Shop Quick Actions Hub – A summary of the activity

This activity is a hub that provides a central platform to quickly process and complete the execution of specific work orders, one at a time.

At the onset, the hub highlights critical information on the chosen work order including completion percentage, work progress and closure readiness. From this information, the users can also gauge the factors that are preventing the progress / completion of the work orders.

The planners and aircraft maintenance engineers can perform all possible key actions on shop work orders from this hub including:

4   Update planning details

4   Update shop execution details

4   Update quotation details

4   Update estimates

4   Update removal details

4   Hold / Release tasks

4   Record time against tasks

4   Sign off tasks

4   Complete, Pre-Close or Cancel tasks

4   Print reports

4   Access links to traverse to related activities to view or update information

4   View work order and their root and parent work orders

The hub provides three modes for retrieving / viewing specific wok orders. The first tab – “More Info” comprises of cards that provide brief information on various aspects of the work order, such as customer, removals, Dates, estimates and TAT information. The second tab – Counts displays counts of open tasks, discrepancies, material requests, component removals, observations and returns. The third tab – Search offers user-specific search facility to retrieve precise tasks from the work order.

This screen renders Gantt to display information on the retrieved tasks. A tree representation of tasks from work order helps to understand the task hierarchy and view details of the required task.

Task details including Timesheet Status, Hold Status, Clock Status, Estimation Status, Sign off Status and Main Core Return Status are also presented to the users. By means of a single click, you can access the required screens to accomplish vital actions on the tasks in a work order including:

4   Record observations

4   Create material reqeusts

4   Update componnet removal details

4   Record part consumption

4   Process material requests

In addition, this page offers links that help you to swiftly access screens from other components / business processes including:

4   Route Parts

4   Record Part # / Serial # Change

4   Upload Documents

4   View Associated Doc. Attachments

4   Inquire Stock Availability

The above-listed screens would otherwise require multiple clicks to access them. Further, the relevant data is passed to the link screens thereby saving time and manual effort for the users.

Managing shop work orders

The “Shop Quick Actions Hub” page appears.

Note: The work order you want to work with must be in one of the following statuses only- Fresh, In-Progress or Completed.

The “Manage Your Smart Actions” page appears.

The page displays details of the retrieved shop work order. Note that the work order details may differ based on the job type as illustrated in the table below:

Work Order Job Type

Fields on display

Other Facility and Make

SWO #

 

SWO status

 

Work Center #

 

Part #

 

Serial #

 

Lot #

 

Quantity

 

Customer Name

 

Material Request / Return status

Facility

SWO #

 

SWO status

 

Work Center #

 

Facility Object #

 

Facility #

 

Quantity

 

Main Core Status

Make

SWO #

 

SWO status

 

Work Center #

 

Part #

 

Mfr. Serial # / Mfr. Lot

 

Quantity

 

Job Type

 

Customer Name

 

Main Core Status

4   Current SWO Status

Color Code

Main Core Request / Return status

Black

Planned

Orange

In-Progress

Green

Completed

4   :Main Core Request / Return status

Color Code

Main Core Request / Return status

Black

Not Applicable / Not Required

Orange

Pending Request / Pending issue

Green

Issued / Returned

Grey

Ext. Routed / Ext. Routed - BER / Ext. Routed-Exchange / Scrapped at Work Center / Scrapped at Warehouse

Process Parameter dependency: The process parameter "Default view for loading Shop Quick Actions Hub” under the entity type Shop Work Order Type and the entity All User Defined Work Order Types in the Define Process Entities activity of Common Master sets the default tab on launch of the Shop Quick Actions Hub page. The following table illustrates how the process parameter value determines the tab that must appear on page launch.

Process Parameter: Default view for loading Shop Quick Actions Hub

Sequence / Value

Order

2-Customer, 3-Removal Info, 4-TAT Info, 5-Dates Info, 6-Estimation Info, 7-MOD Info, 8-Parent/Root Info, 9-Repair Info

For example, 4, 8, 9, 5, 6, 7, 2, 3

Any combination of numbers from 2 to 9 separated by comma without duplication

Only the cards associated with the numbers included in the sequence are displayed. The cards of numbers omitted from the sequence will be  not be displayed in the Card section

Default Order

2, 3, 4, 5, 6, 7, 8, 9

Note: By default, 1 represents the Work Order card and will always be displayed as the first card.

Process Parameter: Collapse Document Info cards section by default in the Shop Execution page?

Value

Behavior on launch of the Shop Quick Actions Hub

'0' for 'Not Required'

The 'Document Cards section' will remain collapsed / hidden

'1' for 'Required'

The 'Document Cards section' will be visible to the users

     

More Info section

Process Parameter dependency: You can set the order of the cards as per your requirement by defining the process parameter “Document Info cards display order in the Shop Quick Actions Hub?” under the entity type Shop Work Order Type and the entity All user defined work order types in the Define Process Entities activity of Common Master. The value you define for the process parameter determines the order of the cards in the “More Info” tab of the Shop Quick Actions Hub” page as illustrated in the following table.

The “More Info” tab displays the following cards that provide key details of the shop work order in context. The display order of the cards can be organized as preferred by means of the process parameter.

Card  

Information on display

Work Order

§  Order Description

§  Component # of Main Core

§  Part Description

Ø  Click the “Edit WO Addl. Info link” to open the “Edit Work Order Information” page

Ø  Click the “Work Scoping” link to open the “Record Shop Execution Details” page. The “Initial Workscoping” tab appears by default on launch of the page

Customer

§  Customer Name

§  Order #

§  Contract #

§  Customer #

§  Customer PO #

Ø  Click the “View CO Details” link to open the “Manage Customer Order” page

Removal Info

§  Removed from A/C Reg # / MSN #

§  Removal Date & Time

§  Removal Reason

Ø  Click the “Edit Removal Details” link to open the “Plan Work Order” page. The “Removal & Warranty Details” tab appears by default on launch of the page

TAT Info

§  Target Date

§  Project Completion Date

§  Customer Request Date

§  Promised Delivery Date

Ø  Click the “Plan Work Order” link to open the “Plan Work Order” page.

Dates Info

§  Planned Date & Time

§  Planned Date & Time

§  Actual Start Date & Time

§  Actual End Date & Time

§  Status Message. More details….

SWO Status

Status

Condition

Planned

On Time

Planned Start Date is later than or equal to the Current Date

Delayed Start By <No. of days delayed> Day(s)

No. of days delayed = Current Date - Planned Start Date

Current Date is later than the Planned Start Date

In-Progress

On Time

Planned End Date is later than or equal to the Current Date

AND

Planned Start Date is later than or equal to the Actual Start Date

Delayed Start < No. of days delayed> Day(s)

Planned End Date is later than or equal to the Current Date

AND

Actual Start Date is later than the Planned Start Date

 

Delayed End By < No. of days delayed> Day(s)

Current Date is later than the Planned End Date

Completed

Completed on Time

Planned End Date is later than or equal to the Actual End Date

Delayed End By <No. of days delayed> Day(s)

Actual End Date is later than the Planned End Date

 

Ø  Click the “Plan Work Order” link to open the “Plan work Order” page.

Estimation Info

§  Estimation Status

§  Estimate Required For

§  Quotation Status

Ø  Click the “Record Estimates” link to open the “Edit Work Estimates” page.

Ø  Click the “Record Quotation” link to open the “Manage Quotation Sale” page.

MOD Info

§  MOD IN value of Main Core Part #

§  MOD Out value of Main Core Part #

§  Applied MODs on Main Core Part #

Ø  Click the “View MOD Details” link to open  the “View MOD Details” page

Parent / Root Info

§  Parent WO #

§  Root WO #

§  Root / source MC Part #

§  Root MC Serial #

§  Hierarchy level of SWO # considering Parent SWO and Root SWO

Ø  Click the “View Root WO” to open the “View WO Details” page with details of the root work order of the work order in context.

Ø  Click the “View Parent WO” link to open the “View WO Details” page with details of the parent work order of the work order in context.

Repair Info

§  Repair Process Code

§  Repair Classification

§  Work Required

Ø  Click the “Plan Work Order” link to open the “Plan Work Order” page with details of the work order in context.

Counts section

The Counts section displays the following cards:

Card

Information on display

Tasks

Breakup of of tasks in the work order under two heads – Open and Total

§  Open: Count of all tasks in the Planned and In-Progress status.

Ø  Click on the “Open count” to open the “Record Shop Execution Details” page.

The “Work Actual” tab appears with all the tasks in the 'Planned' and 'In-progress' status from the work order in the Task Details multiline. The Task tree in the multiline expands to display Planned and In-Progress nodes.

§  Total: Count of all tasks in the work order regardless of the status

Ø  Click on Open count to open the “Record Shop Execution Details” page.

§  Click the icon to view details of the tasks.

Discrepancies

Breakup of discrepancies in the work order under two heads – Open and Total

§  Open: Count of all discrepancies in the Under Resolution status

Ø  Click on the “Open count” to open the “Record Shop Execution Details” page.

The “Report Findings” tab appears with all the discrepancies in the 'Under Resolution' status from the work order. The Discrepancy tree in the multiline expands to display the “Under Resolution” node.

§  Total: Count of all tasks in the work order regardless of the status

Ø  Click on Open count to open the “Record Shop Execution Details” page.

The “Report Findings” tab appears with all the discrepancies in the 'Under Resolution' status from the work order. The Discrepancy tree in the multiline expands to display all the nodes underneath.

Ø  Click the  icon to view details of the discrepancies.

Observation

Count of all observations against the work order

§  Open: Count of all observations against the work order

Ø  Click on Open count to open the “Record Shop Execution Details” page.

The “Report Findings” tab appears with all the discrepancies in the 'Under Resolution' status from the work order. The Observation tree in the multiline expands to display all the nodes underneath.

Ø  Click the  icon to open the “Record Observation” popup. More details…

Material

Breakup of materal requests avaiable against the work order under three heads – Request, Issue and Total

§  Request: Count of material requests in the Authorized status

§  Issue: Count of material requests in the Partially Issued  and Confirmed status

§  Total: Count of all material requests in all statuses from the work order

Ø  Click the  icon to view details of the tasks.

Disassembly & Assembly

Breakup of component replacements against the work order under three heads - Off, On and Off/On

§  Off: Count of component removals

§  Click on Off count to open the “Record Shop Execution Details” page.

The “Disassemble & Assemble” tab appears with all the CR transactions with only removals in 'Removed' status from the work order.

§  On: Count of component attachments

Ø  Click on On count to open the “Record Shop Execution Details” page.

The “Disassemble & Assemble” tab appears with all the CR transactions with only attachments in 'Replaced' status from the work order.

§  Of/On: Count of all component replacements

Ø  Click on Off / On count to open the “Record Shop Execution Details” page.

The “Disassemble & Assemble” tab appears with all the CR transactions with only attachments in 'Replaced' status from the work order.

 

4   : This card displays the breakup of material requests available against the work order under three heads – Request, Issue and Total.

4   :This card displays the

4   Pending Return: This card displays the breakup of pending returns against the work order

§  Main Core: Count of main core and associated core pending for return

§  Rem. Core: Count of removed core pending for return

§  Uncons. Part: Count of unconsumed parts pending for return 

Search section

Data Display in GANTT

The Gantt displays the following details of the tasks from the selected shop work order.

Task # / Discrepancy #

The tree displays the tasks / discrepancies and their hierarchy in the work order. Click on the required nodes (based on task status) to display /hide task details.

Description

The description of the task.

TS

The status of the task.

Color Code

Status

Black

Planned

Orange

In-Progress

Green

Completed

The status of the discrepancy

Color Code

Status

Black

Under Resolution (with no work recorded)

Orange

Under Resolution (with work recorded)

HS

The Hold / release status of the task / discrepancy

·         Task / discrepancy is on hold

·         Task / discrepancy has been released

CS

The Clock status of the task / discrepancy.

·         Task / discrepancy is running

·         Task / discrepancy is stopped

ES

The Estimation status of the task / discrepancy

·         Estimation status is 'Pending Estimates', 'Pending Confirmation' and 'Re Estimation Required'

·         Estimation status is 'Confirmed Estimates' and 'Released Estimates'

SS

The Sign-off status of the task / discrepancy

·         BLANK - Sign Off is 'Not Required'

·         SOFF - Signed Off

·         V - Voided

·         M - Pending Mechanic

·         I - Pending Inspector

·         M&I - Pending Mechanic & Inspector

·         R - Rejected

RS

The Return status of the task / discrepancy

·         Pending Return Unconsumed Parts & Return Removed Cores

·         All pending return cores have been returned

Seq #

The sequence number of the task / discrepancy in the shop work order. The sequence number entered must be valid for the SWO-Task # combination. You must enter the sequence number, if the same task number is available more than once for the same shop work order.

Note: The order in the multiline is in the increasing order of Seq # of the task/discrepancy.

Exec. Comm. / Corr. Act.

Any comments entered by the employee regarding execution of the task / discrepancy.

Observation

Click the   icon to record observation on the task / discrepancy.

Request Material

Click the   icon to open the “Material Request” tab in the “Record Shop Execution Details” page to create material requests for the task/discrepancy.

Disassembly

Click the icon to open the “Disassemble & Assemble Core” tab in the “Record Shop Execution Details” page to record removals against task / discrepancy.

Assembly

Click the icon to open the “Disassemble & Assemble Core” tab in the “Record Shop Execution Details” page to record replacements / attachments against task / discrepancy.

Part Consumption

Click the  icon to record part consumption against task / discrepancy.

Material Request

The count of material requests in all statuses against the task / discrepancy.

Component Replacement

The count of component replacements in all statuses against the task / discrepancy.

Processing work orders

The icon appears in the “CS” column for the tasks in GANTT. The  clock start time for the tasks is set to the current station date & time.

The icon appears in the “CS” column for the tasks in GANTT. The  clock end time for the tasks is set to the current station date & time.

The icon appears in the “CS” column for the tasks in GANTT. The  clock start time for the tasks is reset to the current station date & time.

The “Apply Hold” popup appears. More details…

The “Apply Release” popup appears. More details…

The “Sign Off” popup appears. More details…

The “Task Action” popup appears. More details…

The “Task Action” popup appears. More details…

The “Task Action” popup appears. More details…

Apply Hold popup

The “Apply Hold” popup appears with the tasks

Hold Code

Use the drop-down list to select the hold code that you want to associate to the hold action. The drop-down list box displays the Active hold codes defined in Common Master.

Hold Comments

Additional details on the reasons for halting the execution of the tasks.

The icon in the HS column in the GANTT / multiline turns Red.

Release Hold popup

The “Release Hold” popup appears. The multiline appears with the following details of tasks from the work order put on hold.

Task #

The unique identifier of the task on hold from the work order.

Hold Code

The hold code associated with on-hold task.

Hold Comments

Additional details on the reasons for halting the execution of the tasks.

The icon in the HS column in the GANTT / multiline turns Green.

Task Actions popup

The “Task Actions” window appears with the following details of the selected task.

Task #

The task from the work order/ package for which you want to record action.

Description

The description for the task from the work order/ package for which you want to record action.

Status

Use the drop-down list box to select the status based on the action you wish to carry out on the task. The drop-down list box displays the following: Completed, Pre-Closed and Cancelled.

By default, this field displays the current status of the selected task.

Start

The date on and time at which the execution of the task commences.

End

The date on and time at which the execution of the task concludes.

Execution Comments

Additional information on the execution of the task from the inspector or mechanic.

Process parameter dependency: This field is mandatory based on the two process parameters - “Allow Task sign off without any Execution Comments?” and “Allow completion/closure of Tasks without any Execution Comments?” defined under Entity type Package Type and Entity 'Log Card' and all user-defined entities in the Define Process Entities activity of Common Master. The table next illustrates the function of the process parameters.

 

Process Parameter

Value

Impact

Allow Task sign off without any Execution Comments?

1/Allowed

Allows Sign Off against a task even if the user has not provided Execution Comments and if Default Exec. Comments has not been defined against the task in Maintenance Task.

 

0/Not Allowed

Allows Sign Off against a task only if the user has provided Execution Comments or if Default Exec. Comments has been defined against the task in Maintenance Task.

Allow completion/closure of Tasks without any Execution Comments?

1/Allowed

Allows change of the status of the task to Completed or Closed even without Execution Comments and if Default Exec. Comments has not been defined against the task in Maintenance Task.

 

0/Not Allowed

Allows change of the status of the task to Completed or Closed only if the user has provided Execution Comments or if Default Exec. Comments has been defined against the task in Maintenance Task.

Note: On launch of the Task Actions window (on click of the Task Action pushbutton), the Mechanic field in the Sign Off Details group box automatically displays the employee code of the login user under the below-fulfilled conditions:

1.         The process parameter 'Default Sign Off Details in the Task/Discrepancy Action popup in the Work Reporting Hub?' under the entity type 'Package Type' and entity Log Card and User-Defined Packages is  ‘1’/ Yes in the Define Process Parameters activity of Common Master.

2.         The Sign off status is 'Pending Mechanic' or 'Pending Mech&Insp', the login user belongs to 'Mechanic', 'Mechanic & Inspector' resource group and has the requisite skills to Sign Off the task as an Mechanic and Inspector

3.         The Sign off status is either 'Pending Inspector' or 'Pending Mech&Insp', the login user belongs to either 'Inspector' or 'Mechanic & Inspector' resource group and has the requisite skills to Sign Off the task as an Inspector

Mechanic

Select the check box and enter the name of the mechanic who did the sign off for the task in the adjacent input box.

Process parameter dependency: By default, this field displays the employee code of the login user depending on the value set for the process parameter “Default Sign Off Details in the Task/Discrepancy Action popup in the Work Reporting Hub?” under the entity type Package Type and the entity Log Card and User-Defined Package Types in the Define Process Entities activity of Common Master.

Process parameter value

Sign Off Status

Default behavior of the Mechanic  / Inspector field in Task Actions / Discrepancy Actions or on selection of Corrective Action in Discrepancy Actions

1 / Yes

'Pending Mechanic' or 'Pending Mech & Insp'

Displays login user employee code in the Mechanic field, if the login user belongs to the “Mechanic" or "Mechanic & Inspector" resource group and has skills required for signing off the task as Mechanic.

 

'Pending Inspector' or 'Pending Mech & Insp'

Displays login user employee code in the Inspector field, if the login user belongs to the “Mechanic" or "Mechanic & Inspector" resource group and has skills required for signing off the task as Inspector.

 

'Pending Mechanic' or 'Pending Mech & Insp'

Displays login user employee code in the Mechanic and Inspector fields, if the login user belongs to the “Mechanic" or "Mechanic & Inspector" resource group and has skills of both mechanic and inspector required for signing off the task.

0 / No

'Pending Mechanic' or 'Pending Inspector' or 'Pending Mech & Insp'

Users have to input employee code based on the sign off status of the task / discrepancy

 

Help facility available

Inspector

Select the check box and enter the name of the mechanic who did the sign off for the task in the adjacent input box.

Help facility available

RII

Select the check box and enter the name of the mechanic who did the sign off for the task in the adjacent input box.

Help facility available

Additional

Select the check box to enter the name of another employee who also participated in the task sign off in the adjacent input box.

New Comments

More details on the sign off action effected on the task.

Help facility available

Old Comments

The sign off comments recorded previously for the task.

Recording Discrepancy Actions window

Note: The Discrepancy Actions popup will open (will be available) for closed / deferred discrepancies only if the process parameter “Allow review of Closed/Deferred Discrepancies in Discrepancy Action popup of Work Reporting Hub?” under the entity Type Package Type and the entity Log Card and all user defined Package Types in the Define Process Entities activity of Common Master is set as 1 / Allowed.

The “Discrepancy Actions” window appears with the following details for the selected discrepancy.

The window displays the following:

Discrepancy #

The discrepancy from the work order/ package for which you want to record action.

Description

The description of the discrepancy that you wish to process now.

Process parameter dependency: the users can modify the description and ATA # of non-standard tasks and discrepancies based on the definition of the new process parameter ‘Allow modification of Description & ATA # of open Non Routines?’ defined in the Define Process Entities activity of Common Master.

Process parameter

Entity Type

Entity

Value

Impact: The system

Allow modification of Description & ATA # of open Non Routines?

Package Type

All User Defined values including Log Card but excluding "--All Packages--"

0

Does not allow changes in Description and ATA # of non-standard tasks and discrepancies against aircraft

1

Allows changes in Description and ATA #, if the non-standard tasks (in Planned/In progress status) and discrepancies (in Under Resolution status) against aircraft have not yet been signed off

2

Allows changes in Description and ATA # of non-standard tasks (in Planned/In progress status) and discrepancies (in Under Resolution status) against aircraft

Allow modification of Description & ATA # of open Non Routines?

Shop Work Order Type

All Work Order Types

0

Does not allow changes in Description and ATA # of non-standard tasks(in Planned/In progress status) and discrepancies (in Under Resolution status) against component

1

Allows changes in Description and ATA #, if the non-standard tasks (in Draft/Fresh/Planned/In progress status)and discrepancies (in Under Resolution status)  against components have not yet been signed off

2

Allows changes in Description and ATA # of non-standard tasks (in Draft/Fresh/Planned/In progress status) and discrepancies (in Under Resolution status) against component

 

 

 

Recording corrective action for discrepancy

The Corrective Actions multiline displays the following details of the corrective actions undertaken of the discrepancy till date:

#

Indicates the sign off status of the discrepancy

The records are displayed in the chronological order of data entry.

Color code representation for discrepancy items:

Color Code

Status Indicated

Red

On Hold

Black

Under Resolution with no work recorded.

Orange

Under Resolution with work already recorded.

Green

Closed/Deferred/Transferred.

Grey

Cancelled

Sign Off Status

The sign off status of the discrepancy, such as 'Pending Mechanic' or ‘Pending Mech & Insp'.

Corrective Action

Details of the corrective act

Corrective Correction

Details of the corrective action carried out for resolution of the discrepancy.

Process Parameter dependency: Corrective Action is mandatory for a discrepancy to be deferred (Action  = Defer), if the process parameter “Mandate Corrective Action during discrepancy deferral?” under the entity type Package Type and the entity All User-Defined Package Types in the Define Process Entities activity of Common Master is 1 / Yes.

Process Parameter dependency: The users can modify the corrective action for a closed discrepancy only if the process parameter “Allow modification of Corrective Action of Closed Discrepancies in Work Reporting Hub?” under the entity type Package Type and the entity Log Card and all user defined Package Types in the Define Process Entities activity of Common Master is set as 1 for Allowed.

Mechanic

Select the check box and then enter the employee code of the mechanic, if Mechanic Sign Off for the corrective action is mandatory for the discrepancy.

Help facility available

Inspector

Select the check box and then enter the employee code of the inspector, if Inspector Sign Off for the corrective action is mandatory for the discrepancy.

Help facility available

RII

Select the check box and then enter the employee code of the inspector / mechanic, if Mechanic Sign Off / Inspector Sign Off for the corrective action is mandatory for the discrepancy.

Help facility available

Additional

Enter the code of any other employee who has signed off the corrective action.

Help facility available

Changing discrepancy status

Action

Use the drop-down list box to indicate the action to be taken on the discrepancy. The drop-down list box displays the following: Crossed, Part Change Closed, No Fault Found and Cancelled.

Repeat?

Use the drop-down list box to indicate whether the discrepancy has occurred earlier  The drop-down list box displays the following: Yes and No.

Processing discrepancy

The “Sign Off Comments” group box displays the following:

Prev. Comments

Additional details regarding the sign off of the discrepancy recorded previously.

New Comments

Additional details regarding the sign off of the discrepancy to be recorded now.

Start

The date on and time at which the task to resolve the discrepancy commences.

End

The date on and time at which the task to resolve discrepancy concludes.

Part #

The part in which the discrepancy was found.

Help facility available

Serial #

The serial of the part in which the discrepancy was found.

Help facility available

Position Code

The position in which the part – serial associated with the discrepancy was attached in the NHA or aircraft.

Help facility available