Example:

Consider that the search result retrieves the records ‘MCR 12/0’, ‘MCR 123/2’, ‘MCR145/1’, ‘Eng. Doc1/1’, ‘Eng. Doc2/0’ and Eng. Doc3/3’.

If the process parameter ‘Tree Sorting basis in Manage Engineering Document’ is set as "0", the tree structure is displayed in the format shown below:

     -  Engineering Mod

-  Eng. Doc1/1 :: Equipment Cooling

-  Eng. Doc2/0 :: Air Conditioning

-  Eng. Doc3/3 :: Passenger Cabin

-  MCR12/0 :: Air Conditioning

-  MCR123/2 :: Door Warning

  -  MCR145//1:: Wiring Changes

If the process parameter ‘Tree Sorting basis in Manage Engineering Document’ is set as "1", the tree structure is displayed in the format shown below:

     -  Engineering Mod

 -  Eng. Doc1/1 :: Equipment Cooling Effec. From Date: 09/11/1999

 -  Eng. Doc2/0 :: Air Conditioning Effec. From Date: 09/11/2000

 -  Eng. Doc3/3 :: Passenger Cabin Effec. From Date: BLANK

 -  MCR123/2 :: Door Warning Effec. From Date: 09/11/1999

 -  MCR12/0 :: Air Conditioning Effec. From Date: 09/11/2000

 -  MCR145//1:: Wiring Changes Effec. From Date: BLANK

If the process parameter ‘Tree Sorting basis in Manage Engineering Document’ is set as "2", the tree structure is displayed in the format shown below:

     -  Engineering Mod

 -  Eng. Doc2/0 :: Air Conditioning Effec. From Date: 09/11/2000

 -  Eng. Doc1/1 :: Equipment Cooling Effec. From Date: 09/11/1999

 -  Eng. Doc3/3 :: Passenger Cabin Effec. From Date: BLANK

 -  MCR12/0 :: Air Conditioning Effec. From Date: 09/11/2000

 -  MCR123/2 :: Door Warning Effec. From Date: 09/11/1999

 -  MCR145//1:: Wiring Changes Effec. From Date: BLANK