Viewing work unit details
In this page, you can view the work unit details. You can view the reference details, scheduled details and parameter details for the selected work unit.
Select the “View Work Unit Details” link in the “Select Work Units” page of the “Allocate Work units” activity.
The “View Work Unit Details” page appears.
The system displays the following fields in the “Work Unit Details” group box:
Aircraft Reg # |
The aircraft selected in the “Aircraft Selection” |
Aircraft Model # |
The model to which the aircraft belongs |
Work Unit # |
The work units selected for which the details are displayed. Displays “Multiple”, if the maintenance report for the selected work unit is associated with multiple work units. |
Work Unit Type |
The type of the work unit, which could be “Task”, “Standard Procedure” or “Work Package” |
Work Unit Description |
The textual description of the work unit. |
The system displays the following fields in the “Work Unit References” group box:
Maintenance Program # |
The number identifying the maintenance program with which the work unit is associated |
Revision # |
The revision number of the maintenance program |
Cycle # |
The occurrence of the maintenance event in the maintenance program |
Sch # |
The schedule ID assigned to the work package |
Work Package # |
The work package number associated with the maintenance program |
Source |
The source from which the work unit has been forecasted or raised. The system displays any one of the following:
|
Reference Document Type |
The type of the reference document of the work unit, such as EO, FCD or Maint. Report. |
Reference Document # |
The number identifying the reference document. |
Forecast # |
The forecast number based on which the work unit is forecasted. The system displays "Un-forecasted" for the un-forecasted work units. |
Forecasted At |
The organizational unit at which the work unit was forecasted. |
The system displays the following fields in the “Work Unit Dates” group box:
Earliest Compliance Date |
The date / time before which the work unit should not be executed |
Latest Compliance Date |
The date / time beyond which the work unit should not be postponed |
Schedule Date |
The date / time at which the work unit is to be executed. The system displays the “Threshold Date” as retrieved from the “Discrepancy Processing” business component, if the selected work unit is associated with a maintenance report. |
Alert Date |
The date / time at which the alert message is raised for the execution of the work unit |
Rem Days |
The number of days remaining before execution of the work unit. |
Note: If the work unit is a deferred work unit, the system retrieves the deferment date details in the above fields.
The system displays the following fields in the “Work Unit – Parameter Details” multiline:
Parameter |
The parameter, such as flight hours and engine hours, based on which the work unit is deferred |
UOM |
The unit of measurement of the parameter value |
Earliest Schedule Value |
The minimum value of the parameter, which calls for the initiation of the maintenance action |
Scheduled Value |
The value of the parameter, reaching which the maintenance action is scheduled to be done |
Latest Schedule Value |
The maximum value of the parameter, which calls for the initiation of the maintenance action |
Alert Value |
The value of the parameter on which the alert message is raised for the execution of the work unit |
Rem. Value |
The remaining value of the parameter before the maintenance activity is over due. |
Parameter Description |
The textual description of the parameter |