”. When parts are estimated for a task with Warranty Resolution set as “Yes”, at least one part estimated for the task must have 'Warranty Reco.?' set as “Yes”. If Warranty Resolution is set as “No”, 'Warranty Reco.?' at Task-Part estimation level must be set as “No”. By default, the system displays “No”. |
Estimation Remarks |
Any comments related to the part estimation. |
The system displays the following fields:
Est. Baseline # |
The baseline number displayed when the part requirements are estimated and confirmed. If the part requirements were estimated and confirmed multiple times, the baseline number is incremented by 1 every time estimations are updated and moved to baseline history already. |
Exec. Status |
The execution status of the task, which could be “Fresh”, “Planned”, “In-Progress”, “Complete”, “Pre-closed”, “Closed” or “Cancelled”. |
Effectivity Notes |
A brief note describing the effectivity details of the part with respect to the main core. |
Estimation Status |
Indicates the estimation status of the task, which could be “Not Required”, “Pending Estimates”, “Pending Confirmation”, “Confirm Estimates”, “Released Estimates” or “Re-estimates Required. |
Note: Ensure that Task # - Part # - Repair Classification - Warehouse # combination is not duplicated .n the multiline.
Click the “Get Work Actuals” pushbutton to retrieve the execution related details i.e. actual part requirements utilized for the execution of the task.
Click the “Estimate Parts” pushbutton to estimate the part requirements.
Note: The system displays an error message, if any other concurrent user tries to modify the part requirement details retrieved in the multiline.
The system performs the following on clicking the “Estimate Parts” pushbutton:
Allows modification of part requirements only for those tasks which are in status “Draft”, “Fresh”, “Planned”, “Completed”, “Closed”, or “Ext. Routed”.
Note: For the task which is in “In-Progress” status, if Actuals is not booked and if the part is not issued, modification is allowed.
Allows deletion of a task, only if the status of the task is “Draft”, “Fresh” or “Planned”, and if the Estimation Status of the task is “Confirmed Estimates”.
Note: If the status of task is “In-Progress”, and if Actuals is booked and part is issued, those tasks cannot be deleted.
The system does not allow estimation of parts, if the task has WBS code satisfying the following process parameters defined in the “Set Process Parameters” page of the “Common Master” business component:
‘Workscoping Element?’ set as “Yes”.
‘WBS Level?’ set as “Root Level”.
‘Execution Operations?’ set as “No”.
‘Repair Scheme?’ set as “Yes”.
‘Allow Part Requirement Definition?’ set as “No”.
Updates the Estimation Status of the higher level task, based on the Estimation Status of the child task. The least of all the estimation status of the child tasks is updated as the Estimation Status of the higher level task.
For a Customer based Work Order, if the Estimation status is 'Pending Re-estimates', the system changes the Estimation Status to “Pending Confirmation”, if part is estimated again in the “Part Requirements” tab page.
The system does not allow estimates to be added for cancelled tasks, that is Est. Qty column in the multiline must be “0” for cancelled tasks
Sum of Estimated Quantity
The system displays the Estimated Quantity as follows: Example
Part – P1
Task – T1
Warehouse – W1
Sum of estimated quantity for T1
Task # |
Part # |
Est. Qty. |
Stock Status |
Repair Class. |
Warehouse # |
T1 |
P1 |
4 |
Internal |
DOD |
W1 |
T1 |
T1 |
5 |
Internal |
DOD |
W1 |
On selection of a task T1 in the “Part Requirements” tab in the multiline and the “Estimate Parts” pushbutton, the system displays the sum of estimated quantity as follows:
Task # |
Part # |
Est. Qty. |
Stock Status |
Repair Class. |
Warehouse # |
T1 |
P1 |
9 |
Internal |
DOD |
W1 |
To proceed carry out the following:
Select the "Order Execution & Warranty" tab to record the warranty information details of the part.
Select the “Task Summary Details” tab to provide an overview of the estimates of the work order.
Select the “Resource Requirements” tab to estimate resource requirements for the execution of tasks within the work order.
Select the “Charge Details” tab to estimate charge details for the part / resource estimates.