Viewing concurrent requirement details for engineering document

Unified Glossary

Basics of using a typical web page

Using Online Help

This page allows you to view the concurrent requirement details of the engineering document. Tell me more.

The “View Engineering Document  Concurrent Requirements” page appears.

The system displays the following in the “Eng. Doc. Details” group box:

Eng. Doc #

The engineering document for which the concurrent requirement details are displayed.

Revision #

The revision number of the engineering document.

Subject

The textual description of the engineering document.

The system displays the following fields in the “Concurrent Requirements” multiline:

Eng. Doc #

The number identifying the engineering document raised earlier, that is related to the current engineering document.

Revision #

The revision number of the engineering document.

Subject

The textual description of the engineering document.

Relationship Type

The type of the relationship between the former engineering document and the current engineering document. The system displays one of the following:

 
  • Simultaneous – indicates that the engineering document raised earlier can be executed simultaneously with the current engineering document.

 
  • Preceding - indicates that the engineering document raised earlier must be executed before the current engineering document.

 
  • Related – indicates that the engineering document raised earlier is related to the current engineering document in any other way.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Viewing concurrent requirement details for engineering document– An overview

View EO - A summary of the activity

This page allows you to view the concurrent requirement details of the engineering document. The current engineering document can be related to one or more engineering documents raised earlier, which describe the pre-conditions for the execution of the current engineering document. For example, you may need to execute an engineering document raised earlier (say Eng. Doc #1), before executing the current engineering document (say engineering document #3). Such requirements are termed as “Concurrent requirements”.

In this page, you can view the engineering document numbers that are already defined as concurrent requirements for the current engineering document. The engineering document number, its revision number, description of engineering document and the relationship of the former engineering document with the current engineering document in terms of the order of execution, that is, whether the former engineering document must be executed along with, or before the current engineering document, are displayed in the multiline.