Entering resource / sign-off requirements for access panel task

What you can do in this page

Unified Glossary

Basics of using a typical web page

Using Online Help

This page allow you to add or modify the details of resources required for executing the access panel task. Tell me more

The “Edit Resource Requirements” page appears.

The system displays the following in the "Task Details" group box:

Task Applicability

Indicates whether the access panel task is applicable for “Aircraft”, “Engine” or “Component”.

Base Aircraft Model #

The number identifying the base aircraft model on which the access panel task can be performed

Task #

The access panel task for which resource details are to be added or modified.

Task Description

The textual description of the access panel task.

Resource Type

Use the drop-down list box to select the type of the resource for which the details are to be added or modified. The options available are “Skills”, “Tools”, “Equipment“ and “Others”. The system sets the field to “Skills” by default.

Update based on Actuals

Check this box if you wish to update the resource details based on the actual details of resources consumed during execution of the access panel task can be updated.

Resource #

The resource required for completing the access panel task. Mandatory. Ensure that the resource of type “Skills” is defined in the “Create Employee File“ activity of the “Employee Information” business component and is in “Active” status. Ensure that the resource of type “Tools”, “Others” and “Equipment” is defined in the “Work Center” business component and is in “Active” status. For each resource type, the resource number must be unique within the multiline. (Alphanumeric, 40).

 

Help facility available.

Note: You cannot modify the existing record in the multiline.

The system displays the following field:

Resource Description

The description of the resource.

Time Unit

Use the drop-down list box to specify the unit of measurement in which the resource time will be specified, which could be “Hours”, “Minutes” or “Days”. The system sets the field to “Hours” by default.

Est. Time

The number of hours, minutes or days for which the resource is required to complete the access panel task (numeric). Mandatory. The value entered here must be positive. For “skill” type resources, if the sum of estimated duration, in terms of hours, is greater than the total man-hours estimated for the access panel task, the system automatically sets the estimated man-hours to the sum of the estimated duration entered in the multiline.

Est. Nos.

The number of resources required for completing the task (integer). Ensure that the value entered in this field is positive.

Approval Reqd.?

Use the drop-down list box to indicate whether the resource is an approved resource or not. The options available are Yes” and “No” and the system displays “No” by default.

Sign-Off?

Use the drop-down list box to indicate whether the user has to sign after the task has been carried out by the resource. The options available are “Yes” and “No” and the system sets the field to "Yes" by default. This field is applicable only for “Skill” type resources.

Note: Ensure that at least one record exists in the multiline.

Note: The system displays an error message, if any other concurrent user attempts to simultaneously modify the resource details.

Note: If the resource group of one of the sub tasks that is being copied, is identified as “Not Required”, then the system ignores the sub task during the copying process.

The system displays the following field in the “Resource Sign-Off Information” group box:

Resource Type

The type of the resource, which could be “Tools”, “Others”, “Skills” or “Equipment”. The system displays “Skills” by default.

Resource #

Use the drop-down list box to specify the resource required for completing the task. The system lists all the resources specified in the “Resource Details” multiline, for which “Resource Type” is “Skills” and “Sign-Off?” flag is set as “Yes”.

Note: If resources are deleted in the “Resource Details” multiline, the system automatically removes the corresponding resources from the “Resource #” drop-down list box.

The system displays the following fields in the “Sub-Task Sign-Off Information” multiline, on clicking the “Get Details” pushbutton:

The system lists all the sub-tasks of the resources for which the “Sign-Off? flag is set as “Yes” in the “Resource Details” multiline.

Seq #

The sequence in which the sub task should be performed, while executing the maintenance task.

Sub Tasks

The sub task that has to be performed while executing the maintenance task.

Resource Group

Use the drop-down list box to specify the resource group. The system lists the following options:

  • “Not Required” – Select this option if sign-off is not required.

  • “Mechanic” – Select this option if sign-off is performed by the mechanic.

  • “Inspector” – Select this option if sign-off is performed by the inspector.

  • “Insp. & Mech.” – Select this option if sign-off is performed by both the inspector and mechanic.

Note: Ensure that at least one record exists in the multiline.

Note: You can set the “Resource Group” only to “Inspector” or  “Not Required”, if the resource group of the sub-task is set to “Inspector” in the previous page.

Note: You can set the “Resource Group” only to “Mechanic” or “Not Required”, if the resource group of the sub-task is set as “Mechanic” in the previous page.

Note: If resources are deleted in the “Resource Details” multiline, the system automatically removes the corresponding sub-task details from the multiline.

The system updates the sub tasks and corresponding resource group against the task number and aircraft model number combination.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Entering resource / sign-off requirements for access panel task– An overview

Edit Access Panel Task - A summary of the activity

This option allows you to add or modify the details of resources required for executing the access panel task. If you wish to define the resources for the access panel task, you can enter details such as resource code, estimated duration, and number of resources needed against each resource type. You can also indicate whether the resource should be an approved resource or not and whether sign off is required for the “Skill” type resource. Based on this information during work reporting sign off sheet will be automatically generated by the system. You can also retrieve resources that have already been defined for the access panel task and modify its details.

This page also allows you to update the sign-off details pertaining to the task. You can also assign the tasks and sub tasks to resource groups in this page.

The system updates the resource/sign-off details and sets the last modified date to the current server date.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

What you can do in this page

Update the resource with the actual parts consumed

Select resource required for access panel task

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Update the resource with the actual parts consumed

You can indicate, whether the resource details has to be updated based on the actual details of resource consumed during the execution of access panel task is updated.

 

 

 

 

 

 

 

 

 

 

 

 

 

Select resource required foe access panel task

You can specify the resource required for completing the access panel task.