You can approve the deferment request details in this page.  Tell me more

The “Approve Deferrals” page appears.

The system displays the following field:

Date Format

The format in which the date fields are to be entered. This format is displayed from the "User Preferences" business component based on the login user id. In case the format is not defined, the system displays the date format from the “Enterprise Modeling” business component by default.

The system displays the following in the “Work Scope Details” multiline:

Deferment Request #

The deferment request selected in the previous page.

Aircraft Reg #

The registration number of the aircraft.

Visit Package #

The number that identifies the visit package.

Revision #

The revision number of the visit package.

Work Center #

The work center in which the deferment request was raised.

Job Type

The job type of the work unit, which could be “Aircraft”, “On-Wing” or “Component Removal”.

Requestor Name

The name of the employee who created the deferment request.

Part #

The part number of the component on which the maintenance activity is planned to be  performed.

Serial #

The serial number of the component on which the maintenance activity is planned to be performed.

Component #

The component on which the work unit is planned to be performed.

The system displays the following in the “Customer Details” group box:

Customer #

The number identifying the customer, who owns the aircraft.

Customer Name

The name of the customer owning the aircraft.

Customer Order #

The number identifying the order placed by the customer.

Aircraft Release Date

The date on which the aircraft will be released to the customer, after executing the visit package.

Note: The “Customer #” and “Customer Name” fields are applicable only when the aircraft is not self-owned and the customer details are recorded in the system.

The system displays the following in the “Deferment Request Details” multiline:

Line #

The unique number generated by the system, to identify the row in the multiline.

Work Order #

The work order for which the deferment request is generated.

Work Unit #

The work unit for which deferment request is generated.

Work Unit Type

The type of the work unit as “Task”, “Procedure” or “Work Package”.

Maintenance Type

The type of the maintenance work, such as overhaul, repair and inspection, to be performed on an aircraft.

Limit Type

The type of deferment of the work unit, which could be “Time Based”, “Usage Based” or “Time & Usage Based”.

Reason Category

The quick code that defines the reason category for deferment.

Requestor Comments

Any additional remarks by the requestor for deferring the work unit.

Action

Use the drop-down list box to select the action taken on the deferment request. The system provides the options “Defer” and “Reject”. The system displays “Defer” by default.

Approval #

The number that identifies the approver of the deferment request Alphanumeric, 18).

Approval Date

The date on which the deferment request was approved (Date Format).

Approver Comments

Any additional remarks by the approver pertaining to the action taken on the deferment request (Alphanumeric, 255).

The system performs the following:

  1. Next schedule date – if the limit type is “Time Based”.

  2. Next schedule value – if the limit type is “Usage Based”.

  3. Next schedule date and next schedule value – if the limit type is “Time & Usage Based”.

To proceed, carry out the following

Top

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

What you can do in this page

Processing a deferment request of a work unit

Modify deferral limits before approval

Top

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Processing a deferment request of a work unit

You can either reject or defer the deferment request, which is in the “Confirmed” status.

Note: On clicking the “Process Deferrals” pushbutton, the system assigns the status “Processed” to the selected deferment requests.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Modify deferral limits before approval

You can process a deferment request, which is in the “Confirmed” status. You can modify the deferral limits before approving the deferment request.

Top

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Approving deferment request in an unplanned visit package – An overview

You can approve the deferment request details in this page. You can enter the approval number and date for the deferment request. You can also select a work unit in this page and modify the deferral limit in the “Edit Deferment Request Details” page.