Example:

SWO for engine:                               SWO-1

Tasks for the SWO:                          T1 and T2

Plan Start / End date for SWO1:     17-Jun 2011 to 22-Jun 2011

Plan Start date for the task T1:       20-Jun 2011

Backdated reporting Time Limit

(in days):                                             5  More..

The system does not allow modification to this field:

  1. If the “Start date / Time” is modified as 15-Jun 2011.

  2. If the “End date / Time” is modified as 30-Jun-2011.