Create Material Request – A summary of the activity

Material Request - An Overview

Pages inside the activity

What you can do on this activity

Material Request (MR) is a document through which a user department communicates the need for materials required for the execution of any activity, for a specific date to the respective stocking points, that is the warehouses. For planned maintenance activities, the planning or execution documents such as the visit package have the complete list of material requirement, however different materials may be required in different instances. Hence material request can be generated for different time frames to indicate to the stores clerk when a particular set of materials needs to be issued.

Similarly, there may be an unplanned event, say in a line station. The mechanic can prepare a material request or the stores personnel can create the MR with reference to a technical log. There may even be requirements for general materials like tube lights or even printing stationery. 

The relevant parts are issued from the warehouse as per the material request document. In the event of non-availability of material, the request can serve as a trigger to the material planner to initiate a purchase activity or a stock transfer from another stocking point.

A unique system generated number identifies each material request transaction. The “Create Material Request” page allows you to define the material request details.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Getting familiar with the pages inside

Go to page

To carry out the task

Create Material Request

Creating material request

Edit Material Request

Edit material request

Edit Preferred Serial / Lot Information

Recording preferred serial number and lot number information for a part

Authorize Material Request

Authorize material request

Edit References

Maintaining document references for material request

Inquire Stock Availability

View stock availability

Inquire Stock Availability substitute parts

View Stock Availability of the substitute parts

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

What you can do in this activity

Distinguish material request for AOG situation

View stock availability of the requested part and the substitute part

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Distinguish material request for AOG situation

You can prepare a material request for  the aircraft on ground. In this situation the parts have to be made available immediately because the aircraft cannot fly without the part. MR of this type will be assigned the first priority.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

View stock availability of the requested part and the substitute part

You can view the stock balance details of the requested part and the substitute part.