Modifying package
Double-click the package # on the time bar in the Gantt chart.
A window appears with the following details of the package.
Package #
Package Type
Package Start Date
Package End Date
Elapsed Time
Est. Man Hrs
Package Status
Package Aircraft Reg #
Package Flight #
Package Priority
Modify those details that are displayed with an asterisk on the left.
Select the Plan Jobs pushbutton to save the changes made to the package.