Setting options for Stock Planning
This page deals with setting options for stock planning. Tell me more.
Select the “Set Options” link under the “Stock Planning” business component.
The “Set Options” page appears.
The system, displays the following field:
Date Format |
The format in which the date fields are displayed in this page. This format is displayed from the "User Preferences" business component based on the login user ID. In case the format is not defined, the system displays the date format from the “Enterprise Modeling” business component by default. |
Enter the following fields in the “General Parameter Details” group box:
Reservation during Receipt |
Use the drop-down list box to set the option for reserving a receipt, to “Online” Or “Offline”. |
If set to “Online”, the receipt quantity is automatically reserved by the system. In the case of “Offline” reservation, the quantity will be reserved when the system activity runs as per the scheduler. | |
Reservation mode on Demand Change |
Use the drop-down list box to set the option for reserving a demand, to “Online” Or “Offline. |
If set to “Online”, the demand quantity is automatically reserved. In the case of “Offline” reservation, the quantity will be reserved when the system activity runs as per the scheduler. | |
PR Generation for Problem Demand |
Use drop-down list box to indicate whether a purchase request must be automatically generated for a problem demand. The system displays the options “Automatic” and “Manual”. Set this field to “Automatic”, to enable the system automatically raise a PR whenever there is a problem demand. Set this field to “Manual”, to raise a PR whenever there is a problem demand by executing a batch process. |
Note: If this option is set as "Manual", ensure that the ’Reserve Problem Demand Process’ is configured in Daemon Executor. For more details, refer to the Daemon Executor Online Help.
Method for conversion of |
|
Fractional Quantity |
Use the drop-down list box to select the method of conversion of the fractional quantity. The system lists the following options: |
| |
| |
|
Attempt Delink Relink Process for New Demands |
Use the drop-down list box to indicate whether the “Delink Relink” process must be attempted or not, when new demands come into the system. The “Delink Relink” process takes up all valid demands and receipts, and carries out the process of reservation. Set this field to “Yes”, to enable the system automatically unpeg all demand and receipts, if there is a new demand and attempt fresh pegging. Set this field to “No”, to process new demands by executing a batch process. |
Note: If this option is set as "No", ensure that the ‘Delink/Relink Process’ is configured in Daemon Executor. For more details, refer to the Daemon Executor Online Help.
The system displays the following field in the “Carry Over Count Details” multiline:
Settings for |
The system displays the following: |
| |
| |
| |
| |
| |
| |
| |
| |
| |
|
Enter the following fields in the “Carry Over Count Details” multiline:
Days For Carry Over |
The number of days by which the demand posted by a material request, reservation by visit package or a receipt against a purchase order can be carried over. Ensure that this value is greater than the value in the “Days for Alert Count” field. |
Note: Ensure that the ‘Carry Over Process’ is configured in Daemon Executor. For more details, refer to the Daemon Executor Online Help. |
|
Days for Alert Count |
The number of days set for reminder, for which the demand posted by a material request, reservation by visit package or a receipt against a purchase order can be carried over. |
Note: Ensure that the ‘Alert Count Process’ is configured in Daemon Executor. For more details, refer to the Daemon Executor Online Help.
The system displays the following field in the “Record Statistics” group box:
Last Modified by |
The login ID of the user who last modified the option settings. |
Last Modified Date |
The date on which the option settings were last modified. |
Click the “Set Options“ pushbutton to store the settings.