The system performs the following,

Computes the Next Scheduled Date (NSD) in the following way, for tasks with calendar-based schedule:

NSD = Threshold Value + Reference Date (Induction date or Operational date)

If the Last Performed Date of the work unit is available,

Next Schedule Date = Last Performed Date + Repeat Fixed Interval/Repeat Floating Interval.

4             Computes the Next Scheduled Value (NSV) in the following way, for tasks with usage-based schedule:

If the Last Performed Value of the work unit is not available,

NSV = Threshold Value (if the Threshold Value is greater than the current value of the parameter)

If the Last Performed Value of the work unit is available,

NSV = Last Performed Value + Repeat Fixed Interval / Repeat Floating Interval.

However, if the Threshold Value is available for one or more parameters and if the Repeat Fixed Interval/Repeat Floating Interval is available for more than one parameter, the system computes the NSV as illustrated by an example.

Usage-based schedule values as on 20th July, 2009

Parameter

Threshold Value

Repeat Fixed Interval/Repeat Floating Interval

NSV

FH

100

NULL

100

FC

NULL

50

NULL

EH

NULL

250

NULL

APUH

NULL

250

NULL

Let us assume the FH parameter reached 100 on 22nd July, 2009 and the task was compiled on the same day in accordance with the schedule in the maintenance program. The attribute values (indicated by the Last Performed Value) recorded on 22nd July, 2009 for the calendar-based schedule are as given below.

Parameter

Last Performed Value

Threshold Value

Repeat Fixed Interval/Repeat Floating Interval

NSV

FH

100

100

NULL

NULL

FC

20

NULL

50

70

EH

95

NULL

250

345

APUH

55

NULL

250

305

4             Computes the NSD and NSV in the following way, for tasks with both calendar-based and usage-based schedules, on the basis of the attributes available including Last Performed Date, Last Performed Value and Repeat Fixed Interval/Repeat Floating Interval. More details

Scenario 1: Calendar-based schedule: Threshold Value available, Repeat Fixed Interval/Repeat Floating Interval not available. Usage-based schedule: Threshold Value not available, Repeat Fixed Interval/Repeat Floating Interval available.

Date-based schedule values as on 20th July, 2009

Threshold Value

Repeat Fixed Interval/Repeat Floating Interval

NSD

3 Days

NULL

23rd July, 200

Usage-based schedule values as on 20th July, 2009

Parameter

Threshold Value

Repeat Fixed Interval/Repeat Floating Interval

NSV

FH

NULL

225

NULL

FC

NULL

50

NULL

EH

NULL

250

NULL

APUH

NULL

250

NULL

We assume the task was compiled on 23rd July, 2009 and the values recorded for usage-based parameters on the compiled date are, as given below.

Threshold Value

Last Performed Date

Repeat Fixed Interval/Repeat Floating Interval

NSD

3 Days

23rd July, 200

NULL

NULL

The updated attributes of the calendar-based schedule on 23rd July, 2009would be, as given below.

Parameter

Threshold Value

Las Performed Value

Repeat Fixed Interval/Repeat Floating Interval

NSV (Last Performed Value + Repeat Interval)

FH

NULL

200

225

425

FC

NULL

40

50

90

EH

NULL

225

250

475

APUH

NULL

225

250

475

Scenario 2: Calendar-based schedule: Threshold Value not available, Repeat Fixed Interval/Repeat Floating Interval available. Usage-based schedule: Threshold Value available, Repeat Fixed Interval/Repeat Floating Interval not available.

Date-based schedule values as on 20th July, 2009

Threshold Value

Repeat Fixed Interval/Repeat Floating Interval

NSD

NULL

3 Months

NULL

Usage-based schedule values as on 20th July, 2009

Parameter

Threshold Value

Repeat Fixed Interval/Repeat Floating Interval

NSV

FH

200

NULL

NULL

Let us assume the FH parameter reached 100 on 22nd July, 2009 and the task was compiled on the same day in accordance with the pre-defined schedule. The attribute values on 22nd July, 2009 for the calendar-based schedule were as follows,

Threshold Value

Last Performed Date

Repeat Fixed Interval/Repeat Floating Interval

NSD

NULL

22nd July, 2009

3 Months

22nd October, 2009

The attribute values on 22nd July, 2009 for the usage-based schedule were as follows,

Parameter

Threshold Value

Last Performed Value

Repeat Fixed Interval/Repeat Floating Interval

NSV

FH

200

100

NULL

NULL