Computation of Next Schedule Value / Date
Next Schedule Date (NSD) / Next Schedule Value (NSV) re-computation based on 'Change Type' and existence of Open Escalation, depending on various values is given below:
Change Type / Open Escalation |
Scenario |
NSD re-computation basis |
NSV re-computation basis |
Correction |
On copy of interval |
|
|
Re-baseline |
On copy of interval |
"Last Performed Date and time" entered by the user if exist, else NSD is not re-computed. |
"Last Performed Value" entered by the user if exist, else NSD is not re-computed. |
If Open Escalation exists for tasks |
On copy of position based schedules |
|
If schedules are copied from position based schedules, the Computation basis controls ‘Next Due Calc. On‘ and ‘Calc. Ref. Value / Date” will be updated as given in the table below, based on the re-computation of NSD / NSV in the Component Maintenance Program:
Condition |
Next Due Calc. On |
Calc. Ref. Value / Date |
If Re-computation is done based on Time Window |
PBS - Time Window |
Corresponding Due date and time / value |
If Re-computation is done based on 'Actual Completion' |
PBS - Actual Completion |
Corresponding actual completion date and time / value |
If Change Type is set as 'Re-baseline' |
PBS - Manual : Re-baseline |
User entered Last Performed Date and Time / Value or Not Applicable |
If Re-computation is done based on 'Threshold' or 'Repeat Interval' |
Initial interval |
Threshold Value / interval or Not Applicable |
If Re-computation is done based on Last Performed Date / Value of Parent task; Related Task Compliance |
PBS - RTC |
Last Performed Date and Time / Value of parent task |
If Re-computation is done based on Last Schedule Date / Value ; Short Term Escalation |
PBS - STE : Last Schedule |
Last schedule Date and Time / Value |
If Re-computation is done based on Actual Completion ; Short Term Escalation |
PBS - STE : Actual Completion |
Actual complied Date and Time / Value |
If Re-computation is done based on installation date |
PBS - Installation Date |
Installation date |
If Re-computation is done based on Mde. Date |
PBS - Mfr. Date |
Installation Date and time |
Note: Last Schedule Value / Date is always updated with ‘Schedule Date and Time or Value’ on last compliance. If schedules are copied from template, "Next Due Calc. On" controls will be updated with the values as given in the above table, without the prefix ‘PBS’. |