Manage Engineering Change Order – A summary of the activity
This activity enables you to regulate the revisions in the process plans, product structures and drawings involved in the manufacture of parts.
The technical team must create, confirm and approve an engineering change order with an in-depth narration on the proposed changes in the specific product structure, process plan or drawing prior to the actual revision of the product structure, process plan or drawing. The changes envisaged in the engineering change order are then incorporated and executed in the product structure, process plan or drawing.
Document Status life cycle
Action |
Status |
Next valid Action |
Save |
Fresh |
Confirm |
Cancel |
Canceled |
Not Applicable |
Confirm |
Confirmed |
Approve/Return |
Approve |
Approved |
Incorporating changes in the process plan, product structure and drawing in the Manufacturing Setup BPC. |
Short Close |
Short Closed |
Not Applicable |
Return |
Returned |
Save |
Close |
Closed |
Not Applicable |
Getting familiar with the pages inside
Go to page |
To carry out the task |
Manage Engineering Change Order |
|
Upload Documents |
Uploading associated documents |