Viewing schedule information for engineering document

Unified Glossary

Basics of using a typical web page

Using Online Help

This page enables you to view the periodicity information for the selected engineering document. Tell me more.

The “View Periodicity Information” page appears.

The system displays the following field:

Date Format

The format in which the date fields are to be entered in this page. This format is displayed from the "User Preferences" component based on the login user ID. In case the format is not defined, the system displays the date format from the “Enterprise Modeling” component by default.

The system displays the following in “Eng Doc Details” group box:

Eng. Doc #

The engineering document for which the periodicity details are displayed.

Revision #

The revision number of the engineering document.

Subject

The textual description of the engineering document.

Schedule Type

The schedule type of the engineering document, which could be “One-Time” or “Repeating”.

Update Part Maint. Program

Indicates whether the part maintenance program must be updated. The system displays one of the options “Yes” or “No”.

Task – Applicability Group Details

Use the drop-down list box to select the task – applicability group, which gives the description of the Task # and Maintenance Object # (Aircraft Reg # or Part # - Serial #) as defined in the selected Applicability Group #.

 The system leaves the field blank by default.

The system displays the following in the Task – Applicability Group Details” group box:

Task Description

A description of the task as defined in the interacting “Maintenance Task” business component for “Existing/Improvised” tasks or as defined in the engineering document for “New” tasks.

Aircraft Reg. #/ Part-Serial #

The aircraft registration numbers or part-serial numbers defined for the Applicability Group # separated by a comma.

The system displays the following fields in the “Date Based Schedule Details” group box:

Threshold (Days)

The maximum number of days or hours within which the engineering document must be performed.

Threshold Date

The date on which the engineering document must be performed, in the case of one-time engineering document.

Repeat Interval (Days)

The interval in which the engineering document must be repeated, in the case of recurring engineering document.

Alert Value (Days)

The number of days by which the alert date of the engineering document is deferred

Positive Tolerance (Days)

The upper limit within which the engineering document is to be performed

Negative Tolerance (Days)

The lower limit within which the engineering document is to be performed

Terminating Value (Days)

The terminating value specified for the execution of engineering document in terms of days

Terminating Date

The terminating date specified for engineering document execution

Special Frequency Notes

Any additional remarks or notes pertaining to the frequency of the task. This field can contain the following information:

 
  • Additional information to clarify frequency requirements other than a simple parametric or letter check limit.

 
  • Additional "off-wing" requirement information for tasks that are applicable for engines.

 
  • Method of compliance for conditional tasks, shop-accomplished tasks and crew accomplished tasks.

 

 The system displays following fields in the “Parameter Schedule Details” multiline:

Parameter

The code identifying the consumption parameter based on which the periodicity of the engineering document will be determined.

Parameter Description

The description of the consumption parameter.

UOM

The unit of measurement of the consumption parameter.

Threshold Interval

The interval at which the engineering document must be executed for the consumption parameter.

Threshold Value

The value of the consumption parameter based on which the engineering document will be executed.

Repeat Interval

The interval in which, the engineering document for the consumption parameter must be repeated.

Negative Tolerance

The lower limit within which the engineering document is to be performed

Positive Tolerance

The upper limit within which the engineering document is to be performed

Alert Value

The alert value of the parameter

Terminating Value

The value of the consumption parameter, based on which the engineering document will be terminated.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Viewing periodicity information for engineering document – An overview

View EO - A summary of the activity

This page enables you to view the periodicity information for the selected engineering document.

Date based schedule details

Engineering documents can be of type “One-Time” or “Recurring ”. In the case of “One-Time” engineering document, the maximum number of days or hours within which the Engineering document task must be executed, is specified. In the case of recurring engineering document, the interval in which the Engineering document task  must be repeated, is specified.

Parameter based schedule details

The system displays the code of the parameter based on which the engineering document execution must take place, parameter description and unit of measurement for the parameter. The threshold value of the parameter based on which the engineering document must be completed, the repeat interval value of the consumption parameter and the terminating value are also displayed in the multiline.