Grade Cost Master – A Summary of the Activity

The “Grade Cost Master” activity enables you to calculate the cost/rate for a particular grade within a particular period. 

Getting familiar with the pages inside

Go to page…

To carry out the task…

Select Grade Cost Master

Selecting “Grade Cost Master” to calculate the cost for a particular grade for a particular currency type.

 

Grade Cost Master

ØSelect the “Grade Cost Master” activity under “Pre Contracting”.

The “Grade Cost Master” page appears.

ØEnter the following field details in the header:

Organization Unit

From the drop-down list box, select the required option. The combo is defaulted with the login OU for you to choose. Mandatory.

Currency

Select the required currency type from the drop-down list box. The combo is loaded with various currency types for you to choose. The system displays “Select” by default on launch of the page. Mandatory.

Effective Period

On selecting the currency type, the effective period combo gets loaded if grade wise cost has already been defined. The system displays “Select” by default on launch of the page. Mandatory.

Modification Option

From the drop-down list box, select the required modification option. The combo is loaded with the values “Correct” and “Update” for you to choose. The system displays “Select” by default on launch of the page. Mandatory.

New Effective From

Enter the New Effective From date for a new record or for modification option – “update”

 

The “Grade Cost Master” page consists of the following tabs:

4      Onsite/General

4      Offshore

4      Onshore

ØEnter the following field details in the multiline of all the above mentioned tabs:

Grade Set

Select the grade set from the drop-down list. This combo is loaded with all the existing grade sets. The system displays “Select” by default on launch of the page. Mandatory.

Grade

The grade is displayed based on the grade set selected from the Grade Set combo.

Cost

The cost to be charged per UOM for the selected grade. Mandatory.

UOM

The unit of measurement. You are allowed to select the required UOM option from the drop-down list. The combo is loaded with the values “Days”, “Hour” and “Week” for you to choose. The system displays “Select” by default on launch of the page. Mandatory.  

ØClick “Save” to save the details.