Maintain Project Cost Plan

A summary of the activity

Glossary

How to use the web page

Using online help

The “Maintain Project Cost Plan” page appears.

*      - Clicking this icon available near certain fields takes you to the help page of the respective field.

Note: Employee Cost –Plan Updation must be created already in order to create the project cost plan.

Plan Stage

From the drop-down list box, select the cost plan stage. The system lists the value as Project.

Project Code

The code identifying the project Mandatory.

On enter, the system displays the following:

Project Name

The name of the project.

Plan Version

From the drop-down list box, select the version number of the cost plan. The system lists all the existing plan versions.

The system displays the following:

Version Date

The version date of the chosen plan version.

Status

The status of the project.

Project Currency

The currency of the project.

Exchange Rate To INR

The exchange rate with respect to the INR currency. Mandatory

On Site Company

From the drop-down list box, select the company codes. The system lists all the onsite companies of the geography responsible for the project.

The system displays the following in the “Effort Size and Schedule” group box:

Approved Effort Onsite

The approved person month in the onsite.

Approved Effort Offshore

The approved person month in the offshore.

Prebuilt Function Points

The pre-built functional points of the cost plan. Mandatory.

Additional Function Points

The additional functional points of the cost plan. Mandatory.

Planned Start Date

The planned start date of the cost plan.

Planned End Date

The planned end date of the cost plan.

Travel Cost

The travel cost incurred by the onsite employee. Mandatory.

Contingency %

The eventual percentage increase in the cost plan.

The system displays the following in the “Cost Plan” group box:

Employee Cost Onsite

The amount spent on the employee on onsite is fetched from the Employee Cost Initial / Updation Plan.

Employee Cost Offshore

The amount spent on the employee on offshore is fetched from the Employee Cost Initial / Updation Plan.

Infrastructure Cost

The infrastructure cost spent on the offshore employee is fetched from the Employee Cost Initial / Updation Plan.

Updated Version

The latest updated version number of the employee cost updation plan.

Cost Group

From the drop-down list box, select the cost group defaulted from the Cost Group master. The system lists “”Cost –Others” and “Training”.

Location

From the drop-down list box, select the location where the cost is incurred. The system lists “Off-Shore” and “On-Site”.

Currency

From the drop-down list box, select the currency of the other cost .The system lists all the currencies of the companies defined in the system.

Amount

The amount of the Other costs.

The system displays the following:

On Site Cost

The total onsite cost.

 

Off Shore Cost

The total offshore cost.

 

Total Cost

The total of onsite and offshore.

Time and Material Info

The information regarding the time and material required for cost plan.

On Actuals Info

The actual information regarding the cost plan.

Justification Note for Efficiency Factor

The justification notes for efficiency factor regarding the cost plan.

Assumption Id

The assumption to the cost plan. This assumption number should be unique without duplication for a project code.

Assumption Category

From the drop-down list box, select the category to which the assumption to the cost belongs.

Assumption Description

The textual description of the assumption to the cost plan.

The system saves the creation details of the cost plan. The status of the cost plan is updated to Draft.

The system saves the modification details of the cost plan.

The system saves the modification details of the cost plan. The status of the cost plan is updated to Approved.

The system saves the modification details of the cost plan. The status of the cost plan is updated to Baselined.

The system saves the modification details of the cost plan. The status of the cost plan is updated to Amended - Draft.

The system saves the modification details of the cost plan. The status of the cost plan is updated to Closed. Once the cost plan is closed, no other action can be performed on it.

The system displays the following in the Data History group box:

Created By

The name of the user who created the cost plan.

Created Date

The date on which the cost plan was created.

Last Modified By

The name of the user who last modified the cost plan.

Last Modified Date

The date on which the cost plan was last modified.