Select the “Reference Details” tab in the “View Component Work Order Information” page.
The system displays the following in the “Component Ownership Details” group box:
Ownership |
Details of the ownership of the component, which can be “Owned”, “Supplier” or “Customer”. |
Possession Status |
The possession status of the component, which can be “Loaned-in “, “Rented-out” or “PBH”. |
Owning Agency # |
The code of the agency that owns the component. |
Owning Agency Name |
The name of the agency that owns the component. |
PBH Coverage |
Indicates the PBH coverage of the component as per the agreement with the supplier. If the main component is directly listed in the PBH list of the supplier, then this field displays “Direct”. If the component on which the CWO is being created is a child component of a component listed in the PBH list of supplier, then this field displays “Parent”. Otherwise, this field displays “Not Applicable”. |
The system displays the following details in the “Source Document Details” group box:
Source Document Type |
The type of the source document due to which the CWO is generated on the component. The system displays “Work Scope”, “Engineering Order”, “FCD” or “Others”. |
Source Document # |
The number identifying the source document due to which the component work order is raised. |
Source Work Center # |
The number identifying the source work center at which the execution of work order is carried out. |
Removed from Aircraft Reg # |
The aircraft from which the component was last removed for maintenance / repairs. |
Component Replacement # |
The component replacement document due to which the component work order is raised. |
Work Scope # |
The number identifying the work scope against which the component work order has been created. |
Return Option |
Indicates the return option of the part which could be any one of the following:
|
The system displays the following fields in the “Engineering Change Details” group box:
New Part # |
The number of the part after execution of the EO. |
New Serial # |
The serial number of the part after execution of the EO. |
Mod Status # |
The number identifying the mod status of the aircraft or component. |
Sub Assembly Modification |
Indicates the change identified in the engineering order. If any part number change is identified in the EO, this field displays “Part change”. If any serial number change is identified in the EO, this field displays “Serial Change”. If part number and serial number change is identified in the EO, this field displays “Part and serial change”. If neither part nor serial change is identified in the EO, this field displays “No change”. |
Change in Weight |
The change in the weight of the aircraft after the execution of the EO. |
Change in Moment |
The change in the moment of the aircraft after the execution of the EO. |
Change in Electrical Load |
The change in the electrical load of the aircraft after the execution of the EO. |
The system displays the following fields in the “Engineering Service Request Details” group box:
Engg. Service Req # |
The number identifying the engineering service request raised. |
Request Status |
The status of the engineering service request. |
Problem Description |
The textual description of the problem encountered, for which the engineering service request is raised. Zoom facility available. |
The system displays the following in the “Engineering Advice Note Details” group box:
Engg. Advice Note # |
The number identifying the engineering advice note |
Revision # |
The revision number of the EAN. |
Recommendation |
Any solution or recommendation given by the EAN for the problem stated in the ESR. Zoom facility available. |
The system displays the following fields in the “Component Work Order Estimates” group box:
Currency |
The currency in which the cost incurred on the component work order is reported. |
Total Cost |
The total estimated cost that will be incurred on the component work order. |
Child CWO Cost |
The total estimated cost that will be incurred on the child component work orders. |
Material Cost |
The cost of material that will be incurred on the component work order. |
Labour Cost |
The cost of labour (skill) that will be incurred on the component work order. |
Facilities Cost |
The cost of facilities that will be incurred on the component work order. |
Misc. Cost |
Any other cost that will be incurred on the component work order. |
To proceed, carry out the following:
Select the “Object Details” tab to view the details of the maintenance objects associated to the customer order.
Select the “Work Unit Details” tab, to view the details of the work unit for which the work order is created.