Activating / inactivating cost element

Glossary

Basics of using Ramco Enterprise Series web page

This page allows you to activate or inactivate a cost element. Tell me more.

The “Activate / Inactivate Cost Element” page appears.

Cost Element

The code identifying the cost element that you want to activate or inactivate (Alphanumeric, 32).

 

Press <Enter> key.

 

The system retrieves the details of the cost element in the respective fields in the multiline.

Cost Element Type

Use the drop-down list box to select the type of the cost element that you want to retrieve. You can select from “Normal Cost Element”, “Activity Cost Element” or “Allocation Cost Element”. The system displays “All” by default on launch of the page.

User ID

The login ID of the user who created the cost element that you want to activate or inactivate (Alphanumeric, 15).

UOM Code

The code identifying the unit of measurement (Alphanumeric, 10).

Cost Element From

The starting code in the range of cost element codes that you want to retrieve (Alphanumeric, 32).

Note: The code entered in this field must be before or the same as the code entered in the “To” field.

To

The ending code in the range of cost element codes that you want to retrieve (Alphanumeric, 32).

Description

The description of the cost element that you want to retrieve (Alphanumeric, 40).

 

Zoom facility available

Effective Date

Use the drop-down list box to select the date from which the cost element that you want to retrieve is effective. All the start dates of the MAC periods that have been defined for MAC years that are in the “Open” status will be available for selection in the chronological order. The system displays the earliest “Open” MAC period by default.

Note: The date selected in this field must be before or the same as the date selected in the “Expiry Date” field.

Expiry Date

Use the drop-down list box to select the date on which the cost element that you want to retrieve is to expire. All the end dates of the MAC periods that have been defined for MAC years that are in the “Open” status will be available for selection in the chronological order. The system displays the latest “Open” MAC period by default.

Status

Use the drop-down list box to select the status of the cost element. You can select from “Activate”, “Inactivate” or “All”. The system displays “Active” by default on launch of the page.

The system retrieves and displays the following in the “Cost Element Details” multiline based on the search criteria entered:

Cost Element

The code identifying the cost element.

Description

The description of the cost element.

Long Description

The detailed description of the cost element.

Cost Element Type

Indicates the type of the cost element. It could be “Normal Cost Element”, “Activity Cost Element” or “Allocation Cost Element”.

UOM Code

The code identifying the unit of measurement.

Effective Date

The date from when the cost element is in effective use.

Expiry Date

The date till which the cost element is in effective use.

Status

The status of the cost element. It could be “Active” or “Inactive”.

 
  • Active – indicates that the cost element is in effective use.

 
  • Inactive – indicates that the cost element is not in effective use.

Note: You can activate a cost element that is in the “Inactive” status.

The system updates the status of the cost element as “Active”. The system also stores the login ID of the user and the system date along with the cost element details.

Note: You can inactivate a cost element that is in the “Active” status.

The system updates the status of the cost element as “Inactive”. The system also stores the login ID of the user and the system date along with the cost element details.