Entering facility type resource for a work unit

What you can do in this page

Unified Glossary

Basics of using a typical web page

Using Online Help

This page allows you to add or modify the details of the resources of the “Equipment” or “Tools” type required for executing the work unit. Tell me more.

The “Estimate Resources Requirement – Facilities” page appears.

The system displays the following fields in the “Part Details” group box:

Part #

The number identifying the part for which the facility type resource requirement s are to be defined.

Part Description

The textual description of the part.

Maintenance Process

The maintenance process of the part, which could be “Hard-Time”, “On-Condition” or “Condition Monitoring”.

Program Status

The status of the part program, which could be “Fresh” or “Authorized”.

Revision #

The revision number of the part program.

Work unit #

Use the drop-down list box to select the work unit for which the facility type resource requirement must be specified. The system lists all the work units in “Active” status that have been defined for the part program and prefixes it with “TSK”, “SP” or “WP” based on the type of the work unit.

The system displays the following when you click the “Get Details” pushbutton:

Work Unit Description

The textual description of the task, standard procedure or work package.

Maintenance Type

The type of the maintenance activity to be carried out which could be ““Overhaul”, “Repair”, “Inspection”, "Retire", ”Others” etc.,

Work Center #

The number identifying the work center where the work unit has to be performed.

Work Center Description

The textual description of the work center.

Resource #

The number identifying the resource required for completing the work unit (Alphanumeric, 40). Mandatory. The resource must have already been defined in the “Work Center“ business component and must be unique to the multiline.

 

Help facility available.

Resource Type

Use the drop-down list box to select the type of the resource. The options available are “Tools”, ”Equipment” and “Others”.

Note: In the event of modifying the already associated resource number and type, the system displays an error message. Also, to delete an existing resource number, check the box in the “Select” column of the multiline and click the "Delete" pushbutton.

The system fills in the following field after you click the “Edit Resource Estimates” pushbutton:

Resource Description

The textual description of the resource.

Time Unit

Use the drop-down list box to specify the unit of measurement of the resource time, which could be “Hours”, “Days” or “Minutes”. The system sets the field as “Hours” by default.

Reqd. Duration

The number of hours, minutes or days the resource is required to complete the work unit (Decimal). Ensure that the number entered in this field is positive.

Reqd. Qty

The number of resources required for completing the work unit (Decimal). Mandatory. Ensure that the number entered in this field is positive.

The system displays the following field when you click the “Update Resource Estimates” pushbutton:

Resource Cost

The cost of the resource as defined in the “Work Center“ business component.

Note: Ensure that at least one resource detail is entered in the multiline.

Note: The system calculates the resource cost for the quantity and the duration specified for the resource in the multiline.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Entering facility type resource for a work unit – An overview

Maintain Part Program - A summary of the activity

This page allows you to add or modify the details of the resources of the “Equipment” or “Tools” type required for executing the work unit. If you wish to define the resources for the work unit, you can enter details such as resource code, its type, required duration and number of resources needed. You can also retrieve resources that have already been defined for the work unit and modify its details. The system updates the resource details and sets the current server date as the last modified date.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

What you can do in this page

Select resource type required for work unit

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Select resource type required for work unit

You can specify the type of the resource required for completing the work unit.