Selecting engineering document for releasing

Unified Glossary

Basics of using a typical web page

Using Online Help

This page allow  you to select the engineering documents for release or cancellation. Tell me more.

The “Release Engineering Document” page appears.

The system displays the following field:

Date Format

The format in which the date fields must be entered in this page. This format is displayed from the "User Preferences" component based on the login user ID. In case the format is not defined, the system displays the date format from the “Enterprise Modeling” business component by default.

Source Doc Type

Use the drop-down list box to select the type of the modification document or the source document of the engineering document. The system lists all the values defined in the “Create MCR Document Type" activity of the “Common Master” business component.  Leave this field blank, if you wish to retrieve engineering documents irrespective of the source document type.

Eng. Doc #

The unique number of the engineering document (Alphanumeric, 18). You can enter the number in full or specify it partially using the “*” character. The system lists all the engineering document numbers that are similar to the values entered here.

User Status

Use the drop-down list box to select the user status of the engineering document.

  • The system lists all the user statuses of type “Eng Doc - User Status” that are defined in the “Create Quick Code” activity.

The system retrieves the engineering document numbers that are in the user status specified here. Leave this field blank, if you wish to retrieve engineering documents irrespective of their user status.

 

  Eng. Doc. Type

Use the drop-down list box to select the Eng.Doc Type. The system lists the user defined "Document Types" in “Active” status for the "Eng. Doc Type" in the interacting “Configure Document Attributes” activity of the “Common Master” business component. The system leaves the field blank by default.

Exe. Type

Use the drop-down list box to select the execution type. The valid options are “Major” ,  “Minor” and Blank. The system leaves the field blank by default.

Process Ref. #

To retrieve the release engineering document, enter the process reference number applicable for a MCR # and Revision # combination.

Eng. Doc Category

Use the drop-down list box to select the category to which the engineering document  belongs. The system lists all the quick codes of type “Eng Doc-Category” defined in the “Create Quick Code” activity.

The system retrieves all the engineering documents that belong to the category selected here.

ATA #

The  ATA chapter on which engineering document must be executed (Alphanumeric, 16). You can enter the number in full or specify it partially using the “*” character. The system retrieves all the engineering documents containing ATA chapter number similar to the value entered here. Leave the field blank to retrieve all the engineering documents irrespective of the ATA chapter number.

Applicability

Use the drop-down list box to specify the applicability of the engineering document document to be retrieved. The engineering document could be applicable for “Aircraft”, “Engine” or “Component”. The system sets the field to “Aircraft” by default.

MCR #

The maintenance change request against which the engineering document is created (Alphanumeric, 40). The system retrieves all the engineering documents with the MCR number entered here.

Revision #

The revision number of the maintenance change request (Alphanumeric, 40).

MCM: From Date

The starting date, in the range of dates, on which the MCM was conducted (Date Format). The date entered here should be in the format displayed in the “Date Format” field. The system retrieves all the engineering documents for which the MCM was convened on the specified date.

MCM: To Date

The ending date, in the range of dates, on which the MCM was conducted (Date Format). The date entered here should be in the format displayed in the “Date Format” field. The system retrieves all the engineering documents for which the MCM was convened on the specified date. The date entered here should be greater than the “MCM: From Date”.

Aircraft Model #

The number identifying the aircraft model (Alphanumeric, 20). You can enter the number in full or specify it partially using the “*” character. The system retrieves all the engineering documents applicable to the aircraft model specified here.

Part #

The number identifying the part for which the engineering document is applicable (Alphanumeric, 40). You can enter the number in full or specify it partially using the “*” character. The system retrieves all the engineering documents that are applicable for the part specified here.

Note: Depending upon the filter criteria specified, the system retrieves engineering documents, which are in the “Fresh” status, and for which the authorization status is set as “Authorization Not Required” or “Approved”.

The system retrieves only those engineering documents that await login user’s authorization as identified in the work flow configured in the “Work Flow Management” business component.

The system will not retrieve preloaded engineering documents.

The system displays the following fields in the “Search Results” multiline:

Eng. Doc Type

The type of engineering document.

Eng. Doc #

The unique number of the engineering document.

Revision #

 The revision number of the engineering document.

Applicability

Indicates whether the engineering document is applicable for “Aircraft”, “Component” or “Engine”.

Exe Type

The type of execution, whether “Major” or “Minor”.

User Status

The user status of the engineering document.

Process Ref #

The process reference number applicable for a MCR # and Revision # combination

MCR #

The number identifying the MCR against which the engineering document is created

Revision #

The revision number of the maintenance change request

ATA #

The ATA chapter, on which the engineering document must be performed.

Eng. Doc Category

The category to which the engineering document belongs.

Subject

The textual description of the engineering document.

Select All

Check this box to select all the engineering documents in the multiline for bulk releasing or canceling.

Release / Cancellation Comments

Any comment pertaining to the release or cancellation of engineering document (Alphanumeric, 255)

To release engineering documents

Note: On releasing the Engineering Document ensure the following:

The model/part configuration associated to the Engineering Document, is in "Active" status.

The aircraft maintenance program is in "Active" status, if the Engineering Document applicability is set to "Aircraft".

The component maintenance program is in "Active" status, if the Engineering Document applicability is set to "Component" or "Engine".

Note: You cannot release Engineering Documents that are applicable to the aircraft with record status “Frozen”.

The system ensures the following before releasing the engineering document:

a) Then if more than one tasks with ‘Conditionally Evaluated?’ field set as “No” exists, then system would ensure that for all the conditionally-evaluated tasks ‘Conditional’ relationship with any other task exists in the ‘Maintain Task Relationship’ activity in the interacting ‘Maintenance Task’ component.

b)If only one task with ‘Conditionally Evaluated?’ field set as “No” exists, then on release of the engineering document, system would establish ‘Conditional’ relationship between that task and all other tasks with ‘Conditionally Evaluated?’ field set as “Yes”.

The system performs the following on releasing the engineering document:

Note: This action is workflow-enabled. Notification messages can be sent as per the settings you have defined in the "Workflow Management" business component.

Note: Revoking an engineering document will not change any configuration updates, part number changed, new parts created or purchase requests created because of the previous revision.

a) A schedule (calendar or usage based) should exist for each Task # of type Schedule and Applicability Group # combination in "Edit Schedule Information" screen. However, this validation is not applicable if only Model/ Part Effectivity details are only defined in the engineering document.

b) At least one Next Schedule Value and/ or Next Schedule Date should be available for each “Schedule Tracked” task in the ”Initialize Eng. Doc. Schedules” page.

a) If only one task with the Program Item Type as “Schedule Tracked” exists, and the “Conditionally Evaluated?" field is set as "No" the system establishes a “Concurrent Relationship” between the Schedule Tracked tasks and the Non-Tracked tasks. Also, the system add entries in the “Maintain Task Relationship” activity where the “Schedule Tracked“ task will be considered as the primary task and the “Non-Tracked” tasks will be considered as the related tasks with the relationship between the primary and related tasks as “Concurrent – Specific”.

b) If more than one task with the Program Item Type as “Schedule Tracked” exists, the system ensures that a “Concurrent Relationship” exists between the “Schedule Tracked” tasks and the “Non-Tracked” tasks  irrespective the task is conditionally evaluated.

  1. Work units (task or standard procedure) of the engineering documents with applicability “Engine” or “Component”, if “Direct Execution” is marked as “No”.

  2. Part program of the parts identified under the part effectivity of the selected engineering documents, if the “Update Part Program” is set as “Yes”.

  3.  Periodicity details, schedule details and threshold value of the engineering document.

Note: The system deletes the work units (task or standard procedure) of the terminated engineering documents with applicability as “Engine” or “Component” from the component maintenance program and from the central planning / component pending tray. Also the system updates the status of the terminated engineering documents as “Cancelled” and cancellation comments with “Terminated By”.

  1. Updates the sign-off status as “Not Required”, if the resource group is set as “Not Required” for the sub task in the “Edit Sub Tasks” page.

  2. Updates the sign-off status as “Pending”, if the resource group is set as “Inspector”, “Mechanic” or “Insp. & Mech” in the “Edit Sub Tasks” page.

To cancel engineering documents

Note: You cannot cancel Engineering Documents that are applicable to the aircraft with record status “Frozen”.

To view authorization committee comments

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Selecting engineering document for releasing – An overview

You can select the engineering documents for release or cancellation, in this page. You can carry out a search based on the change document type, source document type, engineering document number, user status, Modification Committee Meeting (MCM) that processed the change request, category, ATA chapter, applicability and MCM date.

Based on the search criteria entered, the engineering documents that are assigned to the login user are displayed. You can release or cancel engineering documents in bulk, or select a particular engineering document to be released or cancelled. You can enter release or cancellation comments for the engineering document.

On releasing the engineering document, the task details and the configuration details are updated, and the purchase request is generated for the parts that are required for executing the engineering document.

You can also select a engineering document to view the authorization committee comments.