Updation Basis Actuals

If the “Updatison Basis” is selected as “Actuals”, and if the work unit was executed on 09.10.2008 (within the specified limits), the Next Schedule Date of the work unit is 29.10.2008 (i.e., 09.10.2008+20 days (Repeat Interval)).